Awaiting decision City of London 26/01272/FULMAJ

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Partial demolition, refurbishment and extension to the existing building to provide additional office floorspace (Use Class E) including new ground floor commercial units, roof level pavilion and terrace (resulting in a development of a ground plus fourteen-storey office building at a height of 70.575m AOD), with associated works.

As published by the council, reference 26/01272/FULMAJ

Application record

Reference
26/01272/FULMAJ
Status
Under Consideration
Received
14 Sep 2026
Validated
14 Sep 2026
Ward
Bassishaw
Decision by
Delegated
Postcode
EC2R 5AA

Comment by 18 October 2026

The council is taking comments on this application until then. Comments go to City of London through their own planning portal.

Timeline

Dates from the published record

  1. 14 Sep 2026

    Received by City of London

  2. 18 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 78 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,250 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Union Investment Real Estate GmbH Acting On Behalf of Unilmm Applicant

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

107 documents on file for this application

  • 9073_003R_3-0_HF Accompanying report · 14 Sep 2026
  • 313898-ARP-TN-LQS-1.0 Accompanying report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 02_THE SITE AND CONTEXT Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 03_THE EXISTING BUILDING Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 06_SPATIAL DESIGN Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 12_APPENDIX Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 07_FACADE DESIGN Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 10_LIGHTING DESIGN Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 08_FACILITIES AND SERVICING Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 11_PUBLIC REALM AND LANDSCAP Report - Design & Access Statement/Report · 14 Sep 2026
  • P3926_1 COLEMAN STREET_DAYLIGHT AND SUNLIGHT REPORT_R6F1_AUG 26 Report - Daylight/Sunlight Report · 14 Sep 2026
  • EXISTING SITE PLAN Site Plan · 14 Sep 2026
  • EXISTING LOCATION PLAN Site Plan · 14 Sep 2026
  • EXISTING PLAN - GROUND LEVEL Drawing · 14 Sep 2026
  • EXISTING PLAN - LEVEL 02 Drawing · 14 Sep 2026
  • EXISTING PLAN - LEVEL 01 Drawing · 14 Sep 2026
  • EXISTING PLAN - LEVEL 03 Drawing · 14 Sep 2026
  • EXISTING PLAN - LEVEL 06 Drawing · 14 Sep 2026
  • EXISTING PLAN - LEVEL 07 Drawing · 14 Sep 2026
  • EXISTING PLAN - LEVEL 04 Drawing · 14 Sep 2026
  • EXISTING PLAN - LEVEL 05 Drawing · 14 Sep 2026
  • EXISTING PLAN - BASEMENT Drawing · 14 Sep 2026
  • EXISTING PLAN - EXISTING ROOF LEVEL Drawing · 14 Sep 2026
  • EXISTING CONTEXTUAL ELEVATIONS - EAST & WEST Drawing · 14 Sep 2026
  • EXISTING SECTION EAST - WEST Drawing · 14 Sep 2026
  • EXISTING SECTION NORTH - SOUTH (WEST CORE) Drawing · 14 Sep 2026
  • EXISTING SECTION NORTH - SOUTH (EAST CORE) Drawing · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 03 Drawing · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 05 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 10 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 11 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 04 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 06 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 05 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 03 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 01 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 02 Drawing · 14 Sep 2026
  • PROPOSED CONTEXTUAL ELEVATIONS - NORTH & SOUTH Drawing · 14 Sep 2026
  • PROPOSED ELEVATION WEST Drawing · 14 Sep 2026
  • PROPOSED ELEVATION SOUTH Drawing · 14 Sep 2026
  • PROPOSED ELEVATION EAST Drawing · 14 Sep 2026
  • PROPOSED CONTEXTUAL ELEVATIONS - EAST & WEST Drawing · 14 Sep 2026
  • 260825 ONECOLEMANSTREET HTVIA MR_PART4OF4 Other · 14 Sep 2026
  • 260825 ONECOLEMANSTREET HTVIA MR_PART2OF4 Other · 14 Sep 2026
  • 62463_OCS_SUSTAINABILITY STATEMENT_P06_COMPRESSED-1-35 Accompanying report · 14 Sep 2026
  • OCS-ARP-ZZ-TR-RP-000403_TRANSPORT ASSESSMENT Report - Transport Statement/Report · 14 Sep 2026
  • EXISTING PLAN - EXISTING PLANT LEVEL Drawing · 14 Sep 2026
  • DEMOLITION PLAN - GROUND LEVEL Drawing · 14 Sep 2026
  • 62463_OCS_SUSTAINABILITY STATEMENT_P06_COMPRESSED-36-46 Accompanying report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 04_DESIGN OVERVIEW Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 05_CONSULTATION Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 09_ACCESS STATEMENT Report - Design & Access Statement/Report · 14 Sep 2026
  • OCS-ARP-ZZ-XX-RP-XX-000534_OUTLINE DCEMP_P04 - REV Other · 14 Sep 2026
  • EXISTING PLAN - LEVEL 08 Drawing · 14 Sep 2026
  • APPLICATIONFORMREDACTED Application Form · 14 Sep 2026
  • 260217-TMA-XX-RP-AP-2700-P03 ARBORICULTURAL IMPACT ASSESSMENT - REV Report - Tree Report · 14 Sep 2026
  • OCS-ARP-ZZ-XX-RP-XX-000510 - ARCHAEOLOGICAL DBA - REV Other · 14 Sep 2026
  • 62463_ONE COLEMAN STREET_CES_P06_COMPRESSED Other · 14 Sep 2026
  • EXISTING CONTEXTUAL ELEVATIONS - NORTH & SOUTH Drawing · 14 Sep 2026
  • EXISTING ELEVATION SOUTH Drawing · 14 Sep 2026
  • EXISTING ELEVATION EAST Drawing · 14 Sep 2026
  • EXISTING ELEVATION WEST Drawing · 14 Sep 2026
  • EXISTING ELEVATION NORTH Drawing · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 02 Drawing · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 01 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 09 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 08 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 07 Drawing · 14 Sep 2026
  • PROPOSED PLAN - GROUND LEVEL Drawing · 14 Sep 2026
  • OCS-ARP-ZZ-TR-RP-000414_FRAMEWORK TRAVEL PLAN Report - Travel Plan · 14 Sep 2026
  • 62463_VENTILATION AND EXTRACTION STATEMENT_P04 Accompanying report · 14 Sep 2026
  • OCS DESIGN AND ACCESS STATEMENT_AUGUST 2026_SECTION 01_CONTENTS AND INTRODUCTION Report - Design & Access Statement/Report · 14 Sep 2026
  • FORM_1_CIL_ADDITIONAL_INFORMATION - OCS - FINAL Other · 14 Sep 2026
  • OCS-ARP-ZZ-TR-RP-000424_OUTLINE CLP Other · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 04 Drawing · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 06 Drawing · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 07 Drawing · 14 Sep 2026
  • DEMOLITION PLAN - LEVEL 08 Drawing · 14 Sep 2026
  • DEMOLITION PLAN - EXISTING PLANT LEVEL Drawing · 14 Sep 2026
  • DEMOLITION PLAN - BASEMENT Drawing · 14 Sep 2026
  • PROPOSED SITE PLAN (GROUND LEVEL) Site Plan · 14 Sep 2026
  • PROPOSED PLAN - ROOF LEVEL Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 14 Drawing · 14 Sep 2026
  • PROPOSED PLAN - BASEMENT Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 12 Drawing · 14 Sep 2026
  • PROPOSED PLAN - LEVEL 13 Drawing · 14 Sep 2026
  • PROPOSED ELEVATION NORTH Drawing · 14 Sep 2026
  • PROPOSED SECTION NORTH - SOUTH (WEST CORE) Drawing · 14 Sep 2026
  • PROPOSED SECTION NORTH - SOUTH (EAST CORE) Drawing · 14 Sep 2026
  • PROPOSED SECTION EAST - WEST ELEVATION & SECTION Drawing · 14 Sep 2026
  • OCS-ARP-ZZ-TR-RP-000434_DSMP_COMPRESSED Other · 14 Sep 2026
  • 62463_OCS_ENERGY STATEMENT_P06 Other · 14 Sep 2026
  • 260826-R01-LO25190_1 COLEMAN_STREET_LONDON_PLAN_FIRE_STATEMENT-PFSS-CIC Other · 14 Sep 2026
  • OCS FRS ISSUE01 - REV Accompanying report · 14 Sep 2026
  • OCS-ARP-ZZ-XX-RP-XX-000543_ HIA Other · 14 Sep 2026
  • 260825 ONECOLEMANSTREET HTVIA MR_PART1OF4 Other · 14 Sep 2026
  • 260825 ONECOLEMANSTREET HTVIA MR_PART3OF4 Other · 14 Sep 2026
  • 8191_001R_3-0_OL Report - Acoustic/Noise Report · 14 Sep 2026
  • 31389800_ARP_PEA_2.0 - REV Other · 14 Sep 2026
  • 31389800_ARP_BNG DESIGN STAGE REPORT_VER1.2 Other · 14 Sep 2026
  • OCS PLANNING STATEMENT (FINAL) Report - Planning Statement/Report · 14 Sep 2026
  • PLANNING OBLIGATIONS_INCLUDED_IN_PLANNING STATEMENT Other · 14 Sep 2026
  • 1 CS SCI Other · 14 Sep 2026
  • ONE COLEMAN STREET_DRAINAGE STRATEGY_ISSUE 01 Other · 14 Sep 2026
  • OCS-CBD-ZZ-ZZ-RE-CS-000001_UTILITIES REPORT Accompanying report · 14 Sep 2026
  • 2026-08-28 OCS WIND MICROCLIMATE ASSESSMENT REV04 FINAL - REV Other · 14 Sep 2026
  • 62463_ONE COLEMAN STREET_WLCA_P06 Other · 14 Sep 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 78 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 55 Moorgate London EC2R 6BH

    21/00544/FULL Submitted 24 Jun 2021 49m away

    Change of use of part ground floor and lower ground floor levels from Class E to a drinking establishment with an ancillary restaurant area (sui generis) use (965sq.m).

    Granted Full applications 16 docs
  • 55 Moorgate London EC2R 6BH

    21/00839/MDC Submitted 30 Sep 2021 49m away

    Details of the integration of window cleaning equipment and the garaging thereof, plant, flues, fire escapes and other excrescences at roof level pursuant to condition 18(j) of planning permission 18/01345/FULL dated 26 February 2019.

    Withdrawn Conditions Windows or glazing 4 docs
  • Ibex House 42 - 47 Minories London EC3N 1DY

    26/00535/LDC Submitted 15 Apr 2026 49m away

    Submission of details of photographic survey pursuant to condition 7 of Listed Building consent 25/01507/LBC dated 29.01.2026.

    Granted Lawful development 5 docs
  • Moor House 120 London Wall London EC2Y 5ET

    23/01076/CLOPD Submitted 28 Sep 2023 53m away

    Certificate of Lawful Development (Proposed) for the replacement of air-conditioning plant with air source heat pump plant within an existing enclosure.

    Granted Lawful development 19 docs
  • Moor House 120 London Wall London EC2Y 5ET

    26/00509/CLOPD Submitted 10 Apr 2026 53m away

    Certificate of Lawful Development (Proposed) for the replacement of air-conditioning plant with replacement heat rejection plant within an existing enclosure.

    Granted Lawful development 16 docs
  • 51 - 53 Coleman Street London EC2R 5JJ

    25/01817/LBC Submitted 24 Dec 2025 64m away

    Internal alterations including the installation of partly fixed partitions associated with use as a golf simulator studio; Fixing of external advertisement signage including a projecting sign and wall mounted sign.

    Granted Heritage and listed buildings 15 docs