Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Adj Merton Court Fernbrook Rd Penmaenmawr LL34 6DE

Granted Conwy 0/47803 Full

Works: New dwelling

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Residential development for 3No. two-bedroomed terraced houses

As published by the council, reference 0/47803

Application record

Reference
0/47803
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
20 Oct 2020
Validated
22 Oct 2020
Decided
29 Jun 2021
Ward
Pant-Yr-Afon / Penmaenan (pre 05-2022)
Parish
Cyngor Tref Penmaenmawr Town Council
Decision by
Case Officer
Postcode
LL34 6DE

Timeline

Dates from the published record

  1. 20 Oct 2020

    Received by Conwy

  2. 22 Oct 2020

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jun 2021

    Decision issued: Approved With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

36 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Nant Teg Fernbrook Road Penmaenmawr Conwy LL34 6DE

    0/53263 Submitted 8 Oct 2025 52m away

    86% historically approved · decision due ~4 May

    1x Pine tree - Prune to remove dead wood and one limb toward the property as per photo annotations. 1x Ash tree - Prune to remove one long limb and reduce the crown as per photo annotations.

    Awaiting decision Trees
  • Edmondsley Fernbrook Road Penmaenmawr LL34 6DE

    0/53470 Submitted 5 May 2026 56m away

    T1 - Birch x1 - Remove due to Kretzschmaria duesta fungus. T2 - Copper beech - Crown reduce by 2-3m*

    Granted Trees 8 docs
  • Lynwood Fernbrook Road Penmaenmawr LL34 6DE

    0/46792 Submitted 18 Oct 2019 62m away

    Prune 2 no Sycamore and 2 no Ash Trees

    Granted Trees 2 docs
  • Lynwood Fernbrook Road Penmaenmawr LL34 6DE

    0/46782 Submitted 30 Sep 2019 62m away

    Non material amendment to planning consent 0/46260 (Extension to rear and dormer window roof extensions to front and rear) to allow for amendments to windows and removal of chimney

    Granted Amendments Extension Loft or dormer +1 9 docs
  • Lynwood Fernbrook Road Penmaenmawr LL34 6DE

    0/46260 Submitted 30 Apr 2019 62m away

    Extension to rear and dormer window roof extensions to front and rear

    Granted Full applications Extension Loft or dormer +1 13 docs
  • Puffin House Fernbrook Road Penmaenmawr LL34 6DE

    0/48543 Submitted 1 Jun 2021 68m away

    Non-material amendment to planning consent 0/47996 (Change of use of single residential dwelling in to 7no self-contained residential flats (4no One bed flats & 3no Two bed flats)) to amend the wording of condition 6 of planning approval to "The approved Construction Method Statement shall be adhered to throughout the construction period"

    Granted Amendments New dwelling 9 docs
    Domestic

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications