Skip to content
PlanIndex Get alerts
Menu

Planning application

319-325 High Holborn (Heron House), 326-332 High Holborn And 26 Southampton Buildings (Holborn Gate), And 44 Southampton Buildings, WC1 And WC2

Awaiting decision City of London 26/01108/FULMAJ

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission 24/01262/FULL dated 23 December 2025, to vary condition 6 (access to terraces) to reflect amended configuration of terraces and balconies, condition 20 (basement plans) to reflect amended basement layouts, condition 31 (biodiversity gain plan), to reflect amended landscaping and planting, condition 57 (cycle parking), to amend long stay and short stay cycle parking provision, condition 67 (fire strategy) to reflect amended fire strategy, condition 73 (floor areas) to reflect amended floor areas and layout reconfiguration, condition 74 (approved plans), to include an extension of the proposed building to the south with the introduction of inset balconies, extension of basement level B2, reconfiguration of the proposed plant and the formation of a ground floor colonnade with new pedestrian route, and condition 76 (height of the building) to increase the height of the proposed building and accompanying deed of variation to the section 106 agreement to vary planning obligations.

As published by the council, reference 26/01108/FULMAJ

Application record

Reference
26/01108/FULMAJ
Status
Under Consideration
Received
3 Aug 2026
Validated
3 Aug 2026
Ward
Farringdon Without
Decision by
Delegated

Comment by 11 September 2026

The council is taking comments on this application until then. Comments go to City of London through their own planning portal.

Timeline

Dates from the published record

  1. 3 Aug 2026

    Received by City of London

  2. 14 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 85 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file

922 applications on PlanIndex · across 36 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Applicant on file

2 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

145 documents on file for this application

  • COMMENTS - THE GARDENS TRUST Consultee Comment · 26 Aug 2026
  • COMMENT - GREATER LONDON ARCHAEOLOGICAL ADVISORY SERVICE Consultee Comment · 25 Aug 2026
  • COMMENTS - WESTMINSTER CITY COUNCIL Consultee Comment · 24 Aug 2026
  • COMMENTS - ACTIVE TRAVEL ENGLAND Consultee Comment · 18 Aug 2026
  • COMMENTS - HEATHROW AIRPORT LTD. Consultee Comment · 14 Aug 2026
  • COMMENTS - NATS SAFEGUARDING Consultee Comment · 14 Aug 2026
  • COMMENTS - ENVIRONMENT AGENCY Consultee Comment · 14 Aug 2026
  • REPRESENTATION - FLAT 303, 7 HIGH HOLBORN Public Comment · 12 Aug 2026
  • WLC_GLA SPREADSHEET Other · 04 Aug 2026
  • APPLICATIONFORMREDACTED Application Form · 03 Aug 2026
  • ATTACHMENTSUMMARY Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 6 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 8 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 26 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 27 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 28 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 29 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 30 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 2 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 13 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 14 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 15 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 16 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 17 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 18 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 9 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 3 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 4 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 22 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 23 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 24 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 25 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • BAY 5C -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 6A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 5D -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 4C -TYPICAL SET-BACK BAY Drawing · 03 Aug 2026
  • RAILINGS -PROPOSED SITE PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 4 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 5 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 6 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 7 FLOOR PLAN Drawing · 03 Aug 2026
  • 294009-ARP-RP-YT-10004 - TA ADDENDUM - P04 Report - Transport Statement/Report · 03 Aug 2026
  • 294009-ARP-RP-YT-10005 - DSMP ADDENDUM - P02 Other · 03 Aug 2026
  • HIGH HOLBORN_TBHVIA S73 ADDENDUM_PART 1 OF 2 Other · 03 Aug 2026
  • HIGH HOLBORN_TBHVIA S73 ADDENDUM_PART 2 OF 2 Other · 03 Aug 2026
  • 1547 - LETTER OF CONFORMITY CITY OF LONDON WITH COVER Report - Tree Report · 03 Aug 2026
  • 554478ES20JUL26_FV03_UGF Other · 03 Aug 2026
  • 294009-ARP-RP-YS-10005_P00 WHOLE LIFE CARBON ASSESSMENT - SECTION 73 UPDATE (21J Other · 03 Aug 2026
  • URBAN GREENING FACTOR Drawing · 03 Aug 2026
  • LEVEL 06 GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • LEVEL 06 PLANTING PLAN Drawing · 03 Aug 2026
  • LEVEL 07 GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • LEVEL 07 PLANTING PLAN Drawing · 03 Aug 2026
  • LEVEL 08 GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • LEVEL 08 PLANTING PLAN Drawing · 03 Aug 2026
  • LEVEL 09 GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • LEVEL 09 PLANTING PLAN Drawing · 03 Aug 2026
  • LEVEL 10 GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • LEVEL 10 PLANTING PLAN Drawing · 03 Aug 2026
  • GROUND FLOOR GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • GROUND FLOOR LANDSCAPE SECTION Drawing · 03 Aug 2026
  • GROUND FLOOR PLANTING PLAN Drawing · 03 Aug 2026
  • LEVEL 01-05 GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • ROOF TERRACES LANDSCAPE SECTIONS Drawing · 03 Aug 2026
  • P21906-00-001-GIL-0000 Drawings Schedule · 03 Aug 2026
  • ILLUSTRATIVE GENERAL ARRANGEMENT PLAN Drawing · 03 Aug 2026
  • 024829-R05-C PLANNING NOISE REPORT ADDENDUM Report - Acoustic/Noise Report · 03 Aug 2026
  • 260730 - HIGH HOLBORN - SECTION 73 APPLICANT COVERING LETTER Cover Letter · 03 Aug 2026
  • 260730 - HIGH HOLBORN PLANNING STATEMENT Report - Planning Statement/Report · 03 Aug 2026
  • HOL-MAK-XX-ZZ-DR-AR-080000 Site Plan · 03 Aug 2026
  • HOL-MAK-XX-ZZ-DR-AR-080001 Site Plan · 03 Aug 2026
  • HIGH HOLBORN DEVELOPMENT - ADDENDUM TO ORIGINAL STATEMENT OF COMMUNITY INVOLVEME Other · 03 Aug 2026
  • 322 HIGH HOLBORN_REV02_ADDENDUM_CEMP WITH COVER Other · 03 Aug 2026
  • 322 HIGH HOLBORN_REV02_ADDENDUM_CEMP_APP.1 WITH COVER Other · 03 Aug 2026
  • 294009-ARP-RP-YS-10007 CIRCULAR ECONOMY STATEMENT _SECTION 73 Other · 03 Aug 2026
  • 22.07.26_HIGH_HOLBORN_DEVELOPMENT_CIRCULAR_ECONOMY_GLA_SPREADSHEET_SECTION 73 Other · 03 Aug 2026
  • 294009-ARP-RP-YE-10004 AIR QUALITY CONFORMITY STATEMENT_P03 Accompanying report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 19 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 20 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 1 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 10 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 12 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 11 OF 30_COMPRESSED Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 21 OF 30_COMPRESSED Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 7 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT ADDENDUM PART 5 OF 30 Report - Design & Access Statement/Report · 03 Aug 2026
  • 2026-07-17_SG_SOC_IS05_19430_REV2_COMPRESSED Other · 03 Aug 2026
  • 19430-20260716-GM(DSO SUMMARY NOTE APPENDICES) Other · 03 Aug 2026
  • 260730 - CIL FORM 1 - HIGH HOLBORN Other · 03 Aug 2026
  • PROPOSED SECTION C-C Drawing · 03 Aug 2026
  • PROPOSED SECTION D-D Drawing · 03 Aug 2026
  • PROPOSED NORTH ELEVATION Drawing · 03 Aug 2026
  • PROPOSED EAST ELEVATION Drawing · 03 Aug 2026
  • PROPOSED SOUTH ELEVATION Drawing · 03 Aug 2026
  • PROPOSED WEST ELEVATION Drawing · 03 Aug 2026
  • BAY 1A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 1B -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 2A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 2B -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 3A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 3B -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 4A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 4B-TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 5A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 5B -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 6B -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 7A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 7B -TYPICAL SET-BACK BAY Drawing · 03 Aug 2026
  • BAY 8A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 8B -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 9A -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • BAY 9B -TYPICAL FACADE BAY Drawing · 03 Aug 2026
  • RAILINGS FIXED TO STAPLE INN BUILDINGS NORTH AND SOUTH_DEMOLITION Drawing · 03 Aug 2026
  • RAILINGS FIXED TO STAPLE INN BUILDINGS NORTH AND SOUTH_PROPOSED Drawing · 03 Aug 2026
  • HOL-MAK-XX-ZZ-SH-AR-070100 Drawings Schedule · 03 Aug 2026
  • PROPOSED GROUND FLOOR Drawing · 03 Aug 2026
  • PROPOSED GROUND FLOOR PLAN MEZZANINE Drawing · 03 Aug 2026
  • PROPOSED LEVEL 1 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 2 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 3 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 8 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 9 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL 10 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED BASEMENT LEVEL 1 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED BASEMENT LEVEL 2 FLOOR PLAN Drawing · 03 Aug 2026
  • PROPOSED LEVEL ROOF PLAN Drawing · 03 Aug 2026
  • PROPOSED SITE PLAN Site Plan · 03 Aug 2026
  • PROPOSED SECTION A-A Drawing · 03 Aug 2026
  • PROPOSED SECTION B-B Drawing · 03 Aug 2026
  • HIGH_HOLBORN_DEVELOPMENT_WLC_GLA SPREADSHEET (SECTION 73 UPDATE JUL 2026) Other · 03 Aug 2026
  • 19430_HIGH HOLBORN_WIND MICROCLIMATE AND OUTDOOR THERMAL COMFORT ADDENDUM_260722 Other · 03 Aug 2026
  • 94009-ARP-RP-M-10001 HH ENERGY STATEMENT - STAGE 3 WITH COVER Other · 03 Aug 2026
  • APPENDIX A1 - OVERHEATING ASSESSMENT (UPDATE) Other · 03 Aug 2026
  • APPENDIX A2 - SCOP AND SEER CALCULATION - STAGE 3 Other · 03 Aug 2026
  • APPENDIX A3 - BE SEEN REPORTING SPREADSHEET Other · 03 Aug 2026
  • APPENDIX A4 - ENERGY ASSESSMENT OUTPUTS (BE GREEN BRUKL) Other · 03 Aug 2026
  • APPENDIX A4 - ENERGY ASSESSMENT OUTPUTS (BE LEAN BRUKL) Other · 03 Aug 2026
  • APPENDIX A5 - COMMUNICATIONS WITH LOCAL HEAT NETWORKS Other · 03 Aug 2026
  • 294009-ARP-RP-YE-10005 - EQIA - STATEMENT OF CONFORMITY_REVP02 Other · 03 Aug 2026
  • 294009-ARP-RP-YF-10001_FIRE STATEMENT MMA UPDATE-S2 P05 Other · 03 Aug 2026
  • 294009-ARP-RP-C-10002_FLOOD RISK ASSESSMENT AND SUDS STRATEGY_ADDENDUM Accompanying report · 03 Aug 2026
  • 294009-ARP-RP-YE-10006 - HIA - STATEMENT OF CONFORMITY REV P02 Other · 03 Aug 2026
  • HIHOL.02 HIGH HOLBORN ADDENDUM HERITAGE STATEMENT Accompanying report · 03 Aug 2026
  • 52693 L01 (00) WITH COVER Other · 03 Aug 2026
  • SUSTAINABLE DEVELOPMENT AND CLIMATE CHANGE REPORT ADDENDUM Accompanying report · 03 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 85 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.