Planning application
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, lighting, and drinking water fountain. Works to the staff spaces to include internal reconfiguration, new WCs, showers, and kitchenette, works to the facades to upgrade glazing and frames at level 2. Upgrade and replacement fixtures, fittings and finishes and other associated works.
As published by the council, reference 26/00613/LBC
Application record
- Reference
- 26/00613/LBC
- Category
- Heritage and listed buildings
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 27 Apr 2026
- Validated
- 27 Apr 2026
- Decided
- 18 Sep 2026
- Ward
- Cripplegate
- Decision by
- Delegated
- Postcode
- EC2Y 8DS
Site history
Applications at this address on the City of London register
This site has had 15 applications since 2022: 11 approved, 0 refused.
-
26/01406/LBC Awaiting decision
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Strengthening works to existing corbels at the Barbican Centre, and associated works.
-
26/01412/FULL Awaiting decision
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Application for planning permission to allow the use of 37 car parking bays of Car Park 2 at Level -1 at the Barbican Centre for new sprinkler tanks and plant and associated external ventilation and ductwork to the GSMD lightwell, and other associated works.
-
26/01139/LBC Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Upgrade of existing and installation of additional evacuation signage and downlights within the Concert Hall, and associated works.
-
26/00612/FULL Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, and lighting, proposed parameters for temporary structures and artworks to facilitate continued use of the sculpture court for art installations, works to the staff spaces facades to upgrade glazing and frames to level 2 and other associated works.
-
25/01071/LBC Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary Condition 3 of Listed Building Consent 22/00895/LBC dated 2nd December 2022 to refer to a revised list of drawings amended to reflect design alterations and to discharge Condition 4 relating to detailed design elements of the proposal.
-
24/00496/FULL Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Temporary permission until September 2024 for seating, two pergola structures and a kiosk shed, for the serving of non-alcoholic refreshments, at the Barbican lakeside terrace area associated with the summer "pop-up" Picnic Garden (rebranded this year as Lakeside Lounge).
-
23/01363/LBC Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Replacement of existing house lighting fixtures within the Theatre with new LED fixtures. Introduction of new fittings to supplement existing lighting in the front rows of the circle, upper circle and gallery.
-
23/01236/LBC Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Removal of foot pumps and installation of hand sensors to operate taps in the Level -1.5 toilets.
-
23/01195/LBC Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Temporary installation of a fabric woven artwork for a temporary period between February 2024 and August 2024 , titled: 'Purple Hibiscus' by Ibrahim Mahama
-
23/01194/FULL Granted
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Temporary installation of a fabric woven artwork, for a temporary period between February 2024 and August 2024, titled: 'Purple Hibiscus' by Ibrahim Mahama.
Timeline
Dates from the published record
-
27 Apr 2026
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
18 Sep 2026
Decision issued: Approved
-
18 Sep 2026
Status changed to Decided
Previously Under Consideration.
Related applications
Cases linked to this one on the register
- Application: 26/00612/FULL (Under Consideration)
Documents
Plans, drawings, consultee responses and the officer's report
133 documents on file for this application
- IMPACT-RESISTANT WALL + CEILING LUMINAIRES PROTECTION CLASS IP 65
- OUTLINE VENUE MANAGEMENT PLAN
- STAFF SPACES FRAME STUDY FOR PLANNING INPUT
- FROBISHER CRESCENT FACADE ELEVATIONS SOUTH- PROPOSED
- LEVEL 06- PLAN_AWC MARKUP
- DRAWING SCHEDULE
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - TWENTIETH CENTURY SOCIETY
- REPRESENTATION - FROBISHER CRESCENT HOUSE GROUP
- THE_STATUTORY_METRIC
- APPLICATIONFORMREDACTED
- CIL FORM
- BARBICAN SCULPTURE COURT AND STAFF SPACES - COL HANDLING NOTE
- BARBICAN SCULPTURE COURT AND STAFF SPACES - COVER LETTER
- BRP SCULPTURE COURT AND STAFF SPACES - PLANNING STATEMENT
- 2026.04.24 BRP SO AND SC CMP - REV01PART-1
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART9
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART10
- BCRPSC-CHB-ZZ-ZZZZ-RP-AU-07001 BRP SCULPTURE-STAFF - NOISE IMPACT ASSSESSMENT -
- 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP
- 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP
- 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP
- PROPOSED SITE PLAN
- PROPOSED PLAN
- PROPOSED PLAN WITH LEVELS
- PROPOSED HARD LANDSCAPE PLAN
- PROPOSED BLUE ROOFS PLAN
- PROPOSED PLANTING STRATEGY PLAN
- PROPOSED SOIL DEPTH PLAN
- SCULPTURE COURT EXISTING SECTION AA WITH LEVELS
- SCULPTURE COURT EXISTING SECTION AA
- SCULPTURE COURT EXISTING BB WITH LEVELS
- SCULPTURE COURT EXISTING BB
- SCULPTURE COURT PROPOSED SECTION AA WITH LEVELS
- SCULPTURE COURT PROPOSED SECTION AA
- SCULPTURE COURT PROPOSED SECTION BB WITH LEVELS
- SCULPTURE COURT PROPOSED SECTION BB
- PLANTER AND ART GALLERY STEPS SECTION
- PLANTER AND SEATING NICHE SECTION
- STEPS AND ROOFLIGHT SECTION
- FROBISHER CRESCENT FACADE SOUTH- BAY STUDY- PRO
- LEVEL 02- PLAN- NORTH- STRIP OUT
- 2026.04.24 BRP SO AND SC CMP - REV01PART-3
- 2026.04.24 BRP SO AND SC CMP - REV01PART-4
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART29
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART30
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART31
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_LIGHTING STRATEGY_COMPRESSED
- SCULPTURE COURT PARAMETER SECTION 1 - ARTWORK
- FROBISHER CRESCENT FACADE ELEVATIONS SOUTH
- SILK STREET EXTERNAL FACADE ELEVATIONS
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART2
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART3
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART4
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART5
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART21
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART22
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART24
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART28
- 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP
- ROOFLIGHT AND PLANTER SECTION
- BRP_SCULPTURE COURT AND STAFF SPACES DRAWING LIST
- SCULPTURE COURT PARAMETER PLAN - ARTWORK
- SCULPTURE COURT PARAMETER SECTION 2 - ARTWORK
- LEVEL 02- PLAN NORTH
- LEVEL 02- PLAN SOUTH
- LEVEL 02- RCP NORTH
- LEVEL 02- RCP SOUTH
- FROBISHER CRESCENT FACADE ELEVATIONS NORTH
- LEVEL 06- PLAN
- LEVEL 06- RCP
- BCRP00-AAM-ZZ-SPXX-DR-AR-07000- LOCATION PLAN- LBC
- LEVEL 02- PLAN- SOUTH- STRIP OUT
- LEVEL 02- RCP- SOUTH- STRIP OUT
- FROBISHER CRESCENT FACADE ELEVATIONS NORTH- STR
- FROBISHER CRESCENT FACADE ELEVATIONS SOUTH- STR
- EXISTING SITE PLAN
- FABRIC REMOVAL PLAN
- INTERNAL COURTYARD GLAZING ELEVATIONS- PROPOSED
- LEVEL 06- PLAN- PROPOSED
- LEVEL 06-RCP- PROPOSED
- LEVEL 02- RCP- NORTH- STRIP OUT
- SILK STREET FACADE AND INTERNAL COURTYARD ELEVA
- LEVEL 06- PLAN- STRIP OUT
- SCULPTURE COURT VISUAL ARTS MANAGEMENT PLAN
- OUTLINE VENUE MANAGEMENT PLAN
- 2026.04.24 BRP SO AND SC CMP - REV01PART-2
- BR SCULPTURE COURT STATEMENT OF COMMUNITY INVOLVEMENT APRIL 2026_COMPRESSED
- BCRPSS-BHE-ZZ-ZZZZ-RP-FS-0001 - FIRE STATEMENT
- BCRPSC-BHE-XX-XXXX-RP-EC-07003 - BIODIVERSITY NET GAIN STATEMENT
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART6
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART7
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART8
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART11
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART12
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART13
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART14
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART15
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART16
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART17
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART18
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART19
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART20
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART23
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART25
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART26
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART27
- EXISTING SITE PLAN WITH LEVELS
- BCRPSC-BHE-XX-XXXX-RP-EC-07004 - ECOLOGICAL IMPACT ASSESSMENT
- THE_STATUTORY_METRIC_BARBICAN SCULPTURE COURT
- BCRP00-BHE-XX-XXXX-RP-SP-07002 - ENERGY AND SUSTAINABILITY STATEMENT
- BCRP00-BHE-XX-XXXX-RP-EE-07002 - LIGHTING (BACK OF HOUSE) REPORT
- BCRPSC-BHE-XX-XXXX-RP-IN-07002 - SURFACE WATER DRAINAGE STRATEGY STATEMENT
- BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART1
- SILK STREET INTERNAL FACADE ELEVATIONS
- INTERNAL COURTYARD FACADE ELEVATIONS
- INTERNAL COURTYARD GLAZING ELEVATIONS
- BCRP00-AAM-ZZ-SPXX-DR-AR-07001- LOCATION PLAN- PLANNING
- SITE PLAN- LBC
- SITE PLAN - PLANNING
- LEVEL 02- PLAN NORTH- PROPOSED
- LEVEL 02- PLAN SOUTH- PROPOSED
- LEVEL 02- RCP NORTH- PROPOSED
- LEVEL 02- RCP SOUTH- PROPOSED
- NORTH- TYPICAL INTERNAL ELEVATIONS- PROPOSED
- SOUTH- TYPICAL INTERNAL ELEVATIONS- PROPOSED
- FROBISHER CRESCENT FACADE ELEVATIONS NORTH- PRO
- SILK STREET FACADE EXTERNAL ELEVATIONS- PROPOSE
- SILK STREET FACADE INTERNAL ELEVATIONS- PROPOSE
- INTERNAL COURTYARD FACADE ELEVATIONS- PROPOSED
- FROBISHER CRESCENT FACADE NORTH- BAY STUDY- PRO
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 18 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Reconfiguration and upgrade of the concert hall backstage areas to include the amalgamation of smaller dressing rooms, changing spaces and support spaces; the reconfiguration of the artist lounge and bar ; rationalisation of showers to provide a wheelchair accessible dressing room with an en-suite WC and shower; fire safety upgrades, update layout of a rehearsal spaces, and provision of fire rated storage space and other associated works throughout.
Granted Heritage and listed buildings 51 docs -
Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS
Non-Material Amendment under Section 96a of the Town and Country Planning Act (1990) (as amended) to planning permission Ref. 25/00917/FULL dated 24 February 2026 to amend condition 22 (TfL Infrastructure) to enable a phased discharge of the condition.
Granted Amendments -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
100% historically approved · decision due ~1 Dec
Strengthening works to existing corbels at the Barbican Centre, and associated works.
Awaiting decision Heritage and listed buildings -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
99% historically approved · decision due ~1 Dec
Application for planning permission to allow the use of 37 car parking bays of Car Park 2 at Level -1 at the Barbican Centre for new sprinkler tanks and plant and associated external ventilation and ductwork to the GSMD lightwell, and other associated works.
Awaiting decision Full applications 22 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, and lighting, proposed parameters for temporary structures and artworks to facilitate continued use of the sculpture court for art installations, works to the staff spaces facades to upgrade glazing and frames to level 2 and other associated works.
Granted Full applications Windows or glazing 133 docs -
Library Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Internal refurbishment works to the Library, comprising: a) Removal and storage of original joinery items to Children's Library b) Removal of non-original joinery and floor finishes c) Alterations to original bookshelves d) Additional joinery to complement existing e) Installation of new mesh security screen and door access controls f) Additional power provision and cabinet g) Alterations to signage h) Alterations to non-original lighting built into joinery i) New floor finishes throughout public areas of the Library
Granted Heritage and listed buildings 36 docs
Other heritage and listed building applications
In City of London
-
26/01084/LBC Granted
Chapter House St Paul's Churchyard London EC4M 8AD
Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).
-
24/00563/LBC Granted
6-7 New Street London EC2M 4TP
External alterations to windows on rear elevation of number 7 and mansard roof of number 6 and internal alterations in association with conversion of two dwelling houses into eight studio flats and one two bedroom flat.
-
26/01174/LBC Granted
Central Criminal Court Old Bailey London EC4M 7EH
Refurbishment of existing WCs on the fourth floor, and introduction of additional accessible/ unisex facilities.
-
24/01057/LBC Withdrawn
Snow Hill Police Station 5 Snow Hill London EC1A 2DP
Installation of 2x lanterns with hub branding and one internally illuminated sign.
-
26/01485/LBC Awaiting decision
609 Seddon House Barbican London EC2Y 8BX
Internal alterations comprising the demolition of bedroom, bathroom and kitchen stud walls and doors; reconstruction of walls in a partially reconfigured manner; refurbishment works; and installation of suspended false ceiling in landing and kitchen areas.