Planning application
215 Bunyan Court Barbican London EC2Y 8DH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Internal alterations comprising: (i) Strip out the refurbishment of the kitchen bathroom and WC
As published by the council, reference 26/01617/LBC
Application record
- Reference
- 26/01617/LBC
- Category
- Heritage and listed buildings
- Status
- Under Consideration
- Received
- 9 Nov 2026
- Validated
- 16 Nov 2026
- Ward
- Aldersgate
- Postcode
- EC2Y 8DH
Timeline
Dates from the published record
-
9 Nov 2026
Received by City of London
-
16 Nov 2026
Validated
Checked as complete and ready for consideration.
-
17 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 86 days over the applications it decided in the last year.
Documents
The council's own list, drawings first
6 documents on file for this application
Drawings (4)
- Proposed layout
- Site plan
- Demolition
- Existing layout
Everything on file (6)
- APPLICATIONFORMREDACTED
- A094-A-00-001
- DEMOLITION
- 094_BUNYAN COURT_DESIGN AND ACCESS STATEMENT
- PROPOSED LAYOUT
- EXISTING LAYOUT
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided heritage and listed building applications in a median of 97 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
318 Bunyan Court Barbican London EC2Y 8DH
Internal alterations to include removal of non structural bedroom nib wall and installation of new wardrobe and storage space
-
520 Bunyan Court Barbican London EC2Y 8DH
Internal refurbishment comprising: (i) replacement of existing internal doors and frames with full-height versions (ii) enlargement of the lower bedroom wardrobe (iii) installation of a suspended ceiling to the bathroom.
Granted Heritage and listed buildings 12 docs -
306 Bunyan Court Barbican London EC2Y 8DH
Replacement of an internal nib wall and new full height door.
-
520 Bunyan Court Barbican London EC2Y 8DH
Creation of a bathroom and mezzanine storage level in the top-floor bedroom with associated works.
-
98 John Trundle Court Barbican London EC2Y 8NE
Refitting the existing kitchen and bathroom. Removal of internal bathroom door and relocation of bathroom entrance door to create space for sink.
Granted Heritage and listed buildings 11 docs -
Blake Tower 2 Fann Street London EC2Y 8AF
98% historically approved · decision due ~26 Nov
Installation of fire-rated glazing and partitions to the first and second floor winter gardens/external staircase.
Other heritage and listed building applications
In City of London
-
24/00160/LBC Granted
88 - 92 Moorgate London EC2M 6SE
Internal and external alterations, including: (i) internal alterations to the ground and basement floors; (ii) installation of signage to the exterior and interior of the retail unit; (iii) installation of ducting within the northern lightwell; and (iv) installation of plant on the roof platform(v) installation of ramp
-
26/01048/LBC Granted
3 Temple Gardens Middle Temple Lane London EC4Y 9AU
Proposed improvement and refurbishment of the existing building, comprising external changes to provide step-free access including an automated entrance and new handrail, introductions of lift overruns and smoke extract fans, replacement of gas-fired boilers with water source heat pumps and new plant machinery including screening and replacement of roof coverings, and repair of sash windows, and internal changes comprising introduction of insulation throughout the building, upgrades to lighting, introduction of mechanical extraction, step-free access improvements inside the building, installation of new lifts, demolition and removal of internal fabric including walls, floors, doors, fireplaces and chimney breasts, introduction of smoke vent shafts and service risers alongside partitioning for evacuation and firefighting lifts, introduction of fire compartmentation alongside upgrades to flooring, new WC and shower facilities in addition to improvements to end of trip facilities, removal or retention or restoration of interior features, changes to interior finishes, basement level plant and new water-proofing, and associated works.
-
26/01145/LBC Granted
48 - 51 Leadenhall Market London EC3V 1LT
Internal refurbishment of the ground floor of the unit, including the construction of new ambulant toilet and 2no. urinal facilities.
-
26/01317/LBC Granted
1 Finsbury Avenue London EC2M 2PA
Installation of 3no. posts to accommodate access control equipment and 1no. CCTV camera on 6th floor east balcony.
-
26/00817/LBC Granted
71 Fenchurch Street London EC3M 4BR
Party wall works between 68 and 71 Fenchurch Street including the removal of flank wall of no. 68 Fenchurch Street, construction of new structure against the flank wall of no.71, and remedial works to newly exposed flank wall and other associated works, to be delivered as part of the redevelopment of 68 Fenchurch Street.