Skip to content
PlanIndex Get alerts
Menu

Planning application

Lynwood Fernbrook Road Penmaenmawr LL34 6DE

Granted Conwy 0/46260 Full

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Extension to rear and dormer window roof extensions to front and rear

As published by the council, reference 0/46260

Application record

Reference
0/46260
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
30 Apr 2019
Validated
15 May 2019
Decided
24 Jun 2019
Ward
Pant-Yr-Afon / Penmaenan (pre 05-2022)
Parish
Cyngor Tref Penmaenmawr Town Council
Decision by
Case Officer
Postcode
LL34 6DE

Timeline

Dates from the published record

  1. 30 Apr 2019

    Received by Conwy

  2. 15 May 2019

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jun 2019

    Decision issued: Approved With Conditions

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Lynwood Fernbrook Road Penmaenmawr LL34 6DE

    0/46792 Submitted 18 Oct 2019 0m away

    Prune 2 no Sycamore and 2 no Ash Trees

    Granted Trees 2 docs
  • Lynwood Fernbrook Road Penmaenmawr LL34 6DE

    0/46782 Submitted 30 Sep 2019 0m away

    Non material amendment to planning consent 0/46260 (Extension to rear and dormer window roof extensions to front and rear) to allow for amendments to windows and removal of chimney

    Granted Amendments Extension Loft or dormer +1 9 docs
  • Edmondsley Fernbrook Road Penmaenmawr LL34 6DE

    0/53470 Submitted 5 May 2026 17m away

    T1 - Birch x1 - Remove due to Kretzschmaria duesta fungus. T2 - Copper beech - Crown reduce by 2-3m*

    Granted Trees 8 docs
  • Bron Haul, Fernbrook Road, Penmaenmawr, LL34 6DE

    0/46774 Submitted 16 Oct 2019 43m away

    Approval of condition no 8 of planning approval 0/46348 (Demolition of existing flat roof extension to north west corner, demolition of small lean-to extension to south elevation, addition of raised terrace with garden storage below to north elevation, replacement of all windows, replacement of main entrance door, painting existing pebbledash to all exterior walls. Erection of new domestic garage and improvements to existing vehicle access)

    Granted Conditions Extension Demolition +1 9 docs
  • Puffin House Fernbrook Road Penmaenmawr LL34 6DE

    0/48543 Submitted 1 Jun 2021 57m away

    Non-material amendment to planning consent 0/47996 (Change of use of single residential dwelling in to 7no self-contained residential flats (4no One bed flats & 3no Two bed flats)) to amend the wording of condition 6 of planning approval to "The approved Construction Method Statement shall be adhered to throughout the construction period"

    Granted Amendments New dwelling 9 docs
    Domestic
  • Land Adj Merton Court Fernbrook Rd Penmaenmawr LL34 6DE

    0/47803 Submitted 20 Oct 2020 62m away

    Residential development for 3No. two-bedroomed terraced houses

    Granted Full applications New dwelling 36 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications