Skip to content
PlanIndex Get alerts
Menu

Planning application

Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

Decided City of London 26/00613/LBC Heritage and listed buildings

Works: Windows or glazing

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, lighting, and drinking water fountain. Works to the staff spaces to include internal reconfiguration, new WCs, showers, and kitchenette, works to the facades to upgrade glazing and frames at level 2. Upgrade and replacement fixtures, fittings and finishes and other associated works.

As published by the council, reference 26/00613/LBC

Application record

Reference
26/00613/LBC
Category
Heritage and listed buildings
Status
Decided
Received
27 Apr 2026
Validated
27 Apr 2026
Ward
Cripplegate
Decision by
Delegated
Postcode
EC2Y 8DS

Site history

Applications at this address on the City of London register

This site has had 5 applications since 2023: 2 approved, 0 refused.

  • 26/01139/LBC Awaiting decision

    Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    Upgrade of existing and installation of additional evacuation signage and downlights within the Concert Hall, and associated works.

    Submitted 7 Aug 2026 Heritage and listed buildings
  • 26/00612/FULL Decided

    Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, and lighting, proposed parameters for temporary structures and artworks to facilitate continued use of the sculpture court for art installations, works to the staff spaces facades to upgrade glazing and frames to level 2 and other associated works.

    Submitted 27 Apr 2026 Full applications
  • 25/01071/LBC Granted

    Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary Condition 3 of Listed Building Consent 22/00895/LBC dated 2nd December 2022 to refer to a revised list of drawings amended to reflect design alterations and to discharge Condition 4 relating to detailed design elements of the proposal.

    Decided 21 Nov 2025 Heritage and listed buildings
  • 23/01363/LBC Granted

    Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    Replacement of existing house lighting fixtures within the Theatre with new LED fixtures. Introduction of new fittings to supplement existing lighting in the front rows of the circle, upper circle and gallery.

    Decided 10 Oct 2024 Heritage and listed buildings

Timeline

Dates from the published record

  1. 27 Apr 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. 18 Sep 2026

    Status changed to Decided

    Previously Under Consideration.

Cases linked to this one on the register

  • Application: 26/00612/FULL (Under Consideration)

Documents

Plans, drawings, consultee responses and the officer's report

133 documents on file for this application

  • IMPACT-RESISTANT WALL + CEILING LUMINAIRES PROTECTION CLASS IP 65 Other · 12 Aug 2026
  • OUTLINE VENUE MANAGEMENT PLAN Other · 12 Aug 2026
  • STAFF SPACES FRAME STUDY FOR PLANNING INPUT Drawing · 12 Aug 2026
  • FROBISHER CRESCENT FACADE ELEVATIONS SOUTH- PROPOSED Drawing · 12 Aug 2026
  • LEVEL 06- PLAN_AWC MARKUP Drawing · 12 Aug 2026
  • DRAWING SCHEDULE Drawings Schedule · 12 Aug 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 17 Jun 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 05 Jun 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 05 Jun 2026
  • COMMENTS - TWENTIETH CENTURY SOCIETY Consultee Comment · 01 Jun 2026
  • REPRESENTATION - FROBISHER CRESCENT HOUSE GROUP Public Comment · 28 May 2026
  • THE_STATUTORY_METRIC Other · 29 Apr 2026
  • APPLICATIONFORMREDACTED Application Form · 27 Apr 2026
  • CIL FORM Other · 27 Apr 2026
  • BARBICAN SCULPTURE COURT AND STAFF SPACES - COL HANDLING NOTE Other · 27 Apr 2026
  • BARBICAN SCULPTURE COURT AND STAFF SPACES - COVER LETTER Cover Letter · 27 Apr 2026
  • BRP SCULPTURE COURT AND STAFF SPACES - PLANNING STATEMENT Report - Planning Statement/Report · 27 Apr 2026
  • 2026.04.24 BRP SO AND SC CMP - REV01PART-1 Other · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART9 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART10 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRPSC-CHB-ZZ-ZZZZ-RP-AU-07001 BRP SCULPTURE-STAFF - NOISE IMPACT ASSSESSMENT - Report - Acoustic/Noise Report · 27 Apr 2026
  • 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP Accompanying report · 27 Apr 2026
  • 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP Accompanying report · 27 Apr 2026
  • 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP Accompanying report · 27 Apr 2026
  • PROPOSED SITE PLAN Drawing · 27 Apr 2026
  • PROPOSED PLAN Drawing · 27 Apr 2026
  • PROPOSED PLAN WITH LEVELS Drawing · 27 Apr 2026
  • PROPOSED HARD LANDSCAPE PLAN Drawing · 27 Apr 2026
  • PROPOSED BLUE ROOFS PLAN Drawing · 27 Apr 2026
  • PROPOSED PLANTING STRATEGY PLAN Drawing · 27 Apr 2026
  • PROPOSED SOIL DEPTH PLAN Drawing · 27 Apr 2026
  • SCULPTURE COURT EXISTING SECTION AA WITH LEVELS Drawing · 27 Apr 2026
  • SCULPTURE COURT EXISTING SECTION AA Drawing · 27 Apr 2026
  • SCULPTURE COURT EXISTING BB WITH LEVELS Drawing · 27 Apr 2026
  • SCULPTURE COURT EXISTING BB Drawing · 27 Apr 2026
  • SCULPTURE COURT PROPOSED SECTION AA WITH LEVELS Drawing · 27 Apr 2026
  • SCULPTURE COURT PROPOSED SECTION AA Drawing · 27 Apr 2026
  • SCULPTURE COURT PROPOSED SECTION BB WITH LEVELS Drawing · 27 Apr 2026
  • SCULPTURE COURT PROPOSED SECTION BB Drawing · 27 Apr 2026
  • PLANTER AND ART GALLERY STEPS SECTION Drawing · 27 Apr 2026
  • PLANTER AND SEATING NICHE SECTION Drawing · 27 Apr 2026
  • STEPS AND ROOFLIGHT SECTION Drawing · 27 Apr 2026
  • FROBISHER CRESCENT FACADE SOUTH- BAY STUDY- PRO Drawing · 27 Apr 2026
  • LEVEL 02- PLAN- NORTH- STRIP OUT Drawing · 27 Apr 2026
  • 2026.04.24 BRP SO AND SC CMP - REV01PART-3 Other · 27 Apr 2026
  • 2026.04.24 BRP SO AND SC CMP - REV01PART-4 Other · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART29 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART30 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART31 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_LIGHTING STRATEGY_COMPRESSED Other · 27 Apr 2026
  • SCULPTURE COURT PARAMETER SECTION 1 - ARTWORK Drawing · 27 Apr 2026
  • FROBISHER CRESCENT FACADE ELEVATIONS SOUTH Drawing · 27 Apr 2026
  • SILK STREET EXTERNAL FACADE ELEVATIONS Drawing · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART2 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART3 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART4 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART5 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART21 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART22 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART24 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART28 Report - Design & Access Statement/Report · 27 Apr 2026
  • 2026-04-22 - BARBICAN SCULPTURE COURT AND STAFF SPACES - HERITAGE STATEMENT_COMP Accompanying report · 27 Apr 2026
  • ROOFLIGHT AND PLANTER SECTION Drawing · 27 Apr 2026
  • BRP_SCULPTURE COURT AND STAFF SPACES DRAWING LIST Other · 27 Apr 2026
  • SCULPTURE COURT PARAMETER PLAN - ARTWORK Drawing · 27 Apr 2026
  • SCULPTURE COURT PARAMETER SECTION 2 - ARTWORK Drawing · 27 Apr 2026
  • LEVEL 02- PLAN NORTH Drawing · 27 Apr 2026
  • LEVEL 02- PLAN SOUTH Drawing · 27 Apr 2026
  • LEVEL 02- RCP NORTH Drawing · 27 Apr 2026
  • LEVEL 02- RCP SOUTH Drawing · 27 Apr 2026
  • FROBISHER CRESCENT FACADE ELEVATIONS NORTH Drawing · 27 Apr 2026
  • LEVEL 06- PLAN Drawing · 27 Apr 2026
  • LEVEL 06- RCP Drawing · 27 Apr 2026
  • BCRP00-AAM-ZZ-SPXX-DR-AR-07000- LOCATION PLAN- LBC Site Plan · 27 Apr 2026
  • LEVEL 02- PLAN- SOUTH- STRIP OUT Drawing · 27 Apr 2026
  • LEVEL 02- RCP- SOUTH- STRIP OUT Drawing · 27 Apr 2026
  • FROBISHER CRESCENT FACADE ELEVATIONS NORTH- STR Drawing · 27 Apr 2026
  • FROBISHER CRESCENT FACADE ELEVATIONS SOUTH- STR Drawing · 27 Apr 2026
  • EXISTING SITE PLAN Site Plan · 27 Apr 2026
  • FABRIC REMOVAL PLAN Drawing · 27 Apr 2026
  • INTERNAL COURTYARD GLAZING ELEVATIONS- PROPOSED Drawing · 27 Apr 2026
  • LEVEL 06- PLAN- PROPOSED Drawing · 27 Apr 2026
  • LEVEL 06-RCP- PROPOSED Drawing · 27 Apr 2026
  • LEVEL 02- RCP- NORTH- STRIP OUT Drawing · 27 Apr 2026
  • SILK STREET FACADE AND INTERNAL COURTYARD ELEVA Drawing · 27 Apr 2026
  • LEVEL 06- PLAN- STRIP OUT Drawing · 27 Apr 2026
  • SCULPTURE COURT VISUAL ARTS MANAGEMENT PLAN Other · 27 Apr 2026
  • OUTLINE VENUE MANAGEMENT PLAN Other · 27 Apr 2026
  • 2026.04.24 BRP SO AND SC CMP - REV01PART-2 Other · 27 Apr 2026
  • BR SCULPTURE COURT STATEMENT OF COMMUNITY INVOLVEMENT APRIL 2026_COMPRESSED Other · 27 Apr 2026
  • BCRPSS-BHE-ZZ-ZZZZ-RP-FS-0001 - FIRE STATEMENT Other · 27 Apr 2026
  • BCRPSC-BHE-XX-XXXX-RP-EC-07003 - BIODIVERSITY NET GAIN STATEMENT Other · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART6 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART7 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART8 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART11 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART12 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART13 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART14 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART15 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART16 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART17 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART18 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART19 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART20 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART23 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART25 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART26 Report - Design & Access Statement/Report · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART27 Report - Design & Access Statement/Report · 27 Apr 2026
  • EXISTING SITE PLAN WITH LEVELS Site Plan · 27 Apr 2026
  • BCRPSC-BHE-XX-XXXX-RP-EC-07004 - ECOLOGICAL IMPACT ASSESSMENT Other · 27 Apr 2026
  • THE_STATUTORY_METRIC_BARBICAN SCULPTURE COURT Other · 27 Apr 2026
  • BCRP00-BHE-XX-XXXX-RP-SP-07002 - ENERGY AND SUSTAINABILITY STATEMENT Other · 27 Apr 2026
  • BCRP00-BHE-XX-XXXX-RP-EE-07002 - LIGHTING (BACK OF HOUSE) REPORT Other · 27 Apr 2026
  • BCRPSC-BHE-XX-XXXX-RP-IN-07002 - SURFACE WATER DRAINAGE STRATEGY STATEMENT Other · 27 Apr 2026
  • BCRP00-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_VOL.1_PART1 Report - Design & Access Statement/Report · 27 Apr 2026
  • SILK STREET INTERNAL FACADE ELEVATIONS Drawing · 27 Apr 2026
  • INTERNAL COURTYARD FACADE ELEVATIONS Drawing · 27 Apr 2026
  • INTERNAL COURTYARD GLAZING ELEVATIONS Drawing · 27 Apr 2026
  • BCRP00-AAM-ZZ-SPXX-DR-AR-07001- LOCATION PLAN- PLANNING Site Plan · 27 Apr 2026
  • SITE PLAN- LBC Site Plan · 27 Apr 2026
  • SITE PLAN - PLANNING Site Plan · 27 Apr 2026
  • LEVEL 02- PLAN NORTH- PROPOSED Drawing · 27 Apr 2026
  • LEVEL 02- PLAN SOUTH- PROPOSED Drawing · 27 Apr 2026
  • LEVEL 02- RCP NORTH- PROPOSED Drawing · 27 Apr 2026
  • LEVEL 02- RCP SOUTH- PROPOSED Drawing · 27 Apr 2026
  • NORTH- TYPICAL INTERNAL ELEVATIONS- PROPOSED Drawing · 27 Apr 2026
  • SOUTH- TYPICAL INTERNAL ELEVATIONS- PROPOSED Drawing · 27 Apr 2026
  • FROBISHER CRESCENT FACADE ELEVATIONS NORTH- PRO Drawing · 27 Apr 2026
  • SILK STREET FACADE EXTERNAL ELEVATIONS- PROPOSE Drawing · 27 Apr 2026
  • SILK STREET FACADE INTERNAL ELEVATIONS- PROPOSE Drawing · 27 Apr 2026
  • INTERNAL COURTYARD FACADE ELEVATIONS- PROPOSED Drawing · 27 Apr 2026
  • FROBISHER CRESCENT FACADE NORTH- BAY STUDY- PRO Drawing · 27 Apr 2026

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

City of London has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    26/00612/FULL Submitted 27 Apr 2026 0m away

    98% historically approved · decision due ~22 Jun

    New hard and soft landscaping for the sculpture court to include removal and replacement of all paving with new waterproofing below, new ramps and steps, new raised planting beds, seating, and lighting, proposed parameters for temporary structures and artworks to facilitate continued use of the sculpture court for art installations, works to the staff spaces facades to upgrade glazing and frames to level 2 and other associated works.

    Decided Full applications Windows or glazing 133 docs
  • Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    26/01139/LBC Submitted 7 Aug 2026 0m away

    100% historically approved · decision due ~2 Oct

    Upgrade of existing and installation of additional evacuation signage and downlights within the Concert Hall, and associated works.

    Awaiting decision Heritage and listed buildings 40 docs
  • Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    22/00943/LBC Submitted 5 Oct 2022 2m away

    Listed Building Consent for internal and external works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.

    Granted Heritage and listed buildings Windows or glazing 37 docs
  • Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    22/00942/FULL Submitted 5 Oct 2022 2m away

    Internal and External works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.

    Granted Full applications Windows or glazing 39 docs
  • Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    26/00707/LBC Submitted 15 May 2026 40m away

    Reconfiguration and upgrade of the concert hall backstage areas to include the amalgamation of smaller dressing rooms, changing spaces and support spaces; the reconfiguration of the artist lounge and bar ; rationalisation of showers to provide a wheelchair accessible dressing room with an en-suite WC and shower; fire safety upgrades, update layout of a rehearsal spaces, and provision of fire rated storage space and other associated works throughout.

    Granted Heritage and listed buildings 51 docs
  • Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    25/01071/LBC Submitted 5 Aug 2025 40m away

    Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary Condition 3 of Listed Building Consent 22/00895/LBC dated 2nd December 2022 to refer to a revised list of drawings amended to reflect design alterations and to discharge Condition 4 relating to detailed design elements of the proposal.

    Granted Heritage and listed buildings 46 docs

In City of London

  • 26/00934/LBC Granted

    Adelaide House London Bridge London EC4R 9HA

    Internal alterations including the provision of a building management suite within the basement and a business lounge and meeting room suite at ground floor level.

    Received 1 Jul, published by the council 31 Jul 2026 Heritage and listed buildings
  • 26/00986/LBC Granted

    Kings College Maughan Library Chancery Lane London WC2A 1LR

    Installation of acoustic panels in 5no. teaching spaces.

    Received 10 Jul, published by the council 24 Jul 2026 Heritage and listed buildings
  • 26/00937/LBC Granted

    Retail Unit 85 Fleet Street London EC4Y 1AE

    Listed Building Consent (i) to drill a hole in brickwork to allow for fixing of external illumination and (ii) a power cable, utilising the existing bracket in connection with 26/00374/ADVT

    Received 1 Jul, published by the council 24 Jul 2026 Heritage and listed buildings
  • 26/00970/LBC Granted

    Ground Floor And Basement, 26 Throgmorton Street And 123 Old Broad Street, London EC2N 2AN

    External alterations to the building frontage and internal redecoration and refurbishment of ground floor and basement levels.

    Received 8 Jul, published by the council 24 Jul 2026 Heritage and listed buildings
  • 26/00697/LBC Granted

    Livery Hall Coopers Hall 13 Devonshire Square London EC2M 4TH

    Internal and external alterations including replacement of the boiler and installation of a new flue, window repairs, minor structural repairs to the slated roof and installation of a man safe system, brickwork repairs, removal of paint and DOFF cleaning to masonry.

    Received 13 May, published by the council 24 Jul 2026 Heritage and listed buildings