Planning application
Police Call Point Guildhall Yard London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Works comprising: (i) removal of existing rooftop plant enclosure, (ii) installation of new rooftop plant and associated screening, (iii) installation of screened plant on the fourth floor terrace, and (iv) refurbishment of the ground floor entrance.
As published by the council, reference 26/01116/FULL
Application record
- Reference
- 26/01116/FULL
- Category
- Full applications
- Status
- Under Consideration
- Received
- 6 Aug 2026
- Validated
- 6 Aug 2026
- Ward
- Cheap
- Decision by
- Delegated
Timeline
Dates from the published record
-
6 Aug 2026
Received by City of London
-
11 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 85 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
638 applications on PlanIndex · across 117 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
- HERITAGE IMPACT ASSESSMENT
- 21179102-WAT-XX-XX-R-10001-P02 ACOUSTIC PLANNING REPORT
- GYE-CPW-XX-XX-RP-Z-320003 - REV C - SUSTAINABILITY STATEMENT
- GYE-BBA-ZZ-ZZ-D-A-1001 LOCATION PLAN_P01
- GYE-BBA-ZZ-ZZ-D-A-3200 GA PROPOSED ELEVATIONS_P03
- GYE-BBA-ZZ-ZZ-D-A-3301 PROPOSED ENTRANCE DETAIL ELEVATIONS_P01
- GYE-BBA-ZZ-ZZ-D-A-3302 PROPOSED ROOF DETAIL ELEVATION SECTION_P01
- GYE-BBA-ZZ-ZZ-D-A-3000 GA EXISTING ELEVATIONS_P02
- GYE-BBA-ZZ-ZZ-D-A-3100 GA DEMOLITION ELEVATIONS_P02
- GYE-BBA-ZZ-00-D-A-2301 GROUND FLOOR DEMOLITION PLAN_P02
- GYE-BBA-ZZ-RF-D-A-2051 PROPOSED ROOF GA PLAN REDACTED_P02
- GYE-BBA-ZZ-RF-D-A-2201 EXISTING ROOF PLAN_P03
- GYE-BBA-ZZ-RF-D-A-2301 ROOF DEMOLITION PLAN_P02
- GYE-BBA-ZZ-00-D-A-1005 EXISTING SITE PLAN_P01
- GYE-BBA-ZZ-00-D-A-2051 PROPOSED GROUND FLOOR GA PLAN REDACTED_P02
- GYE-BBA-ZZ-00-D-A-2201 EXISTING GROUND FLOOR PLAN_P02
- 24040-BBA-XX-XX-RP-A-0010-GYE - DESIGN AND ACCESS STATEMENT-S3-P02
- APPLICATIONFORMREDACTED
- AIR QUALITY NEUTRAL ASSESSMENT
- AIR QUALITY IMPACT ASSESSMENT
- GYE-BBA-ZZ-00-D-A-1007 PROPOSED SITE PLAN_P01
- PLANNING STATEMENT
- COVER LETTER
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 132 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.