Planning application
PA25/08370
Near Penlan Garage Four Winds Bodmin Cornwall PL30 4HH
Proposal
Overhead Electricity Lines application to upgrade an existing overhead line between poles 43H85 and 43HJ24 near Penlan Services, Four Winds, Bodmin, Cornwall, PL30 4HH and as per the plans attached. These works are necessary to make the electricity network 3 phase compatible which will provide customers with 3 phase connection to our distribution network. The overhead line route is approximately 2 kilometres in length and the main scope of the works will be to install a 3rd wire with the necessary additional fixtures and fittings to support the new line. The new line will attach to insulators on the crossarms of the existing poles and will be in between the two existing outer wires meaning that the visual impact of this additional 3rd wire is considered very minimal. This section of line was refurbished several years ago so it is anticipated that most of the poles will not require any changes however our team will inspect each pole before works commence and if any poles are identified to require replacement this will be done on a like for like basis with the landowners consent and ensuring the old apparatus is dismantled and removed from site. On pole 43HJ24 it will require an out of balance stay to be added to it, this is to keep the pole upright and balanced once the additional wire is installed. I have attached a street view plan showing the works area extents and a network plan showing the line to be included in these works all highlighted yellow. One new short span of OHL from 43HJ15 to a new pole which will act as a terminal pole for a new UG cable to be connected.
As published by the council, reference PA25/08370
Timeline
Dates from the published record
-
6 Nov 2025
Received by Cornwall
-
9 Dec 2025
Decision issued: No objections (OHL/OHE/HG apps)
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
PA26/01496 Granted
Near Penlan Services Blisland Bodmin Cornwall PL30 4HH
National Grid are proposing to upgrade an existing overhead line between poles 43H85 to 43HJ15 and 43HJ15 to 43HJA5 near Penlan Services, Four Winds, Bodmin, Cornwall, PL30 4HH and as per the plans attached. These works are necessary to make the electricity network 3 phase compatible which will provide customers with 3 phase connection to our distribution network. The overhead line route is approximately 1.7 kilometres in length and the main scope of the works will be to install a 3rd wire with the necessary additional fixtures and fittings to support the new line. The new line will attach to insulators on the cross arms of the existing poles and will be in between the two existing outer wires meaning that the visual impact of this additional 3rd wire is considered very minimal. This section of line was refurbished several years ago so it is anticipated that most of the poles will not require any changes however our team will inspect each pole before works commence and if any poles are identified to require replacement this will be done on a like for like basis with the landowners consent and ensuring the old apparatus is dismantled and removed from site. On pole 43HJ15 it will require an out of balance stay to be added to it, this is to keep the pole upright and balanced once the additional wire is installed. I have attached a street view plan showing the works area extents and a network plan showing the line to be included in these works all highlighted yellow
-
PA26/02723 Decided
Barn South West Of Higher Carblake Cardinham Bodmin Cornwall PL30 4HH
Prior approval for change of use of barn to 8 residential units including building operations necessary for the conversion
-
PA25/09116 Granted
Penlan Garage Four Winds Bodmin Cornwall PL30 4HH
Part retrospective application for the installation of a Substation by NGED and 2 x EV Rapid chargers
Other other applications
In Cornwall
-
PA26/04973 Awaiting decision
Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB
Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line
-
PA26/04833 Awaiting decision
Shelton Farm Delabole Cornwall PL33 9DA
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ
-
PA26/02728 Granted
Old Redmoor Mine Area Redmoor Road Callington Cornwall
Proposed mineral exploration drilling programme and associated developments involving drilling at 5 sites
-
PA26/04550 Awaiting decision
Land North Of West Langarth Farmhouse West Langarth Cornwall TR4 9AN
Overhead Electricity Lines application to raise the height of an existing overhead 11kv line as per plan 5894345
-
PA26/03364 Granted
Trewinnick Farm Trewinnick Tintagel Cornwall PL34 0HL
Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines towards 43LP11 and connect to new UG cable from 43LP7. Replace pole 43LP11 and construct as a double terminal pole with addition of one new stay to have two stays on pole. Dismantle existing overhead line between 43LP7 and 43LP11 as shown highlighted blue on the attached plan and remove any redundant poles.