Planning application

Holborn Viaduct Over Shoe Lane

Granted City of London 26/00943/FULL Full applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Artistic illumination of the Holborn Viaduct over Shoe Lane, comprising the installation of: 57no. lighting components to the Holborn Viaduct over Shoe Lane; 2no. lighting components to the exterior of the City Temple and 2no. lighting components to the exterior of 40 Holborn Viaduct, and 2 Charterhouse Street.

As published by the council, reference 26/00943/FULL

Application record

Reference
26/00943/FULL
Category
Full applications
Status
Decided
Decision
Granted As published: Approved
Received
2 Jul 2026
Validated
2 Jul 2026
Decided
27 Aug 2026
Ward
Farringdon Within
Decision by
Delegated

Timeline

Dates from the published record

  1. 2 Jul 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. 27 Aug 2026

    Decision issued: Approved

  4. 10 Sep 2026

    Status changed to Decided

    Previously Under Consideration.

Cases linked to this one on the register

  • Application: 26/00944/LBC (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 27 Aug 2026
  • LOCATIONPLAN Site Plan · 02 Jul 2026
  • FORM_1_CIL_ADDITIONAL_INFORMATION SHOE LANE Other · 02 Jul 2026
  • HOLBORN VIADUCT COVER LETTER SHOE LANE Cover Letter · 02 Jul 2026
  • HOLBORN VIADUCT HERITAGE STATEMENT SHOE LANE Accompanying report · 02 Jul 2026
  • OTHER RELEVANT INFORMATION_INCLUDED_IN_ADDITIONAL PLANS Other · 02 Jul 2026
  • SHOE LANE LIGHTING AND ELECTRICAL DESIGN RIBA STAGE 4 TECHNICAL DESIGN REPORT PA Accompanying report · 02 Jul 2026
  • APPLICATIONFORMREDACTED Application Form · 02 Jul 2026
  • LIGHTING ASSESSMENT_INCLUDED_IN_DESIGN AND ACCESS STATEMENT Accompanying report · 02 Jul 2026
  • OTHER RELEVANT INFORMATION_INCLUDED_IN_DESIGN AND ACCESS STATEMENT Other · 02 Jul 2026
  • PLANNING STATEMENT_INCLUDED_IN_DESIGN AND ACCESS STATEMENT Report - Planning Statement/Report · 02 Jul 2026
  • TRANSPORT ASSESSMENT_INCLUDED_IN_DESIGN AND ACCESS STATEMENT Report - Transport Statement/Report · 02 Jul 2026
  • OUTLINE CONSTRUCTION LOGISTICS PLAN Other · 02 Jul 2026
  • SHOE LANE LIGHTING AND ELECTRICAL DESIGN RIBA STAGE 4 TECHNICAL DESIGN REPORT PA Accompanying report · 02 Jul 2026
  • OTHER RELEVANT INFORMATION_INCLUDED_IN_ADDITIONAL PLANS_37425863 Other · 02 Jul 2026
  • SITE PLAN Site Plan · 02 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 27 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications