Planning application
Falmouth Docks Falmouth TR11 4NR
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of on-site buildings, partial demolition of existing wharf structures, construction of new wharf structures and other related construction works, lay down area for floating wind power activities (FLOW), temporary construction area, and ancillary works associated with the redevelopment and modernisation of the existing Falmouth dock infrastructure
As published by the council, reference PA25/01598
Application record
- Reference
- PA25/01598
- Type
- Full application
- Status
- Awaiting decision
- Received
- 27 Feb 2025
- Validated
- 8 Apr 2025
- Ward
- Falmouth Arwenack
- Parish
- Falmouth
- Postcode
- TR11 4NR
Timeline
Dates from the published record
-
27 Feb 2025
Received by Cornwall
-
8 Apr 2025
Validated
Checked as complete and ready for consideration.
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cornwall took a median of 50 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
tor&co limited Agent
114 applications on PlanIndex · across 39 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
173 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Cornwall for determination, against a statutory target of eight weeks. Over the last year Cornwall decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pendennis Shipyard Ltd Bridon Building Third Floor Falmouth Docks Falmouth Cornwall TR11 4NR
Submission of details to discharge Condition numbers 3 (contam risk) and 4 (contam remediate) in respect of Decision Notice PA23/03575 dated 27/09/23
Granted Conditions 3 docs -
Maritime Studios Pendennis Rise Falmouth TR11 4FB
External alterations, including removal and replacement of cladding and balcony decks (previously approved under Lapsed application PA22/03645)
Granted Full applications 20 docs -
Ocean Bowl Pendennis Rise Falmouth Cornwall
Redevelopment of site to provide purpose-built student accommodation block comprising 190 beds, communal facilities (reception, gym, study rooms) along with ancillary infrastructure and landscaping with variation of condition 17 in respect of decision PA17/04077 (APP/DO840/W/17/3182360)
Withdrawn Amendments -
Bar Road Car Park Challenger Quay Tinners Walk Port Pendennis Falmouth Cornwall TR11 3YL
Exception Notice to fell 2 dead sycamore trees
Decided Trees 1 doc -
Imperial Court Bar Road Falmouth Cornwall TR11 4GB
Exception notice for works to Pinus Negra (Black Pine), removal of tree
Refused Trees 6 docs -
20 Campbeltown Way Port Pendennis Falmouth Cornwall TR11 3YE
Conversion of existing integral garage and utility area into habitable room.
Granted Full applications 9 docs
Other full applications
In Cornwall
-
PA26/01452 Granted
Looe Mills Farm Doublebois Liskeard Cornwall PL14 4LD
Erection of light industrial unit (Use Class E.g.iii), change of use of land, installation of new mains services and associated works
-
PA26/02318 Refused
The Deanery The Avenue Truro Cornwall TR1 1HR
Rebuild retaining walls on either side of garage block driveway. Place solar panels on the flat roof of garage in east west runs back to back to minimise ballast.
-
PA26/06732 Awaiting decision
3 Lewman Road Probus Truro Cornwall TR2 4LL
Rear/side extension to ground floor.
-
PA26/03128 Granted
St Yse Trethevy Tintagel Cornwall PL34 0BE
Erect single storey front and side extensions.
-
PA26/06683 Awaiting decision
Lundy View Business Park Hallworthy Camelford Cornwall PL32 9SJ
Change of use of land from agricultural use to Use Classes E amd B8