Planning application
2 Moorgate London EC2R 6AG
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.
As published by the council, reference 26/01202/FULL
Application record
- Reference
- 26/01202/FULL
- Category
- Full applications
- Status
- Under Consideration
- Received
- 21 Aug 2026
- Validated
- 21 Aug 2026
- Ward
- Coleman Street
- Decision by
- Delegated
- Postcode
- EC2R 6AG
Timeline
Dates from the published record
-
21 Aug 2026
Received by City of London
-
1 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 78 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
895 applications on PlanIndex · across 36 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
69 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2 Moorgate London EC2R 6AG
100% historically approved · decision due ~16 Oct
Alterations to a listed building including: extension at roof level and introduction of a roof terrace, upgrades to facade including entrance doorset and glazing, internal and MEP upgrades, with associated works.
Awaiting decision Heritage and listed buildings Extension Windows or glazing 59 docs -
Princes Court 7 Prince's Street London EC2R 8AQ
Submission of BREEAM New Construction Final Certificate pursuant to discharge Condition 7 of planning permission 22/00158/FULMAJ dated 18.01.2023.
Granted Conditions 5 docs -
Princes Court 7 Prince's Street London EC2R 8AQ
Submission of details to partially discharge a Scheme of Protection (Construction) pursuant to Condition 14 (in part) of planning permission dated 18.01.2023 (ref: 22/00158/FULMAJ).
Granted Conditions 5 docs -
Princes Court 7 Prince's Street London EC2R 8AQ
Submission of details to partially discharge a Scheme of Protection (Demolition) pursuant to Condition 14 (in part) of planning permission dated 18.01.2023 (ref: 22/00158/FULMAJ)
Granted Conditions Demolition 5 docs -
Princes Court 7 Prince's Street London EC2R 8AQ
Submission of the Local Procurement Strategy and the Local Training Skills and Job Brokerage Strategy (Demolition & Construction pursuant to Schedule 3 Paragraphs 2.1, 3.2 and 3.5 of the S106 Agreement dated 17 January 2023 (Planning Application Reference: 22/00158/FULMAJ).
Granted Demolition 5 docs -
Princes 7 Prince's Street London EC2R 8AQ
Installation and display of one non-illuminated, double sided projecting sign measuring 500mm (height) x 700mm (width), displayed at a height of 3430mm above ground level.
Granted Advertising 29 docs
Other full applications applications
In City of London
-
26/00384/FULL Granted
Adelaide House London Bridge London EC4R 9HA
External repair works (part retrospective) to facade, including (i) repairs to brickwork including repointing of mortar where necessary, (ii) replacement of Portland Stone where damaged, and (iii) mortar repair works to lintels and cills throughout each facade.
-
26/01190/FULL Awaiting decision
Part Ground Floor, Part Basement And Part Sub-Basement 10 Fetter Lane London EC4A 1BR
Change of use of part of the ground floor, part basement and part sub-basement to a Sui Generis comedy club with ancillary bar use.
-
26/00649/FULL Granted
15 Bishopsgate London EC2N 3AR
Installation of a) 2 x security cameras to north elevation; b) 6 x security cameras, anti-climb spikes, anti-climb barriers and security spikes above 4th floor level on east elevation; c) 2 x security cameras, anti-climb spikes, anti-climb barriers and security spikes at 4th floor level on south elevation; d) 3 x security cameras, anti-climb barriers and security spikes at 4th floor level on west elevation;
-
26/00153/FULL Granted
140 Fenchurch Street London EC3M 6BL
Alterations to the shopfront and shopfront entrance.
-
26/01154/FULL Awaiting decision
33 Holborn London EC1N 2HT
Application under Section 73 of the Town & Country Planning Act 1990 (as amended) to vary Condition 16 (Approved Drawings) of Planning Permission 24/00391/FULL dated 10.12.2024 in order to allow the reconfiguration of the approved roof plan, including reduced size and location of the pavilion and roof terrace along with the introduction of lift extension to roof level, increased size and rearrangement of rooftop plant room and other associated changes.