Skip to content
PlanIndex Get alerts
Menu

Planning application

Bude Holiday Resort Maer Lane Bude Cornwall EX23 9EE

Awaiting decision Cornwall PA25/07388 Full application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of land for the siting of 29 holiday lodges including associated infrastructure and landscaping

As published by the council, reference PA25/07388

Application record

Reference
PA25/07388
Type
Full application
Status
Awaiting decision
Received
22 Oct 2025
Validated
22 Oct 2025
Ward
Stratton, Kilkhampton And Morwenstow
Parish
Bude-Stratton
Postcode
EX23 9EE

Site history

Applications at this address on the Cornwall register

This site has had 2 applications since 2025.

  • PA25/07165 Awaiting decision

    Bude Holiday Resort Maer Lane Bude Cornwall EX23 9EE

    Proposed closure of the main entrance and improvements to the southern entrance; together with the change of use of 3.1 hectares from touring caravan use to the siting of static caravans / lodges; together with upgraded infrastructure / services; together with construction of one reception building and two shower/toilet block facilities; along with highway surface improvements without compliance with Conditions 2, 6 and 10 of Decision Notice PA16/00035 dated 26th August 2016

    Submitted 22 Sep 2025 Amendments

Timeline

Dates from the published record

  1. 22 Oct 2025

    Received by Cornwall

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cornwall took a median of 50 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

36 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Cornwall for determination, against a statutory target of eight weeks. Over the last year Cornwall decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Maer Gables Maer Lane Bude Cornwall EX23 9EE

    PA25/07544 Submitted 6 Oct 2025 150 yards away

    Proposed construction of single storey extension at rear of dwelling

    Granted Full applications Extension 18 docs
    Small domestic
  • Maer Farmhouse Maer Lane Bude Cornwall EX23 9EE

    PA25/05573 Submitted 7 Aug 2025 200 yards away

    Listed building consent to repair and replace where necessary existing slate roof. Repair existing historic sash windows and replace 20th century casement windows. Replacement of one window with a door on north west elevation. Internal layout alterations.

    Granted Heritage and listed buildings Roofing Windows or glazing 24 docs
  • Bude Holiday Resort Maer Lane Bude Cornwall EX23 9EE

    PA25/07165 Submitted 22 Sep 2025 250 yards away

    93% historically approved · decision due ~17 Nov

    Proposed closure of the main entrance and improvements to the southern entrance; together with the change of use of 3.1 hectares from touring caravan use to the siting of static caravans / lodges; together with upgraded infrastructure / services; together with construction of one reception building and two shower/toilet block facilities; along with highway surface improvements without compliance with Conditions 2, 6 and 10 of Decision Notice PA16/00035 dated 26th August 2016

    Awaiting decision Amendments 36 docs
  • Grenville Gate Northcott Mouth Road Poughill Bude Cornwall EX23 9EF

    PA22/00168 Submitted 6 Jan 2022 350 yards away

    Reserved Matters application for the construction of a dwelling (details following outline consent PA20/09902 dated 22.04.2021).

    Granted Reserved matters 7 docs
    Domestic

In Cornwall

  • PA26/02291 Granted

    Riverside Point Mills Bissoe Truro Cornwall TR4 8RA

    Proposed construction of garage with store over, and change of use of land to domestic curtilage

    Received 2 Apr, published by the council 21 Jul 2026 Full applications
  • PA26/01452 Granted

    Looe Mills Farm Doublebois Liskeard Cornwall PL14 4LD

    Erection of light industrial unit (Use Class E.g.iii), change of use of land, installation of new mains services and associated works

    Received 8 Apr, published by the council 21 Jul 2026 Full applications
  • PA26/02318 Refused

    The Deanery The Avenue Truro Cornwall TR1 1HR

    Rebuild retaining walls on either side of garage block driveway. Place solar panels on the flat roof of garage in east west runs back to back to minimise ballast.

    Received 6 May, published by the council 21 Jul 2026 Full applications
  • PA26/06732 Awaiting decision

    3 Lewman Road Probus Truro Cornwall TR2 4LL

    Rear/side extension to ground floor.

    Received 7 Oct, published by the council 8 Oct 2026 Full applications
  • PA26/03128 Granted

    St Yse Trethevy Tintagel Cornwall PL34 0BE

    Erect single storey front and side extensions.

    Received 18 May, published by the council 21 Jul 2026 Full applications