Skip to content
PlanIndex Get alerts
Menu

Planning application

8 Central Treviscoe St Austell Cornwall PL26 7QW

Granted Cornwall PA25/09170 Technical Details Consent

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Technical Details Consent (TDC) following Permission in Principle approval PA24/09772 dated 11.02.2025 for a single detached self-build dwelling with integral garage. Re-submission of refused application PA25/04245

As published by the council, reference PA25/09170

Application record

Reference
PA25/09170
Type
Technical Details Consent
Status
Decided
Decision
Granted (CAADs, PIPs and LUs only)
Received
5 Dec 2025
Validated
5 Dec 2025
Decided
30 Jan 2026
Ward
St Stephen-In-Brannel
Parish
St. Stephen-in-Brannel
Decision by
Peer Sign Off
Postcode
PL26 7QW

Site history

Applications at this address on the Cornwall register

This site has had 2 applications since 2025: 1 approved, 1 refused.

  • PA25/09168 Refused

    8 Central Treviscoe St Austell Cornwall PL26 7QW

    Submission of details to discharge Conditions 3 contamination 1 and 4 contamination 2 in respect of Decision Notice PA25/03063 dated 10.07.2025

    Decided 17 Dec 2025 Conditions

Timeline

Dates from the published record

  1. 5 Dec 2025

    Received by Cornwall

  2. 30 Jan 2026

    Decision issued: Granted (CAADs, PIPs and LUs only)

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

G M Design Agent, a design practice

23 applications on PlanIndex · across 2 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cornwall granted permission on 30 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Cornwall's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 8 Central Treviscoe St Austell Cornwall PL26 7QW

    PA25/09168 Submitted 4 Dec 2025 10m away

    Submission of details to discharge Conditions 3 contamination 1 and 4 contamination 2 in respect of Decision Notice PA25/03063 dated 10.07.2025

    Refused Conditions 3 docs
  • Land West Of Treviscoe Dryers Barton Lane Central Treviscoe St Austell Cornwall PL26 7QN

    PA26/02554 Submitted 16 Apr 2026 140m away

    EIA Sceening Opinion request for proposed development of 20MW electrolytic green hydrogen production facility together with a seperate electrical connection compound, associated underground electrical infastructure, hydrogen pipeline connections and ancillary works

    Decided Outline 5 docs
  • Land North Of Treviscoe Dryers Little Treviscoe St Austell Cornwall PL26 7QN

    PA22/00188 Submitted 10 Jan 2022 153m away

    Prior approval under Part 17 Class B of the Town and Country Planning (GPDO) 2015 for the erection of a welfare unit located within the area of an existing planning permission for the winning and working of minerals, and operations ancilliary to mining

    Granted Outline 9 docs
  • Land West Of Treviscoe Dryers Barton Lane Central Treviscoe St Austell Cornwall PL26 7QN

    PA26/04506 Submitted 13 Aug 2026 271m away

    95% historically approved · decision due ~8 Oct

    Proposed development of a 20 MW electrolytic green hydrogen production facility (the Hydrogen Site), together with a separate Electrical Connection Compound, associated underground electrical infrastructure, hydrogen pipeline connections and ancillary works

    Awaiting decision Full applications 64 docs
  • 23 Central Treviscoe St Austell Cornwall PL26 7QP

    PA25/09217 Submitted 9 Jan 2026 302m away

    Proposed Rear Extension over existing ground floor kitchen & bathroom space to create a new bedroom, bathroom & larger kitchen, (extension will have flat roof & one rear facing window) and associated works

    Granted Full applications Extension Windows or glazing 8 docs
  • Westbourne Little Treviscoe St Austell Cornwall PL26 7QN

    PA26/00820 Submitted 12 Feb 2026 424m away

    Submission of details to discharge Conditions 5 contaminated land risk assessment, 6 contaminated land remediation scheme and 7 contaminated land verification report in respect of Decision Notice PA23/07076 dated 20.12.2023

    Granted Conditions 2 docs