Planning application
6 - 11 Crescent London EC3N 2LY
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of details of Hotel Management and Operational strategy pursuant to condition 13 of Planning Permission 24/00776/FULL dated 11.07.2025.
As published by the council, reference 26/00663/MDC
Application record
- Reference
- 26/00663/MDC
- Type
- Submission of details (Planning)
- Status
- Under Consideration
- Received
- 6 May 2026
- Validated
- 6 May 2026
- Ward
- Tower
- Decision by
- Delegated
- Postcode
- EC3N 2LY
Site history
Applications at this address on the City of London register
This site has had 10 applications since 2025: 6 approved, 0 refused.
-
26/01249/MDC Awaiting decision
6 - 11 Crescent London EC3N 2LY
Submission of details Access Management Plan pursuant to condition 16 of Planning Permission 24/00776/FULL dated 11.07.2025.
-
26/01042/MDC Granted
6 - 11 Crescent London EC3N 2LY
Submission of details of Sound insulation test report pursuant to condition 12 of Planning permission 24/00776/FULL dated 11.07.2025.
-
26/00231/MDC Awaiting decision
6 - 11 Crescent London EC3N 2LY
Submission of details of Lighting Strategy pursuant to condition 10 of Planning permission 24/00776/FULL dated 11.07.2025.
-
26/00225/MDC Awaiting decision
6 - 11 Crescent London EC3N 2LY
Submission of details of (i) particulars and samples of the materials to be used on all external faces of the building including external ground floor and upper floor surfaces (ii) detailed drawings and sections through new (iii) Notwithstanding the approved drawings, detailed drawings of the modifications of the front door etc (iv) details of the arrangements for the provision of refuse storage and collection facilities within the curtilage (v) Details of planters to front area (vi) detailed design of the new mansard roof storey including junctions with existing building (vii) details of ant extraction, louvres or other external extrusions pursuant to condition 9 of Planning permission 24/00776/FULL dated 11.07.2025.
-
25/01454/NMA Granted
6 - 11 Crescent London EC3N 2LY
Application under Section 96A of the Town and Country Planning Act 1990 (as amended) for non-material amendments to planning permission 24/00776/FULL (dated 11.07.2025) to amend condition 2 to change trigger from precommencement to three months after commencement.
-
25/00997/MDC Granted
6 - 11 Crescent London EC3N 2LY
Submission of Deconstruction and Construction Logistics Plan pursuant to discharge of condition 4 of planning permission 24/00776/FULL dated 11.07.2025.
-
25/01003/MDC Granted
6 - 11 Crescent London EC3N 2LY
Submission of Scheme of Protective Works pursuant to discharge of condition 8 of planning application 24/00776/FULL dated 10.07.2025.
-
25/00996/MDC Granted
6 - 11 Crescent London EC3N 2LY
Submission of details of protection to London wall pursuant to the discharge of condition 3 of planning permission 24/00776/FULL dated 10.07.2025.
-
25/01002/MDC Granted
6 - 11 Crescent London EC3N 2LY
Submission of information requested by London Underground pursuant to discharge of condition 5 of planning application 24/00776/FULL dated 10.07.2025.
Timeline
Dates from the published record
-
6 May 2026
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 78 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 24/00776/FULL (Decided)
Who's behind it
Company information only, from the register and Companies House
Blue Orchid (Tower Apartments) Limited Applicant, registered in London
Active · incorporated 2022 · London
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
- APPLICATIONFORMREDACTED
- 0007 000000 - IIG DOCUMENT (LETTER TO COL CONDITION 13)
- 6308-PL-098-PROPOSED_SITE_PLAN-1552070
- HOTEL OPERATIONAL MANAGEMENT PLAN - TOWER APARTMENTS.PDF
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided condition discharge and variation applications in a median of 83 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
6 - 11 Crescent London EC3N 2LY
100% historically approved · decision due ~9 Apr
Submission of details of Lighting Strategy pursuant to condition 10 of Planning permission 24/00776/FULL dated 11.07.2025.
Awaiting decision Conditions 10 docs -
6 - 11 Crescent London EC3N 2LY
100% historically approved · decision due ~8 Apr
Submission of details of (i) particulars and samples of the materials to be used on all external faces of the building including external ground floor and upper floor surfaces (ii) detailed drawings and sections through new (iii) Notwithstanding the approved drawings, detailed drawings of the modifications of the front door etc (iv) details of the arrangements for the provision of refuse storage and collection facilities within the curtilage (v) Details of planters to front area (vi) detailed design of the new mansard roof storey including junctions with existing building (vii) details of ant extraction, louvres or other external extrusions pursuant to condition 9 of Planning permission 24/00776/FULL dated 11.07.2025.
Awaiting decision Conditions Loft or dormer 8 docs -
6 - 11 Crescent London EC3N 2LY
Submission of Deconstruction and Construction Logistics Plan pursuant to discharge of condition 4 of planning permission 24/00776/FULL dated 11.07.2025.
Granted Conditions 11 docs -
6 - 11 Crescent London EC3N 2LY
Submission of Scheme of Protective Works pursuant to discharge of condition 8 of planning application 24/00776/FULL dated 10.07.2025.
Granted Conditions 13 docs -
6 - 11 Crescent London EC3N 2LY
Submission of details of protection to London wall pursuant to the discharge of condition 3 of planning permission 24/00776/FULL dated 10.07.2025.
Granted Conditions 8 docs -
6 - 11 Crescent London EC3N 2LY
Submission of information requested by London Underground pursuant to discharge of condition 5 of planning application 24/00776/FULL dated 10.07.2025.
Granted Conditions 21 docs
Other condition discharge and variation applications
In City of London
-
26/00641/MDC Granted
Development Site Salisbury Square London
Submission of Construction Local Procurement Monitoring pursuant to the partial discharge of Condition 2(B) and Court Building Details pursuant to the partial discharge of Condition 37 parts (c), (e), (f), (i), (j) and (l) of Planning Permission 20/00997/FULEIA dated 30.07.2021.
-
25/01807/MDC Granted
47-50 Mark Lane London EC3R 5AS
Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 7 of planning permission 24/01044/FULL dated 25/03/2025.
-
26/00622/MDC Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of external facing materials pursuant to part discharge of Parts E and K and full discharge of Parts F and H of Condition 21 of planning permission 26/00244/FULL dated 24th June 2026
-
26/00048/MDC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of the position and size of the green/blue roof(s), the type of planting and a substantial contribution of the green/blue roof(s) to biodiversity and rainwater attenuation pursuant to condition 11 of planning permission 22/00202/FULMAJ dated 23/01/2023.
-
26/00138/MDC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details generator technical report pursuant to condition 20 of Planning Permission 22/00202/FULMAJ dated 23.01.2023.