Planning application
55 And 65 Old Broad Street London EC2M 1RX
Relates to 25/01674/NMA, 23/00469/FULEIA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of the Public Realm and Public Routes Specification and the Public Realm and Public Routes Method Statement pursuant to Schedule 3 Paragraph 11.2.1 of the S106 Agreement dated 19 December 2024 (Planning Application Reference: 23/00469/FULEIA) as amended by the Deed of Variation dated 15 June 2026 (Planning Application Reference: 25/01674/NMA).
As published by the council, reference 26/00930/PODC
Application record
- Reference
- 26/00930/PODC
- Type
- Planning Obligations
- Status
- Under Consideration
- Received
- 17 Jun 2026
- Validated
- 17 Jun 2026
- Ward
- Bishopsgate
- Decision by
- Delegated
- Postcode
- EC2M 1RX
Site history
Applications at this address on the City of London register
This site has had 20 applications since 2023: 18 approved, 0 refused.
-
26/01130/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of Substructure Design and Method Statement pursuant to discharge of Condition 14 of planning permission 23/00469/FULEIA dated 19.12.2024.
-
26/01131/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of Drainage and SuDS Report pursuant to discharge of Condition 18 of planning permission 23/00469/FULEIA dated 19.12.2024.
-
26/01118/MDC Awaiting decision
55 And 65 Old Broad Street London EC2M 1RX
Submission of Rainwater Harvesting Note, Rainwater Drainage Schematic and Above Ground Drainage Level pursuant to discharge of Condition 20 of planning permission dated 23/00469/FULEIA.
-
26/01057/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of details of design for deconstruction of the facade system pursuant to Condition 24 of planning permission 23/00469/FULEIA dated 19/12/2024.
-
26/00993/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of Construction Logistics Plan pursuant to discharge of Condition 8 of planning permission 23/00469/FULEIA dated 19.12.2024.
-
26/00951/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of detail of Façade sample pack pursuant to Condition 27 of Planning Permission 23/00469/FULEIA dated 19.12.2024.
-
26/00898/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of Infrastructure Protection Details pursuant to Condition 38 of Planning Permission 23/00469/FULEIA dated 19.12.2024.
-
26/00899/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of details of demolition & Pile Enabling and Bearing Pile design pursuant to Condition 23 of Planning Permission 23/00469/FULEIA dated 19.12.2024.
-
26/00897/MDC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of details proposed of provision of sewer vents and protection of existing drainage pursuant to Condition 21 of Planning Permission 23/00469/FULEIA dated 19.12.2024.
-
26/00929/PODC Granted
55 And 65 Old Broad Street London EC2M 1RX
Submission of the Utility Connection Requirements pursuant to Schedule 3 Paragraph 12.1 of the S106 Agreement dated 19 December 2024 (Planning Application Reference: 23/00469/FULEIA) as amended by the Deed of Variation dated 15 June 2026 (Planning Application Reference: 25/01674/NMA).
Timeline
Dates from the published record
-
17 Jun 2026
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 84 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/01674/NMA Granted
55 And 65 Old Broad Street London EC2M 1RX
Non-Material Amendment under S96A of the Town and Country Planning Act 1990 (as amended) to Planning Permission 23/00469/FULEIA dated 19th December 2024 to allow for: i) reconfiguration of planters, seating, levels, lift core, retail space arrangement, pod display vitrines and external doors at ground floor with amendment to Condition 25 to secure details of display vitrines; ii) Alterations to the treatment of retained building north elevation; iii) Alterations to landscaping arrangement of the terrace at Level 19; iv) Reduction of excavation for alteration to basement layouts; v) Alteration to arrangement of terraces and material pattern on the eastern elevation; vi) Replacement of the terraces on the western elevation at levels 3 and 4 with glazing; vii) Alteration of projecting fins on the north elevation to an expressed grid; viii) Adjustment to roof line and addition of Condition 83 to secure maximum height AOD; ix) Amendment to wording of Delivery and Servicing Conditions 56 and 67; x) Amendment to Condition 4 (Site Survey and Levels) and addition of Condition 84 (Threshold Levels and Verification Survey); and xi) Update of the figures stated in GIA Condition 81 to reflect the amended floor space.
-
23/00469/FULEIA Granted
55 And 65 Old Broad Street London EC2M 1RX
Partial demolition of existing buildings and the redevelopment of the site comprising the construction of a new building comprising ground floor plus 23 upper storeys plus 2 existing basement levels (55 Old Broad Street) for the provision of office space (Class E(g)), flexible retail / cafe (Class E(a)(b)), retention of ground floor plus 5 storey building (65 Old Broad Street) for the provision of maker / studio (Class E(g)), flexible retail / cafe / maker / studio (Class E(a)(b)(g)), flexible maker / studio / office (Class E(g)), renovation of Grade II Listed Bath House building for the provision of cultural / event uses (Sui Generis), provision of public house (Sui Generis) and improvements to public realm and routes, ancillary basement cycle parking, servicing and plant, highway improvements and other works associated with the proposed development. RE-CONSULTATION - due to amended details as explained in Cover Letter dated 29th September 2023.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
- APPLICATION EMAIL
- PUBLIC REALM METHOD STATEMENT
- DRAWINGS PACK
- OUTLINE LANDSCAPE SPECIFICATION
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 84 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
55 And 65 Old Broad Street London EC2M 1RX
Submission of the First Interference Survey pursuant to Schedule 3 Paragraph 13.1.2 of the S106 Agreement dated 19 December 2024 (Planning Application Reference: 23/00469/FULEIA).
Granted 3 docs -
55 And 65 Old Broad Street London EC2M 1RX
Submission of details of Ecological Management Plan pursuant to Condition 32 of planning permission 23/00469/FULEIA dated 19.12.2024 (as amended by 25/00128/NMA).
Granted Conditions 10 docs -
55 And 65 Old Broad Street London EC2M 1RX
Submission of Infrastructure Protection Details pursuant to Condition 38 of Planning Permission 23/00469/FULEIA dated 19.12.2024.
Granted 21 docs -
55 And 65 Old Broad Street London EC2M 1RX
Submission of details of demolition & Pile Enabling and Bearing Pile design pursuant to Condition 23 of Planning Permission 23/00469/FULEIA dated 19.12.2024.
Granted Demolition 27 docs -
55 And 65 Old Broad Street London EC2M 1RX
Submission of details proposed of provision of sewer vents and protection of existing drainage pursuant to Condition 21 of Planning Permission 23/00469/FULEIA dated 19.12.2024.
Granted 8 docs -
55 And 65 Old Broad Street London EC2M 1RX
Submission of the Utility Connection Requirements pursuant to Schedule 3 Paragraph 12.1 of the S106 Agreement dated 19 December 2024 (Planning Application Reference: 23/00469/FULEIA) as amended by the Deed of Variation dated 15 June 2026 (Planning Application Reference: 25/01674/NMA).
Granted 8 docs