Skip to content
PlanIndex Get alerts
Menu

Planning application

Peninsular House 30 - 36 Monument Street London EC3R 8LJ

Awaiting decision City of London 26/00952/FULMAJ

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alteration to City Walkway and all enabling works associated with the development and a change of use from Office (Class E(g)) to deliver a new Hotel (Class C1).

As published by the council, reference 26/00952/FULMAJ

Application record

Reference
26/00952/FULMAJ
Status
Under Consideration
Received
3 Jul 2026
Validated
17 Jul 2026
Ward
Bridge And Bridge Without
Decision by
Delegated
Postcode
EC3R 8LJ

Timeline

Dates from the published record

  1. 3 Jul 2026

    Received by City of London

  2. 17 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 11 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 78 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,250 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

CHART FORTE (PENINSULAR HOUSE) LIMITED Applicant, registered in Harrow

Active · incorporated 2025 · Harrow

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

127 documents on file for this application

  • COMMENTS - LONDON BOROUGH OF CAMDEN Consultee Comment · 24 Aug 2026
  • COMMENTS - THAMES WATER Consultee Comment · 12 Aug 2026
  • COMMENTS - SURVEYOR TO THE FABRIC - ST PAUL'S CATHEDRAL Consultee Comment · 07 Aug 2026
  • PART 1 - DESIGN AND ACCESS STATEMENT Accompanying report · 07 Aug 2026
  • PART 2 - DESIGN AND ACCESS STATEMENT Accompanying report · 07 Aug 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 05 Aug 2026
  • COMMENTS - ACTIVE TRAVEL ENGLAND Consultee Comment · 30 Jul 2026
  • COMMENTS - ROYAL BOROUGH OF GREENWICH Consultee Comment · 29 Jul 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 27 Jul 2026
  • COMMENTS - HEATHROW AIRPORT LIMITED Consultee Comment · 22 Jul 2026
  • PROPOSED SEVENTH FLOOR DEMOLITION PLAN Drawing · 17 Jul 2026
  • CLIMATE CHANGE RESLIENCE SUSTAINABILITY STATEMENT Accompanying report · 06 Jul 2026
  • CIRCULAR ECONOMY STATEMENT REPORT Accompanying report · 06 Jul 2026
  • CIRCULAR ECONOMY STATEMENT TEMPLATE Other · 06 Jul 2026
  • SUSTAINABILITY STATEMENT Accompanying report · 06 Jul 2026
  • WHOLE LIFECYCLE CARBON ASSESSMENT (WLCA) REPORT Accompanying report · 06 Jul 2026
  • WHOLE LIFECYCLE CARBON ASSESSMENT (WLCA) TEMPLATE Accompanying report · 06 Jul 2026
  • NOISE ASSESSMENT Report - Acoustic/Noise Report · 03 Jul 2026
  • AIR QUALITY ASSESSMENT Accompanying report · 03 Jul 2026
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT Report - Archaeological Report · 03 Jul 2026
  • BREEAM REPORT RIBA STAGES 0-2 Accompanying report · 03 Jul 2026
  • DAS 01 INTRODUCTION Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 03 CONSULTATION Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 04 DESIGN EVALUATION AND PROPOSAL 3 OF 3 Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 05 PROPOSAL IN CONTEXT 1 OF 3 Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 05 PROPOSAL IN CONTEXT 2 OF 3 Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 05 PROPOSAL IN CONTEXT 3 OF 3 Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 07 ACCESSIBILITY Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 08 TRANSPORT AND SERVICING Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 09 LIGHTING STRATEGY Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 10 FIRE STRATEGY Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 11 SUICIDE PREVENTION STRATEGY Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 04 DESIGN EVALUATION AND PROPOSAL 1 OF 3_COMPRESSED Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 04 DESIGN EVALUATION AND PROPOSAL 2 OF 3_COMPRESSED Report - Design & Access Statement/Report · 03 Jul 2026
  • DAS 06 SUSTAINABILITY APPROACH_COMPRESSED Report - Design & Access Statement/Report · 03 Jul 2026
  • EXISTING SITE PLAN Site Plan · 03 Jul 2026
  • EXISTING BASEMENT -2 FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING BASEMENT -1 FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING GROUND FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING FIRST FLOOR PLAN P0-A Drawing · 03 Jul 2026
  • EXISTING SECOND FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING THIRD FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING FOURTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING FIFTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING SIXTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING SEVENTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING EIGHTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING NINTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING ROOF PLAN P0 Drawing · 03 Jul 2026
  • EXISTING NORTH ELEVATION P0 Drawing · 03 Jul 2026
  • EXISTING WEST ELEVATION P0 Drawing · 03 Jul 2026
  • EXISTING EAST ELEVATION P0 Drawing · 03 Jul 2026
  • EXISTING SECTION B-B P0 Drawing · 03 Jul 2026
  • EXISTING SECTION C-C P0 Drawing · 03 Jul 2026
  • PROPOSED BASEMENT -2 DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED GROUND FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED SECOND FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED THIRD FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED FOURTH FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED FIFTH FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED TENTH FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED ROOF DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED DEMOLITION - SECTION A-A P0 Drawing · 03 Jul 2026
  • PROPOSED DEMOLITION - SECTION B-B P0 Drawing · 03 Jul 2026
  • PROPOSED DEMOLITION - EAST ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED DEMOLITION - NORTH ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED DEMOLITION - SOUTH ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED DEMOLITION - WEST ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED BASEMENT -1 FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED FIRST FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED SECOND FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED THIRD FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED FIFTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED SEVENTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED EIGHTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED TENTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED ELEVENTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED SOUTH ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED EAST ELEVATION P0 Drawing · 03 Jul 2026
  • FIRE STATEMENT Accompanying report · 03 Jul 2026
  • SUSTAINABLE DRAINAGE STRATEGY Accompanying report · 03 Jul 2026
  • FINANCIAL VIABILITY ASSESSMENT & MARKETING REPORT Accompanying report · 03 Jul 2026
  • ACCESS STATEMENT Report - Access Statement · 03 Jul 2026
  • LANDSCAPE STATEMENT-PART1 Accompanying report · 03 Jul 2026
  • SOCIO-ECONOMIC STATEMENT Accompanying report · 03 Jul 2026
  • TRANSPORT STATEMENT Report - Transport Statement/Report · 03 Jul 2026
  • TRAVEL PLAN Report - Travel Plan · 03 Jul 2026
  • DAYLIGHT AND SUNLIGHT REPORT Report - Daylight/Sunlight Report · 03 Jul 2026
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART2 Accompanying report · 03 Jul 2026
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART3 Accompanying report · 03 Jul 2026
  • PENINSULAR HOUSE PLANNING STATEMENT (FINAL) Report - Planning Statement/Report · 03 Jul 2026
  • EXISTING SECTION A-A P0 Drawing · 03 Jul 2026
  • PROPOSED SITE PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED GROUND FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED FOURTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • APPLICATIONFORMREDACTED Application Form · 03 Jul 2026
  • SITE LOCATION PLAN P0 Site Plan · 03 Jul 2026
  • EXISTING TENTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • EXISTING SOUTH ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED FIRST FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED SIXTH FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED EIGHTH FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED DEMOLITION - SECTION C-C P0 Drawing · 03 Jul 2026
  • PROPOSED BASEMENT -2 FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED ROOF PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED SECTION A-A P0 Drawing · 03 Jul 2026
  • DELIVERY AND SERVICING MANAGEMENT PLAN Accompanying report · 03 Jul 2026
  • LANDSCAPE STATEMENT-PART3 Accompanying report · 03 Jul 2026
  • LANDSCAPE STATEMENT-PART4 Accompanying report · 03 Jul 2026
  • LANDSCAPE STATEMENT-PART2 Accompanying report · 03 Jul 2026
  • CONSTRUCTION AND DEMOLITION MANAGEMENT PLAN Accompanying report · 03 Jul 2026
  • ENERGY AND SUSTAINABILITY ASSESSMENT Accompanying report · 03 Jul 2026
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART1 Accompanying report · 03 Jul 2026
  • PROPOSED BASEMENT -1 DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED NINTH FLOOR DEMOLITION PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED SIXTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED NINTH FLOOR PLAN P0 Drawing · 03 Jul 2026
  • PROPOSED NORTH ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED WEST ELEVATION P0 Drawing · 03 Jul 2026
  • PROPOSED SECTION B-B P0 Drawing · 03 Jul 2026
  • PROPOSED SECTION C-C P0 Drawing · 03 Jul 2026
  • PRELIMINARY ECOLOGICAL ASSESSMENT Accompanying report · 03 Jul 2026
  • FLOOD RISK ASSESSMENT Accompanying report · 03 Jul 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT Accompanying report · 03 Jul 2026
  • RAPID HEALTH IMPACT ASSESSMENT Accompanying report · 03 Jul 2026
  • FORM_1_CIL_ADDITIONAL_INFORMATION COMPLETED BB Other · 03 Jul 2026
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT_PART4 Accompanying report · 03 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 78 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Peninsular House 30 - 36 Monument Street London EC3R 8LJ

    PA/26/01256/NC Submitted 22 Jul 2026 0m away

    91% historically approved · decision due ~16 Sep

    Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alt...

    Awaiting decision Extension
  • Peninsular House 30 - 36 Monument Street London EC3R 8LJ

    26/2229/K Submitted 22 Jul 2026 0m away

    Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alt...

    Decided Extension 2 docs
  • Peninsular House 30 - 36 Monument Street London EC3R 8LJ

    PA/26/01256 Submitted 22 Jul 2026 0m away

    91% historically approved · decision due ~16 Sep

    Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alteration to City Walkway and all enabling works associated with the development and a change of use from Office (Class E(g)) to deliver a new Hotel (Class C1).

    Awaiting decision Extension 2 docs
  • Providian House 16 - 18 Monument Street London EC3R 8AJ

    26/00460/MDC Submitted 30 Mar 2026 38m away

    Submission of details of: particulars and samples of the materials to be used on all external and semi-external faces of the building pursuant to condition 2 of Planning permission 25/00768/FULL dated 31.10.2025.

    Granted 50 docs
  • Public Convenience Monument Street London

    25/01549/ADVT Submitted 7 Nov 2025 45m away

    97% historically approved · decision due ~2 Jan

    Installation and display of: four vinyl film displays on each facade measuring: 2925mm x 5350mm (Northern Elevation), 3200mm x 5400mm (Eastern Elevation), 2910mm x 5400mm (Southern Elevation), 3200mm x 5350mm (Western Elevation), in association with planning permission ref. 25/00742/FULL

    Awaiting decision Advertising 9 docs
  • 24 Monument Street London EC3R 8AJ

    24/00860/ADVT Submitted 12 Aug 2024 48m away

    Installation of illuminated signage measuring 400mm x 150mm at a height of 1748mm on the front elevation.

    Granted Advertising 9 docs