Planning application
Tan Y Bryn 4 Whinacres Conwy LL32 8ET
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Proposed demolition of chimney, front entrance porch and detached garage and erection of wrap-around extension with flat roof to form garage to side and additional habitable rooms to rear, and erection of front extension with flat roof to form enlarged entrance hall.
As published by the council, reference 0/53332
Application record
- Reference
- 0/53332
- Type
- Full
- Status
- FINAL DECISION
- Decision
- Approved With Conditions
- Received
- 25 Mar 2026
- Validated
- 2 Apr 2026
- Decided
- 7 May 2026
- Ward
- Conwy
- Parish
- Cyngor Tref Conwy Town Council
- Decision by
- Case Officer
- Postcode
- LL32 8ET
Timeline
Dates from the published record
-
25 Mar 2026
Received by Conwy
-
2 Apr 2026
Validated
Checked as complete and ready for consideration.
-
7 May 2026
Decision issued: Approved With Conditions
-
7 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Cartref 6 Whinacres Conwy LL32 8ET
Certificate of lawfulness for the existing development of a single storey rear kitchen extension and single storey side garage extension
Granted Lawful development Extension 14 docsSmall domestic -
13 Mona Road Conwy Conwy LL32 8HF
A single storey rear extension to provide a bedroom and bathroom
Granted Full applications Extension 12 docsSmall domestic -
Dol Heulog 26 Whinacres Conwy LL32 8ET
Single storey extension to front (South), single storey link extension to rear (North)
Granted Full applications Extension 17 docsSmall domestic -
Morfa Conwy Business Park, Unit 5 Ffordd Sam Pari Conwy LL32 8HH
Install non-permeable concrete hardstanding, base and new tarmac hardstanding with associated drainage.
Granted Full applications 10 docs -
Glan Y Mor 18 Morfa Drive Conwy LL32 8EP
Non material amendment to planning approval 0/51812 (Two storey side extension to provide a larger open plan living space and a first floor master bedroom. 2 No dormers increased in size on the front elevation.) to allow for changes to the window design to the front elevation
Granted Amendments Extension Loft or dormer +1 7 docs -
Beechwood Court Mountain Road Conwy LL32 8PY
G1, fell 12x Ash. T1, fell Beech. T2, crown reduce Beech upper canopy to below the tear out/snap. T3, fell Sycamore. G2, 4x Douglas Fir, clean each canopy (deadwood, remove damaged branches, crown thin) and crown lift to 4 metres above ground. G3, 4x Douglas Fir, remove snapped limbs, dead wood, and thin canopies. Fell the furthest Western Douglas fir with die back. G4, fell 3x Lawson Cypress. T4, Oak, minor deadwooding and reduction of lateral branches by up to 3 metres. T5, fell Sycamore. G5, fell/make safe dead or dying trees next to highway
Granted Trees 16 docs
Other full applications applications
In Conwy
-
0/52696 Granted
Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY
Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd
-
0/53549 Refused
2 A Mostyn Street Llandudno LL30 2PS
Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)
-
0/53528 Refused
Riviera 13 Arvon Avenue Llandudno LL30 2DY
Change of use from guest house (C1) to a single dwellinghouse (C3)
-
0/53502 Granted
15 Maes Rhun Tyn Y Groes Conwy LL32 8PA
Erection of side/rear extension, with infill, part conversion of existing garage
-
0/53550 Granted
60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP
Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.