Planning application
Peninsular House 30 - 36 Monument Street London EC3R 8LJ
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alteration to City Walkway and all enabling works associated with the development and a change of use from Office (Class E(g)) to deliver a new Hotel (Class C1).
As published by the council, reference 26/00952/FULMAJ
Application record
- Reference
- 26/00952/FULMAJ
- Status
- Under Consideration
- Received
- 3 Jul 2026
- Validated
- 17 Jul 2026
- Ward
- Bridge And Bridge Without
- Decision by
- Delegated
- Postcode
- EC3R 8LJ
Timeline
Dates from the published record
-
3 Jul 2026
Received by City of London
-
17 Jul 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 84 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
127 documents on file for this application
- COMMENTS - LONDON BOROUGH OF CAMDEN
- COMMENTS - THAMES WATER
- COMMENTS - SURVEYOR TO THE FABRIC - ST PAUL'S CATHEDRAL
- PART 1 - DESIGN AND ACCESS STATEMENT
- PART 2 - DESIGN AND ACCESS STATEMENT
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - ACTIVE TRAVEL ENGLAND
- COMMENTS - ROYAL BOROUGH OF GREENWICH
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HEATHROW AIRPORT LIMITED
- PROPOSED SEVENTH FLOOR DEMOLITION PLAN
- CLIMATE CHANGE RESLIENCE SUSTAINABILITY STATEMENT
- CIRCULAR ECONOMY STATEMENT REPORT
- CIRCULAR ECONOMY STATEMENT TEMPLATE
- SUSTAINABILITY STATEMENT
- WHOLE LIFECYCLE CARBON ASSESSMENT (WLCA) REPORT
- WHOLE LIFECYCLE CARBON ASSESSMENT (WLCA) TEMPLATE
- NOISE ASSESSMENT
- AIR QUALITY ASSESSMENT
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- BREEAM REPORT RIBA STAGES 0-2
- DAS 01 INTRODUCTION
- DAS 03 CONSULTATION
- DAS 04 DESIGN EVALUATION AND PROPOSAL 3 OF 3
- DAS 05 PROPOSAL IN CONTEXT 1 OF 3
- DAS 05 PROPOSAL IN CONTEXT 2 OF 3
- DAS 05 PROPOSAL IN CONTEXT 3 OF 3
- DAS 07 ACCESSIBILITY
- DAS 08 TRANSPORT AND SERVICING
- DAS 09 LIGHTING STRATEGY
- DAS 10 FIRE STRATEGY
- DAS 11 SUICIDE PREVENTION STRATEGY
- DAS 04 DESIGN EVALUATION AND PROPOSAL 1 OF 3_COMPRESSED
- DAS 04 DESIGN EVALUATION AND PROPOSAL 2 OF 3_COMPRESSED
- DAS 06 SUSTAINABILITY APPROACH_COMPRESSED
- EXISTING SITE PLAN
- EXISTING BASEMENT -2 FLOOR PLAN P0
- EXISTING BASEMENT -1 FLOOR PLAN P0
- EXISTING GROUND FLOOR PLAN P0
- EXISTING FIRST FLOOR PLAN P0-A
- EXISTING SECOND FLOOR PLAN P0
- EXISTING THIRD FLOOR PLAN P0
- EXISTING FOURTH FLOOR PLAN P0
- EXISTING FIFTH FLOOR PLAN P0
- EXISTING SIXTH FLOOR PLAN P0
- EXISTING SEVENTH FLOOR PLAN P0
- EXISTING EIGHTH FLOOR PLAN P0
- EXISTING NINTH FLOOR PLAN P0
- EXISTING ROOF PLAN P0
- EXISTING NORTH ELEVATION P0
- EXISTING WEST ELEVATION P0
- EXISTING EAST ELEVATION P0
- EXISTING SECTION B-B P0
- EXISTING SECTION C-C P0
- PROPOSED BASEMENT -2 DEMOLITION PLAN P0
- PROPOSED GROUND FLOOR DEMOLITION PLAN P0
- PROPOSED SECOND FLOOR DEMOLITION PLAN P0
- PROPOSED THIRD FLOOR DEMOLITION PLAN P0
- PROPOSED FOURTH FLOOR DEMOLITION PLAN P0
- PROPOSED FIFTH FLOOR DEMOLITION PLAN P0
- PROPOSED TENTH FLOOR DEMOLITION PLAN P0
- PROPOSED ROOF DEMOLITION PLAN P0
- PROPOSED DEMOLITION - SECTION A-A P0
- PROPOSED DEMOLITION - SECTION B-B P0
- PROPOSED DEMOLITION - EAST ELEVATION P0
- PROPOSED DEMOLITION - NORTH ELEVATION P0
- PROPOSED DEMOLITION - SOUTH ELEVATION P0
- PROPOSED DEMOLITION - WEST ELEVATION P0
- PROPOSED BASEMENT -1 FLOOR PLAN P0
- PROPOSED FIRST FLOOR PLAN P0
- PROPOSED SECOND FLOOR PLAN P0
- PROPOSED THIRD FLOOR PLAN P0
- PROPOSED FIFTH FLOOR PLAN P0
- PROPOSED SEVENTH FLOOR PLAN P0
- PROPOSED EIGHTH FLOOR PLAN P0
- PROPOSED TENTH FLOOR PLAN P0
- PROPOSED ELEVENTH FLOOR PLAN P0
- PROPOSED SOUTH ELEVATION P0
- PROPOSED EAST ELEVATION P0
- FIRE STATEMENT
- SUSTAINABLE DRAINAGE STRATEGY
- FINANCIAL VIABILITY ASSESSMENT & MARKETING REPORT
- ACCESS STATEMENT
- LANDSCAPE STATEMENT-PART1
- SOCIO-ECONOMIC STATEMENT
- TRANSPORT STATEMENT
- TRAVEL PLAN
- DAYLIGHT AND SUNLIGHT REPORT
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART2
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART3
- PENINSULAR HOUSE PLANNING STATEMENT (FINAL)
- EXISTING SECTION A-A P0
- PROPOSED SITE PLAN P0
- PROPOSED GROUND FLOOR PLAN P0
- PROPOSED FOURTH FLOOR PLAN P0
- APPLICATIONFORMREDACTED
- SITE LOCATION PLAN P0
- EXISTING TENTH FLOOR PLAN P0
- EXISTING SOUTH ELEVATION P0
- PROPOSED FIRST FLOOR DEMOLITION PLAN P0
- PROPOSED SIXTH FLOOR DEMOLITION PLAN P0
- PROPOSED EIGHTH FLOOR DEMOLITION PLAN P0
- PROPOSED DEMOLITION - SECTION C-C P0
- PROPOSED BASEMENT -2 FLOOR PLAN P0
- PROPOSED ROOF PLAN P0
- PROPOSED SECTION A-A P0
- DELIVERY AND SERVICING MANAGEMENT PLAN
- LANDSCAPE STATEMENT-PART3
- LANDSCAPE STATEMENT-PART4
- LANDSCAPE STATEMENT-PART2
- CONSTRUCTION AND DEMOLITION MANAGEMENT PLAN
- ENERGY AND SUSTAINABILITY ASSESSMENT
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART1
- PROPOSED BASEMENT -1 DEMOLITION PLAN P0
- PROPOSED NINTH FLOOR DEMOLITION PLAN P0
- PROPOSED SIXTH FLOOR PLAN P0
- PROPOSED NINTH FLOOR PLAN P0
- PROPOSED NORTH ELEVATION P0
- PROPOSED WEST ELEVATION P0
- PROPOSED SECTION B-B P0
- PROPOSED SECTION C-C P0
- PRELIMINARY ECOLOGICAL ASSESSMENT
- FLOOD RISK ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- RAPID HEALTH IMPACT ASSESSMENT
- FORM_1_CIL_ADDITIONAL_INFORMATION COMPLETED BB
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART4
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 84 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Peninsular House 30 - 36 Monument Street London EC3R 8LJ
Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alt...
Granted Extension 2 docs -
Peninsular House 30 - 36 Monument Street London EC3R 8LJ
Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alt...
Decided Extension 2 docs -
Peninsular House 30 - 36 Monument Street London EC3R 8LJ
Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alteration to City Walkway and all enabling works associated with the development and a change of use from Office (Class E(g)) to deliver a new Hotel (Class C1).
Granted Extension 3 docs -
Providian House 16 - 18 Monument Street London EC3R 8AJ
99% historically approved · decision due ~16 Dec
Submission of Design Conditions Report, Lighting Control Strategy and Lighting Strategy Appendix 3.4 pursuant to condition 2(j) details of signage for all aspects of the building, 5, 17, 22 of planning permission 25/00768/FULL dated 31.10.2025.
Awaiting decision -
Providian House 16 - 18 Monument Street London EC3R 8AJ
Submission of details of: particulars and samples of the materials to be used on all external and semi-external faces of the building pursuant to condition 2 of Planning permission 25/00768/FULL dated 31.10.2025.
Granted 50 docs -
Providian House 16 - 18 Monument Street London EC3R 8AJ
100% historically approved · decision due ~17 Dec
Non-material amendment under Section 96A of the Town Planning and Country Act 1990 to planning permission reference 25/00768/FULL dated 31 October 2025 to amend Condition 30 (Approved Drawings) to enable design amendments to the consented scheme involving the flattening of stone facade elements to the Level 6 east and south elevations; and the replacement and extension of the existing Level 5 abseil cable system to the north and west elevations.
Awaiting decision Amendments Extension