Ty Mawr Holiday Park Towyn Road Towyn LL22 9HG

Awaiting decision Conwy 0/53539 Discharge of Conditions

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Approval of condition no 3 (Landscaping and Habitat Management Plan) of planning approval 0/50625 (Change of use of land for siting of static holiday caravans)

As published by the council, reference 0/53539

Application record

Reference
0/53539
Type
Discharge of Conditions
Status
Pending As published: REGISTERED
Received
13 Jul 2026
Validated
15 Jul 2026
Ward
Tywyn / Towyn
Parish
Cyngor Tref Towyn a Bae Cinmel Town Council
Postcode
LL22 9HG

Site history

Applications at this address on the Conwy register

This site has had 3 applications since 2018: 2 approved, 0 refused.

  • 0/53406 Granted

    Ty Mawr Holiday Park Towyn Road Towyn LL22 9HG

    Proposed new maintenance building

    Decided 3 Aug 2026 Full applications
  • 0/44888 Granted

    Ty Mawr Holiday Park Towyn Road TOWYN LL22 9HG

    Display of 2 no. non illuminated pole mounted entrance signs and 2 no. non illuminated pole mounted no entry signs

    Decided 16 Apr 2018 Advertising

Timeline

Dates from the published record

  1. 13 Jul 2026

    Received by Conwy

  2. 15 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Conwy took a median of 73 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Conwy for determination, against a statutory target of eight weeks. Over the last year Conwy decided condition discharge and variation applications in a median of 62 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Ty Mawr Holiday Park Towyn Road Towyn LL22 9HG

    0/53406 Submitted 27 Apr 2026 50 yards away

    Proposed new maintenance building

    Granted Full applications 22 docs
  • Ty Mawr Holiday Park Towyn Road Towyn LL22 9EN

    0/43744 Submitted 16 Feb 2017 50 yards away

    Discharge of condition no. 3 of planning consent 0/43420 (Demolition of existing caravan sales building and part demolition of existing holiday offices. Refurbishment including new double doors ands screens to existing holiday park offices.)

    Granted Conditions Demolition 8 docs
  • Ty Mawr Holiday Park Towyn Road TOWYN LL22 9HG

    0/44888 Submitted 15 Feb 2018 50 yards away

    Display of 2 no. non illuminated pole mounted entrance signs and 2 no. non illuminated pole mounted no entry signs

    Granted Advertising 18 docs
  • Star Tyre Centre Towyn Road Towyn LL22 9EY

    0/53538 Submitted 9 Jul 2026 150 yards away

    The proposal comprises the retrospective raising of the roof of an existing commercial building by approximately 0.4 - 1.4 metres. The existing roof has been replaced with a new sheet metal roof at the increased height, while the external walls remain clad in corrugated metal sheeting to match the existing building. New black metal trim has been installed around door openings and at the junctions between the walls and roof. There is no change of use.

    Granted Full applications 10 docs
  • Golden Gate Holiday Centre Towyn Road Towyn LL22 9HU

    0/46840 Submitted 1 Nov 2019 300 yards away

    Proposed addition of railings to existing boundary wall at Golden Gate Holiday Centre, Towyn Road, Towyn

    Granted Full applications 15 docs
    Small domestic
  • Golden Gate Holiday Centre Towyn Road Towyn LL22 9HU

    0/44584 Submitted 9 Nov 2017 300 yards away

    Discharge of condition no 4 of planning approval 0/44333 (Alterations, extensions and refurbishment of the Club House Building to also provide swimming pool and climbing wall.)

    Granted Conditions Extension 9 docs

In Conwy

  • 0/53593 Granted

    Land Off Heol Dirion Colwyn Bay LL29 8QA

    Approval of condition nos 5 (Soft Landscaping) 6 (Hard Landscaping) 8 (Materials) 9 (Locations of Tactile Crossing Points) & 12 (Street Lighting Scheme) of Planning Approval 0/52376 (Proposed development of 27 no. dwellings (affordable homes) on land at Heol Dirion, Colwyn Bay)

    Received 5 Aug, published by the council 25 Aug 2026 Conditions
  • 0/53541 Granted

    The Outlook Pydew Road Bryn Pydew Llandudno Junction LL31 9QD

    Approval of Condition no, 4 (Specification of roof and external materials) of Planning approval 0/51320 (Erection of dwelling, car parking and associated landscaping)

    Received 2 Jun, published by the council 7 Aug 2026 Conditions
  • 0/53605 Granted

    Evangelical Fellowship Mill Road Llanfairfechan LL33 0TG

    Approval of condition nos 2 & 3 (Materials) of planning approval 0/53125 (Application for reserved matters seeking approval of the details of the appearance, landscaping, layout, access and scale associated with Outline Planning Permission Ref 0/52471)

    Received 10 Aug, published by the council 25 Aug 2026 Conditions
  • 0/53602 Granted

    12 Hawes Drive Deganwy LL31 9BW

    Approval of Condition no. 4 (Biodiversity Enhancement Plan) of Planning Approval 0/53357 (Demolition of existing garage and rear flat roof extension to facilitate the construction of a proposed rear and side flat roof extension. Demolition of two existing rear dormers and erection of a single replacement rear dormer, along with replacement of the existing front dormer. Removal of existing uPVC front porch and installation of 80mm external wall insulation. New air source heat pump.)

    Received 30 Jul, published by the council 25 Aug 2026 Conditions
  • 0/53622 Granted

    Porth Eirias In The West to Splash Point (By Old Colwyn Arches) In The East

    Approval of condition no 9 (Construction Site & Traffic Management Plan (CSTMP)) of planning approval 0/49272 (Planning application seeking full planning permission for the implementation of a coastal and storm defence scheme comprising of a series of coastal protection measures, including the construction of a rock revetment along with alterations to provide improved pedestrian and cycle access, and associated public realm improvement works along Colwyn Bay, from Porth Eirias in the west to Splash Point (by Old Colwyn Arches) in the east)

    Received 17 Aug, published by the council 30 Aug 2026 Conditions