Planning application
Llanddulas Quarry Abergele Road Llanddulas
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application under Section 73 to vary conditions previously attached to Planning Permission 0/32924, to allow an extension of the consented period for the winning and working of limestone at Llanddulas Quarry for an additional 10 years, up to 31 December 2035, together with associated consequential amendments to related conditions.
As published by the council, reference 0/53173
Application record
- Reference
- 0/53173
- Type
- Full
- Status
- REGISTERED
- Received
- 19 Dec 2025
- Validated
- 3 Feb 2026
- Ward
- Gele and Llanddulas, Llysfaen
- Parish
- Cyngor Cymuned Llanddulas a Rhyd-y-Foel Community Council, Cyngor Cymuned Llysfaen Community Council
Timeline
Dates from the published record
-
19 Dec 2025
Received by Conwy
-
3 Feb 2026
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 31 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Conwy took a median of 72 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
65 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Conwy for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Llanddulas Quarry, Landfill Site Abergele Road Llanddulas Abergele LL22 8HP
Approval of condition 2 (Restoration & Aftercare) of planning consent 0/48090 (Variation of condition no 1 and removal of condition no 8 of planning consent 0/38492 (Extension to existing green waste compost facility to increase operational area and to allow for the continued use of the operation in accordance with the lifespan of the wider landfill site.) to allow for continued use until 31/12/2055 or the life of the landfill site and for the removal of reference to eco pods.)
Granted Conditions Extension 7 docs -
Caersalem Chapel Abergele Road Llanddulas Abergele Conwy LL22 8HP
Alterations and construction of balcony to rear of existing dwelling
Granted Full applications 10 docsDomestic -
Tanrallt Hall Abergele Road Llanddulas Abergele LL22 8HR
Approval of condition no 5 (Means of Enclosure) of planning approval 0/51408 (Variation of conditions 2,6,7,8,9,14 & 17 of planning consent 0/50158 (Erection of 3 no. Dwellings together with associated access, parking and landscaping) to allow for the substitution of house type on plot 3 from a detached house to a detached bungalow)
Granted Conditions New dwelling 7 docsSeveral homes -
Tanrallt Hall Abergele Road Llanddulas Abergele LL22 8HR
Erection of 3 no. dwellings together with associated access, parking and landscaping
Granted Full applications 57 docsSeveral homes -
4 Gwynfryn Terrace Pentregwyddel Road Llysfaen LL29 8FH
Proposed single Heat Pump installation to rear of dwelling
Granted Full applications 11 docsDomestic -
7 Ffordd Y Graig Llanddulas Abergele LL22 8LY
New single storey extension to rear of existing bungalow.
Granted Full applications Extension 8 docsSmall domestic
Other full applications applications
In Conwy
-
0/52696 Granted
Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY
Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd
-
0/53549 Refused
2 A Mostyn Street Llandudno LL30 2PS
Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)
-
0/53528 Refused
Riviera 13 Arvon Avenue Llandudno LL30 2DY
Change of use from guest house (C1) to a single dwellinghouse (C3)
-
0/53502 Granted
15 Maes Rhun Tyn Y Groes Conwy LL32 8PA
Erection of side/rear extension, with infill, part conversion of existing garage
-
0/53550 Granted
60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP
Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.