Skip to content
PlanIndex Get alerts
Menu

Planning application

St Pauls Cathedral, 4 St Pauls Churchyard, Juxon House And Chapter House St Pauls Churchyard, 1 Paternoster Square, Paternoster House 65 St Pauls Churchyard, St Pauls Cathedral School, 2 New Change, 1 Carter Lane, Pvmnt O/s Carter Lane Gdns

Awaiting decision City of London 26/00967/FULL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

External lighting scheme to replace and upgrade the lighting on and to St Paul's Cathedral including on buildings adjacent to St Paul's Cathedral (4 St Paul's Churchyard, Juxon House, Chapter House, 1 Paternoster Square, Paternoster House, St Paul's Cathedral School and One Carter Lane), installed on columns and low level lighting safety lighting to replace floodlights to St Paul's Cathedral Churchyard.

As published by the council, reference 26/00967/FULL

Application record

Reference
26/00967/FULL
Category
Full applications
Status
Under Consideration
Received
8 Jul 2026
Validated
2 Oct 2026
Ward
Castle Baynard
Decision by
Delegated

Comment by 5 November 2026

The council is taking comments on this application until then. Comments go to City of London through their own planning portal.

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2026.

  • 26/00968/LBC Awaiting decision

    St Pauls Cathedral, 4 St Pauls Churchyard, Juxon House And Chapter House St Pauls Churchyard, 1 Paternoster Square, Paternoster House 65 St Pauls Churchyard, St Pauls Cathedral School, 2 New Change, 1 Carter Lane, Pvmnt O/s Carter Lane Gdns

    An external lighting scheme by City of London Corporation in partnership with St Paul's Cathedral to replace and upgrade the lighting on and to St Paul's Cathedral. The application requires lighting to be installed to buildings adjacent to St Paul's Cathedral, and to columns owned by the City of London Corporation. The installations will be to St Paul's Cathedral (exempt from Planning Permission) 1-4 St Paul's Churchyard, Juxon House, Chapter House, 1 Paternoster Square, Paternoster House, St Paul's Cathedral School and One Carter Lane. Floodlights will be removed from St Paul's Cathedral Churchyard and replaced with low level safety lighting.

    Submitted 8 Jul 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 8 Jul 2026

    Received by City of London

  2. 2 Oct 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Oct 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 26/00968/LBC (Under Consideration)

Documents

Plans, drawings, consultee responses and the officer's report

99 documents on file for this application

  • APPLICATION FORM REDACTED Other · 02 Oct 2026
  • DRAWING ISSUE SHEET Drawings Schedule · 17 Sep 2026
  • SITE LOCATION PLAN Site Plan · 17 Sep 2026
  • SITE LOCATION PLAN Site Plan · 17 Sep 2026
  • PLANNING STATEMENT Report - Planning Statement/Report · 10 Aug 2026
  • DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 10 Aug 2026
  • ECOLOGICAL ASSESSMENT OF LIGHTING IMPACT Accompanying report · 20 Jul 2026
  • NOCTURNAL BAT SURVEY REPORT Accompanying report · 20 Jul 2026
  • LIGHTING DESIGN REPORT Accompanying report · 20 Jul 2026
  • LIGHTING DESIGN SUMMARY / ADDENDUM Accompanying report · 20 Jul 2026
  • ARBORICULTURE ASSESSMENT Accompanying report · 20 Jul 2026
  • LIGHTING DESIGN REPORT - APPENDIX Accompanying report · 20 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT CHAPTER HOUSE Drawing · 08 Jul 2026
  • LIGHTING CONTROL SYSTEM SCHEMATIC (PRELIMINARY) Drawing · 08 Jul 2026
  • LIGHTING TO SOUTH FACADE EXISTING LIGHTING COLUMN TO ST. PAUL'S CHURCHYARD REF. Drawing · 08 Jul 2026
  • LIGHTING TO SOUTH FACADE NEW LIGHTING COLUMN TO ST. PAUL'S CHURCHYARD REF. XA/XB Drawing · 08 Jul 2026
  • LIGHTING TO DOME, LANTERN AND CROSS 1 PATERNOSTER SQUARE REFS. XK, XN AND XP Drawing · 08 Jul 2026
  • LIGHTING TO DOME, LANTERN AND CROSS 1 PATERNOSTER SQUARE REFS. XK, XN AND XP Drawing · 08 Jul 2026
  • LIGHTING TO DOME, LANTERN AND CROSS CATHEDRAL ROOF WEST END REFS. XK, XN AND XP Drawing · 08 Jul 2026
  • LIGHTING TO DOME, LANTERN AND CROSS CATHEDRAL ROOF EAST END REFS. XK, XN AND XP Drawing · 08 Jul 2026
  • LIGHTING TO OUTER PERISTYLE AND TAMBOUR CATHEDRAL ROOF REF. XH Drawing · 08 Jul 2026
  • LIGHTING TO BELL AND CLOCK TOWER (EAST ELEVATION) CATHEDRAL ROOF REF. XC Drawing · 08 Jul 2026
  • LIGHTING TO BELL AND CLOCK TOWER (NORTH & SOUTH ELEVATIONS) CATHEDRAL ROOF REF. Drawing · 08 Jul 2026
  • LIGHTING TO INNER PERISTYLE REF. XG Drawing · 08 Jul 2026
  • LIGHTING TO STONE GALLERY REF. XJ Drawing · 08 Jul 2026
  • LIGHTING TO GOLDEN GALLERY REF. XL Drawing · 08 Jul 2026
  • LIGHTING TO UPPER WEST PORTICO REF. XQ Drawing · 08 Jul 2026
  • OTHER RELEVANT INFORMATION_INCLUDED_IN_CONDITION ASSESSMENT SHEETS Other · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-10 STONE GALLERY ROOF LEVEL Drawing · 08 Jul 2026
  • ELECTRICAL RIBA STAGE 3 REPORT Accompanying report · 08 Jul 2026
  • ELECTRICAL RIBA STAGE 3 REPORT Accompanying report · 08 Jul 2026
  • LIGHTING CONTROL SYSTEM SCHEMATIC (PRELIMINARY) Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-19 GOLDEN GALLERY LEVEL Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-20 LANTERN AND CUPOLA LEVEL Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT JUXON HOUSE Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT PATERNOSTER HOUSE Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT 1 PATERNOSTER SQUARE Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT ST AUGUSTINE'S TOWER Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT ST. PAUL'S CHOIR SCHOOL Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT 1-4 ST. PAUL'S CHURCHYARD Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-02 TRIFORIUM LEVEL 1 OF 2 Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-02 TRIFORIUM LEVEL 2 OF 2 Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-05 UPPER ROOF LEVEL 1 OF 3 Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-05 UPPER ROOF LEVEL 2 OF 3 Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-05 UPPER ROOF LEVEL 3 OF 3 Drawing · 08 Jul 2026
  • APPENDIX B - ANNOTATED DRAWING 12113-LA-002 Drawing · 08 Jul 2026
  • LOCATIONPLAN Site Plan · 08 Jul 2026
  • LIGHTING TO NORTH FACADE NEW LIGHTING COLUMN TO ST. PAUL'S CATHEDRAL CHURCHYARD Drawing · 08 Jul 2026
  • LIGHTING TO NORTH PORTICO 1 PATERNOSTER SQUARE REF. XA Drawing · 08 Jul 2026
  • LIGHTING TO NORTH FACADE CHAPTER HOUSE REF. XA Drawing · 08 Jul 2026
  • LIGHTING TO NORTH FACADE BELL TOWER JUXON HOUSE REF. XB1 Drawing · 08 Jul 2026
  • LIGHTING TO EAST FACADE FROM ST. PAUL'S CHOIR SCHOOL ROOF REF. XA Drawing · 08 Jul 2026
  • LIGHTING TO WEST FACADE 1-4 ST. PAUL'S CHURCHYARD REFS. XA, XB, XB1 Drawing · 08 Jul 2026
  • LIGHTING TO WEST FACADE JUXON HOUSE REFS. XA, XB & XB1 Drawing · 08 Jul 2026
  • LIGHTING TO BELL TOWER LANTERN REF. XD Drawing · 08 Jul 2026
  • LIGHTING TO CLOCK TOWER CLOCK TOWER REF. XF1 Drawing · 08 Jul 2026
  • LIGHTING TO CLOCK TOWER LANTERN REF. XD1 Drawing · 08 Jul 2026
  • LIGHTING TO EAST END WINDOW REVEALS REF. XR Drawing · 08 Jul 2026
  • LIGHTING TO LANTERN REF. XM Drawing · 08 Jul 2026
  • LIGHTING TO NORTH PORTICO PATERNOSTER HOUSE REF. XA Drawing · 08 Jul 2026
  • LIGHTING TO DOME FROM BELL & CLOCK TOWERS REF. XK Drawing · 08 Jul 2026
  • LIGHTING TO EGRESS PATHS ST. PAUL'S CATHEDRDAL CHURCHYARD GARDENS REF. XZ Drawing · 08 Jul 2026
  • LIGHTING TO NORTH PORTICO ENTRANCES, CHURCHYARD GARDENS REF. YB Drawing · 08 Jul 2026
  • APPENDIX A SCHEDULE OF ELEC INFRASTRUCTURE STRATEGY Other · 08 Jul 2026
  • BUILDERS WORK Other · 08 Jul 2026
  • LIGHTING TO DOME, LANTERN AND CROSS 1 CARTER LANE REFS. XK, XN AND XP Drawing · 08 Jul 2026
  • LIGHTING TO LOWER WEST PORTICO REFS. XQ1 AND YA Drawing · 08 Jul 2026
  • LIGHTING TO BELL TOWER BELL CHAMBER REF. XD Drawing · 08 Jul 2026
  • LIGHTING TO NORTH AND SOUTH PORTICOES REFURBISHED LANTERNS REF. XS Drawing · 08 Jul 2026
  • HANDRAIL LIGHTING TO SOUTH PORTICO STEPS REF. XW1 Drawing · 08 Jul 2026
  • 12113-DR-002-16 20260409 Drawings Schedule · 08 Jul 2026
  • LIGHTING CONTROL SYSTEM SPECIFICATION AND CONTROL INTENT Other · 08 Jul 2026
  • LOGICAL CONTROL CHANNEL SCHEDULE Other · 08 Jul 2026
  • LIGHTING EQUIPMENT SPECIFICATION EXTERIOR LIGHTING Other · 08 Jul 2026
  • HIGH AND LOW LEVEL LIGHTING ARRANGEMENT PRECINCT, ROOF, PERISTYLE, DOME AND LANT Drawing · 08 Jul 2026
  • BLOCK PLAN OF THE SITE_INCLUDED_IN_ADDITIONAL PLANS Drawing · 08 Jul 2026
  • SOUTH ELEVATION LIGHTING ARRANGEMENT Drawing · 08 Jul 2026
  • WEST ELEVATION LIGHTING ARRANGEMENT Drawing · 08 Jul 2026
  • LIGHTING TO ST. AUGUSTINE'S TOWER LIGHTING ARRANGEMENTS Drawing · 08 Jul 2026
  • J100 NORTH CHURCHYARD WSI V1.0 Other · 08 Jul 2026
  • LIGHTING ASSESSMENT_INCLUDED_IN_CONDITION ASSESSMENT SHEETS Accompanying report · 08 Jul 2026
  • 260325_SPC EXT LIGHT HIA_A01_REDUCED FILE SIZE Accompanying report · 08 Jul 2026
  • 15172 ST. PAULS CATHEDRAL LIGHTING EMBEDDED CARBON ASSESSMENT REPORT_FEB 2026 Accompanying report · 08 Jul 2026
  • ARBORICULTURE-IMPACT ASSESSMENT Report - Tree Report · 08 Jul 2026
  • CATHEDRAL MEASURE BOUNDARY PLANS 2012 Site Plan · 08 Jul 2026
  • J100 NORTH CHURCHYARD ADBA COMPRESSED V1.0 Accompanying report · 08 Jul 2026
  • J100 NORTH CHURCHYARD AIA V1.0 COMPRESSED Other · 08 Jul 2026
  • 12113-RP-004-02_LIGHTING DESIGN REPORT Accompanying report · 08 Jul 2026
  • 12113-RP-004A-00_LIGHTING DESIGN REPORT_APPENDIX Accompanying report · 08 Jul 2026
  • 12113-RP-007-01_LIGHTING SUMMARY Other · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-0CF CHURCH FLOOR LEVEL 1 OF 2 Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT SP-0CF CHURCH FLOOR LEVEL 2 OF 2 Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT CARTER LANE GARDENS Drawing · 08 Jul 2026
  • PROPOSED ELECTRICAL SERVICES LAYOUT 1 CARTER LANE Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-08 COLONNADE PERISTYLE LEVEL Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT SP-0C CRYPT LEVEL Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT ST. PAUL'S CATHEDRAL CHURCHYARD 1 OF 3 Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT ST. PAUL'S CATHEDRAL CHURCHYARD 2 OF 3 Drawing · 08 Jul 2026
  • ELECTRICAL SERVICES LAYOUT ST. PAUL'S CATHEDRAL CHURCHYARD 3 OF 3 Drawing · 08 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications