Planning application
PA24/09819
Land West Of Penpont View Altarnun Launceston Cornwall
Proposal
Outline application for 36 residential dwellings with all matters reserved except for access
As published by the council, reference PA24/09819
Timeline
Dates from the published record
-
31 Jan 2025
Received by Cornwall
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
PA26/03022 Granted
Trewint PL15 7TG
NGED are required to upgrade an existing section of overhead line from 2 wire to 3 wire at Trewint, Cornwall, PL15 7TG. Attached are two plans showing the extent of the proposed works. NGED propose to install a 3rd wire between poles 45NHV8 and 45NHV21 which consist of 12 spans and approximately 1km of overhead line. If any poles along the route require replacement as part of the 3rd wire installation the poles shall be replaced on a like for like basis in the existing positions. NGED will discuss any pole change requirements with the landowners and confirm consent prior to the commencement of works. The 3rd wire scheme shall conform with current overhead line design policies and all works shall be undertaken following NGED's standard techniques and policies.
-
PA21/12353 Granted
Havenlea Altarnun Launceston Cornwall PL15 7SJ
Listed Building Consent for internal works to include removal and installation of various stud walls and repointing of stone floor in living room.
Other outline applications
In Cornwall
-
PA26/05331 Awaiting decision
Land To The North Of Creaz-An Bre Foxhole St Austell Cornwall PL26 7SN
Application for Permission in Principle for the construction of up to 8 dwellings (minimum of 4, maximum of 8).
-
PA26/05318 Awaiting decision
Land North Of 13 Chapel Terrace St Blazey Cornwall PL24 2NL
Application for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1)
-
PA26/05284 Awaiting decision
Land On The North Side Of Tros Mergh Penryn TR10 9LB
Application for Permission in Principle for between 2 and 3 dwellings (minimum of 2, maximum of 3)
-
PA26/05239 Awaiting decision
Three Meadows Church Coombe Redruth Cornwall TR16 6RT
Application for Permission in Principle for the construction of up to 2 dwellings (minimum of 1, maximum of 2)
-
PA26/05259 Awaiting decision
Land East Of Willow End Hobbacott Lane Marhamchurch Bude Cornwall
Application for Permission in Principle for the construction of up to 9 dwellings (minimum of 5, maximum of 9)