Skip to content
PlanIndex Get alerts
Menu

Planning application

Morfa Conwy Business Park, Unit 5 Ffordd Sam Pari Conwy LL32 8HH

Granted Conwy 0/47203 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Install non-permeable concrete hardstanding, base and new tarmac hardstanding with associated drainage.

As published by the council, reference 0/47203

Application record

Reference
0/47203
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
6 Mar 2020
Validated
31 Mar 2020
Decided
5 May 2020
Ward
Conwy
Parish
Cyngor Tref Conwy Town Council
Decision by
Case Officer
Postcode
LL32 8HH

Timeline

Dates from the published record

  1. 6 Mar 2020

    Received by Conwy

  2. 31 Mar 2020

    Validated

    Checked as complete and ready for consideration.

  3. 5 May 2020

    Decision issued: Approved With Conditions

  4. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Penmaen Crescent Conwy LL32 8HD

    0/53058 Submitted 5 Dec 2025 46m away

    Proposed ground floor extension with part first floor extension including internal and external alterations

    Granted Full applications Extension 23 docs
  • 25 Penmaen Road CONWY LL32 8HA

    0/45574 Submitted 3 Sep 2018 49m away

    Approval of matters required by condition 3 of planning permission 0/44731 (Change of use of former shop to form extension to dwelling (Retrospective))

    Granted Conditions Extension 7 docs
    Domestic
  • Parc Menter Tre Morfa Enterprise Park Parc Cae'r Seion Conwy LL32 8HF

    0/48371 Submitted 19 Mar 2021 95m away

    Variation of condition no 2 of planning approval 0/44795 (Light Industrial Park consisting of a range of industrial units, site access, drainage infrastructure and other ancillary elements including landscaping (Outline)) to allow for an extension to the submission of the reserved matters

    Granted Full applications Extension 18 docs
  • Former Landfill Site North of Penmaen Road Conwy Morfa Conwy LL32 8HF

    0/46815 Submitted 9 Oct 2019 95m away

    Approval of condition no 5 &18 of planning consent 0/44795 (Light Industrial Park consisting of a range of industrial units, site access, drainage infrastructure and other ancillary elements including landscaping (Outline))

    Granted Conditions 23 docs
  • Land North Of Penmaen Road Conwy LL32 8HF

    0/46826 Submitted 9 Oct 2019 95m away

    Approval of condition no 3 & 16 of planning approval 0/44796 (Construction of a Light Industrial Unit)

    Granted Conditions 17 docs
  • Plot 6, Former Landfill Site North of Penmaen Road, Conwy Morfa Conwy LL32 8HF

    0/48430 Submitted 16 Apr 2021 95m away

    Display of 3 no non illuminated fascia signs

    Granted Advertising 15 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications