Skip to content
PlanIndex Get alerts
Menu

Planning application

Police Call Point Guildhall Yard London

Awaiting decision City of London 26/01116/FULL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Works comprising: (i) removal of existing rooftop plant enclosure, (ii) installation of new rooftop plant and associated screening, (iii) installation of screened plant on the fourth floor terrace, and (iv) refurbishment of the ground floor entrance.

As published by the council, reference 26/01116/FULL

Application record

Reference
26/01116/FULL
Category
Full applications
Status
Under Consideration
Received
6 Aug 2026
Validated
6 Aug 2026
Ward
Cheap
Decision by
Delegated

Timeline

Dates from the published record

  1. 6 Aug 2026

    Received by City of London

  2. 11 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

  • HERITAGE IMPACT ASSESSMENT Accompanying report · 04 Aug 2026
  • 21179102-WAT-XX-XX-R-10001-P02 ACOUSTIC PLANNING REPORT Report - Acoustic/Noise Report · 04 Aug 2026
  • GYE-CPW-XX-XX-RP-Z-320003 - REV C - SUSTAINABILITY STATEMENT Other · 04 Aug 2026
  • GYE-BBA-ZZ-ZZ-D-A-1001 LOCATION PLAN_P01 Site Plan · 04 Aug 2026
  • GYE-BBA-ZZ-ZZ-D-A-3200 GA PROPOSED ELEVATIONS_P03 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-ZZ-D-A-3301 PROPOSED ENTRANCE DETAIL ELEVATIONS_P01 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-ZZ-D-A-3302 PROPOSED ROOF DETAIL ELEVATION SECTION_P01 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-ZZ-D-A-3000 GA EXISTING ELEVATIONS_P02 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-ZZ-D-A-3100 GA DEMOLITION ELEVATIONS_P02 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-00-D-A-2301 GROUND FLOOR DEMOLITION PLAN_P02 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-RF-D-A-2051 PROPOSED ROOF GA PLAN REDACTED_P02 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-RF-D-A-2201 EXISTING ROOF PLAN_P03 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-RF-D-A-2301 ROOF DEMOLITION PLAN_P02 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-00-D-A-1005 EXISTING SITE PLAN_P01 Site Plan · 04 Aug 2026
  • GYE-BBA-ZZ-00-D-A-2051 PROPOSED GROUND FLOOR GA PLAN REDACTED_P02 Drawing · 04 Aug 2026
  • GYE-BBA-ZZ-00-D-A-2201 EXISTING GROUND FLOOR PLAN_P02 Drawing · 04 Aug 2026
  • 24040-BBA-XX-XX-RP-A-0010-GYE - DESIGN AND ACCESS STATEMENT-S3-P02 Report - Design & Access Statement/Report · 04 Aug 2026
  • APPLICATIONFORMREDACTED Application Form · 04 Aug 2026
  • AIR QUALITY NEUTRAL ASSESSMENT Accompanying report · 04 Aug 2026
  • AIR QUALITY IMPACT ASSESSMENT Accompanying report · 04 Aug 2026
  • GYE-BBA-ZZ-00-D-A-1007 PROPOSED SITE PLAN_P01 Drawing · 04 Aug 2026
  • PLANNING STATEMENT Report - Planning Statement/Report · 04 Aug 2026
  • COVER LETTER Cover Letter · 04 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications