Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Gadlys Park Road Llanfairfechan LL33 0NL

Granted Conwy 0/53506 Full

Works: Demolition

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Demolition of the existing rear stack on the north east corner of the roof and covering the resulting void with slates to match the existing adjoining slates.

As published by the council, reference 0/53506

Application record

Reference
0/53506
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
30 Jun 2026
Validated
7 Jul 2026
Decided
24 Aug 2026
Ward
Pandy
Parish
Cyngor Tref Llanfairfechan Town Council
Decision by
Case Officer
Postcode
LL33 0NL

Timeline

Dates from the published record

  1. 30 Jun 2026

    Received by Conwy

  2. 7 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. 24 Aug 2026

    Decision issued: Approved With Conditions

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Coed Mawr Village Road Llanfairfechan Conwy

    0/46865 Submitted 4 Nov 2019 34m away

    Removal of traditional single glazed sliding sash timber framed windows and the installation of replacement double glazed uPVC casement windows to the front, side and rear elevations of the first and second floor

    Refused Full applications Windows or glazing 19 docs
  • Northfield The Close Llanfairfechan Conwy LL33 0AD

    0/53000 Submitted 27 Oct 2025 78m away

    Removal of external shower room door and infilling the opening plus the installation of an extractor fan. Internal replacement of a macerator toilet with fully plumbed toilet and internal refurbishment of shower room including new fittings, tiling, flooring, and radiator

    Granted Heritage and listed buildings 16 docs
  • 32 Parc Henblas Llanfairfechan Conwy LL33 0RW

    0/52841 Submitted 19 Sep 2025 89m away

    T2 (Tag number 0806), Sycamore, crown reduce by 4 metres to appropriate leader.

    Granted Trees 7 docs
  • Brooklands The Close Llanfairfechan Conwy LL33 0AD

    0/47070 Submitted 28 Jan 2020 95m away

    Reduce 1 no Beech Tree

    Granted Trees 2 docs
  • Bolnhurst The Close Llanfairfechan LL33 0AD

    0/53455 Submitted 8 Jun 2026 98m away

    1 x Maple Tree crown reduction approximately at red line annotated on photo included in planning. Approximately 2-5ft.

    Granted Trees 6 docs
  • Bolnhurst The Close Llanfairfechan LL33 0AD

    0/52080 Submitted 23 Oct 2024 98m away

    Approval of condition no 3 (Programme of Building Recording & Analysis) of Listed Building Consent 0/51845 (1. Modification to downstairs bathroom. Removal of internal supporting post and beam and replacement with a cross brace. Relocation of internal timber partition (non loadbearing) 2. Exterior redecoration of entire property including gutters. Change of paint colour to match all other properties on the same road.(Listed Building Consent)

    Granted Conditions 8 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications