Skip to content
PlanIndex Get alerts
Menu

Planning application

Capel Horeb Bryn Rhyd Yr Arian Llansannan LL16 5NR

Awaiting decision Conwy 0/50747 Full

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of disused and dilapidated chapel to form 2 self-contained apartments

As published by the council, reference 0/50747

Application record

Reference
0/50747
Type
Full
Status
Pending As published: REGISTERED
Received
9 Mar 2023
Validated
10 May 2023
Ward
Llansannan
Parish
Cyngor Cymuned Llansannan Community Council
Decision by
Case Officer
Postcode
LL16 5NR

Timeline

Dates from the published record

  1. 9 Mar 2023

    Received by Conwy

  2. 10 May 2023

    Validated

    Checked as complete and ready for consideration.

  3. 25 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 July 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Conwy took a median of 73 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

48 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Conwy for determination, against a statutory target of eight weeks. Over the last year Conwy decided full applications in a median of 83 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Bridge along B5382 Bryn Rhyd Yr Arian

    0/53628 Submitted 19 Aug 2026 0.3 miles away

    94% historically approved · decision due ~21 Oct

    There is Bulging in the parapet walls and spandrel walls. Additionally there has been a RTC cousing one section of the parapet to collapse. Proposed works: - Take down the Parapet and spandrel walls - Take out the fill and expose the arch for inspection - Reconstruct the spandrel and parapet walls using the same stone - Lightweight mass concrete fill (LC16/18). Placement of concrete to ensure even loading of the arch barrel at all times - Reinstate the road For more detail refer to Design Drawing (Listed Building Consent)

    Awaiting decision Heritage and listed buildings Demolition 13 docs

In Conwy

  • 0/53489 Granted

    Bryn Hafod Llethr Gwytherin Abergele LL22 8YF

    This is the resubmission of 0/52999 - Refurbishment of 3 adjoining derelict barns and conversion to ancillary family accommodation; partial demolition and rebuild of one barn on advice of structural engineer; raising a roof by 800mm to accommodate 1st floor; repointing and repair of original stonework; addition of new windows and skylights; upgrading 2 roofs finishes to slate.

    Received 2 Jun, published by the council 7 Aug 2026 Full applications
  • 0/53636 Granted

    61 B Conway Road Colwyn Bay LL29 7LG

    Variation of Condition no.2 of Planning Approval 0/52534 (PROPOSED CONVERSION OF EXISTING GARAGE/OFFICE SPACE TO ANNEX AND PROPOSAL OF A SINGLE STOREY REAR EXTENSION) to allow for changes to approved plans.

    Received 19 Aug, published by the council 6 Sep 2026 Full applications
  • 0/53572 Granted

    Neuadd Y Plwyf Llanefydd Llanefydd Conwy LL16 5EA

    Installation of a shipping container for storing equipment from the village hall

    Received 11 Jun, published by the council 14 Aug 2026 Full applications
  • 0/53556 Granted

    Sheraton West Parade Llandudno LL30 2BD

    Proposed Extensions & Alterations, and Garage Extension

    Received 11 May, published by the council 7 Aug 2026 Full applications
  • 0/53597 Granted

    Welsh Assembly Government Buildings Sarn Mynach Llandudno Junction LL31 9RZ

    Installation of Battery Energy Storage System (BESS) units, including associated enclosure, infrastructure and ancillary works.

    Received 6 Aug, published by the council 25 Aug 2026 Full applications