6 Aug 2025
Received by Cornwall
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
PA26/04174 Awaiting decision
Mill Moorings Trevellan Road Mylor Bridge Falmouth Cornwall TR11 5NE
Works to trees in a Conservation Area, to fell T1 Lawson cypress
-
PA25/06813 Decided
Clipper Cottage 19 New Row Mylor Bridge Falmouth Cornwall TR11 5NB
Works to Trees within a Conservation Area (TCA) - T1 - Olive - Reduce crown. T2 - Willow - Pollard.
-
PA25/07106 Granted
Land To The Rear Of Comfort Road Mylor Bridge Falmouth TR11 5SE
Non material amendment in relation to Decision Notice PA24/08656 dated 13.03.2025: Introduction of a Phase for whole site can be prepared for construction without triggering liability for CIL, Phases 2-5 proposed to be the commencement of development of the buildings on each of the plot
-
PA25/08695 Decided
Land South Of The Orchards Comfort Road Mylor Bridge Cornwall TR11 5SE
Non-material amendment to decision notice PA24/08656 dated 13.03.2025 for a change of proposed roof materials from green roof to a single ply membrane roof, hedge to the north of Plot 3 amended and ASHP locations amended.
-
PA26/00100 Granted
Land To Rear Of Comfort Road Mylor Bridge Cornwall TR11 5SE
Non material amendment in relation to decision notice PA24/08656 dated 13/03/2025 to allow 1. Hedge to the north of Plot 3 amended 2. ASHP Locations amended 3. Approved roof lights shown on Site Plan (previously missing).
-
PA26/01621 Granted
Land To Rear Of Comfort Road Mylor Bridge Falmouth TR11 5SE
Erection of four dwellings with variation of conditions 2 and 14 in respect of decision PA24/08656 dated 13.03.25
Other outline applications
In Cornwall
-
PA26/05331 Awaiting decision
Land To The North Of Creaz-An Bre Foxhole St Austell Cornwall PL26 7SN
Application for Permission in Principle for the construction of up to 8 dwellings (minimum of 4, maximum of 8).
-
PA26/05318 Awaiting decision
Land North Of 13 Chapel Terrace St Blazey Cornwall PL24 2NL
Application for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1)
-
PA26/05284 Awaiting decision
Land On The North Side Of Tros Mergh Penryn TR10 9LB
Application for Permission in Principle for between 2 and 3 dwellings (minimum of 2, maximum of 3)
-
PA26/05239 Awaiting decision
Three Meadows Church Coombe Redruth Cornwall TR16 6RT
Application for Permission in Principle for the construction of up to 2 dwellings (minimum of 1, maximum of 2)
-
PA26/05259 Awaiting decision
Land East Of Willow End Hobbacott Lane Marhamchurch Bude Cornwall
Application for Permission in Principle for the construction of up to 9 dwellings (minimum of 5, maximum of 9)