Planning application
23 Central Treviscoe St Austell Cornwall PL26 7QP
Works: Extension Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed Rear Extension over existing ground floor kitchen & bathroom space to create a new bedroom, bathroom & larger kitchen, (extension will have flat roof & one rear facing window) and associated works
As published by the council, reference PA25/09217
Application record
- Reference
- PA25/09217
- Type
- Full application
- Status
- Decided
- Decision
- Approved with conditions
- Received
- 9 Jan 2026
- Validated
- 9 Jan 2026
- Decided
- 5 Mar 2026
- Ward
- St Stephen-In-Brannel
- Parish
- St. Stephen-in-Brannel
- Decision by
- Peer Sign Off
- Postcode
- PL26 7QP
Timeline
Dates from the published record
-
9 Jan 2026
Received by Cornwall
-
5 Mar 2026
Decision issued: Approved with conditions
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Heron Architecture Ltd Agent, an architecture practice registered in Kidlington
Active · incorporated 2025 · Kidlington
3 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cornwall granted permission on 5 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Treviscoe Barton Barton Lane Central Treviscoe St Austell PL26 7SW
Non-material amendment in relation to decision notice PA24/06731 dated 17/12/2024 to change the garage roof to corrugated steel, add French doors and Juliet balcony to master bedroom, slightly enlarge the dormer to en-suite of master bedroom, brick quoins to stone barn corners and replace the approved timber and aluminium windows with uPVC painted wood effect casement units of the same form and proportions. Addition of the term self build to the original description of development so to read as Proposed replacement of residentially consented barn PA23/02476 with a new self-build dwelling, including increase in residential curtilage and erection of detached garage.
Granted Amendments New dwelling Loft or dormer +1 9 docsDomestic -
Land West Of Treviscoe Dryers Barton Lane Central Treviscoe St Austell Cornwall PL26 7QN
EIA Sceening Opinion request for proposed development of 20MW electrolytic green hydrogen production facility together with a seperate electrical connection compound, associated underground electrical infastructure, hydrogen pipeline connections and ancillary works
Decided Outline 5 docs -
Treviscoe Barton Barton Lane Central Treviscoe St Austell Cornwall PL26 7SW
Proposed temporary siting of caravan during self-build works
Granted Full applications New dwelling 13 docs -
8 Central Treviscoe St Austell Cornwall PL26 7QW
Submission of details to discharge Conditions 3 contamination 1 and 4 contamination 2 in respect of Decision Notice PA25/03063 dated 10.07.2025
Refused Conditions 3 docs -
8 Central Treviscoe St Austell Cornwall PL26 7QW
Technical Details Consent (TDC) following Permission in Principle approval PA24/09772 dated 11.02.2025 for a single detached self-build dwelling with integral garage. Re-submission of refused application PA25/04245
Granted New dwelling 22 docsDomestic -
Land West Of Treviscoe Dryers Barton Lane Central Treviscoe St Austell Cornwall PL26 7QN
95% historically approved · decision due ~8 Oct
Proposed development of a 20 MW electrolytic green hydrogen production facility (the Hydrogen Site), together with a separate Electrical Connection Compound, associated underground electrical infrastructure, hydrogen pipeline connections and ancillary works
Awaiting decision Full applications 64 docs
Other full applications
In Cornwall
-
PA26/04660 Granted
Sea Spirit Portuan Road West Looe Looe Cornwall PL13 2DN
Erection of a replacement ancillary garden room following the demolition of the former summer house.
-
PA26/06216 Awaiting decision
DP Engineering 1 Jon Davey Drive Treleigh Industrial Estate Redruth Cornwall TR16 4AX
Proposed new compound roof
-
PA26/06113 Awaiting decision
The Captains House Shutta Road East Looe Looe Cornwall PL13 1LU
Proposed timber cabin in the Captains House garden to provide auxiliary self-contained living accommodation for management staff of The Captains House Guest House
-
PA26/06184 Awaiting decision
37 Fore Street Torpoint Cornwall PL11 2AG
Application for the development of HMO from former pub building
-
PA26/04836 Granted
Wall Along South Side Of The Cliff The Cliff Mevagissey Cornwall
Partial demolition and like-for-like reconstruction of a bowed section of parapet wall adjacent to the highway and north of Harbour House, Mevagissey.