Planning application
St Brides House 10 Salisbury Square London EC4Y 8EH
Works: Demolition
Relates to 25/00664/FULMAJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of the Local Training, Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraph 3.2 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
As published by the council, reference 26/00501/PODC
Application record
- Reference
- 26/00501/PODC
- Type
- Planning Obligations
- Status
- Decided
- Decision
- Approved
- Received
- 2 Mar 2026
- Validated
- 8 Apr 2026
- Decided
- 12 May 2026
- Ward
- Castle Baynard
- Decision by
- Delegated
- Postcode
- EC4Y 8EH
Site history
Applications at this address on the City of London register
This site has had 25 applications since 2025: 23 approved, 0 refused.
-
26/01041/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Ecological Management Plan pursuant to condition 37 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00888/PODC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.3-2.1.4 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00889/PODC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00795/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Design document pursuant to condition 15 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00807/PODC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00681/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of written scheme of investigation pursuant to condition 11(c) of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00532/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Circular Economy Statement pursuant to condition 29(b) of Planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00533/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Whole Life Cycle Carbon Emissions Report pursuant to condition 31 of Planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00512/NMA Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to vary Condition 39 (Approved Drawings) of planning permission ref: 25/00664/FULMAJ dated 23.12.2025, to accommodate design amendments, namely: (i) column strengthening within St Bride's Passage (ii) retention and alterations to balustrades at ground floor level (iii) provision of metal balustrades at levels 01 to 05 (iv) provision of safety line system and foldable guardrail at roof level (v) extension of static walkway balustrades at roof level (vi) retention of external wall upstand at level 01 (vii) reduction in size of loading bay rolling shutter (viii) reconfiguration of basement level layout (ix) reconfiguration of west core and riser layout (x) reconfiguration of reception and loading bay layout at ground floor level (xi) Provision of inward opening doors at ground floor level (xii) provision of an AOV, access hatch and smoke extract fan at roof level (xiii) reconfiguration of roof access ladder and stairs.
-
26/00370/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Climate Change Resilience Statement pursuant to 14 of Planning permission 25/00664/FULMAJ dated 23.12.2025.
Timeline
Dates from the published record
-
2 Mar 2026
Received by City of London
-
8 Apr 2026
Validated
Checked as complete and ready for consideration.
-
12 May 2026
Decision issued: Approved
-
24 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
25/00664/FULMAJ Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Refurbishment and extension of the existing building including: (i) Demolition of existing 6th floor (roof) level; (ii) Two storey extension at floor 6 and 7; and infill extensions at ground floor, fourth, and fifth floors, to provide additional office space (Class E use); (iv) Creation of new facade at floor 5; (v) Creation of new roof terrace on floor 7, including new plant on roof, at floor 8; (iv) Works to the public realm at St Bride's Passage; and other associated works.
Who's behind it
Company information only, from the register and Companies House
Newmark LLP Applicant
977 applications on PlanIndex · across 39 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
- APPROVAL OF SUBMISSION
- APPLICATION EMAIL
- LOCAL TRAINING, SKILLS AND JOB BROKERAGE STRATEGY (DEMOLITION)
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 12 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Procurement Strategy (Demolition) pursuant to Schedule 3 Paragraph 2.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
Granted Demolition 3 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Climate Change Resilience Statement pursuant to 14 of Planning permission 25/00664/FULMAJ dated 23.12.2025.
Granted Conditions 6 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Circular Economy Statement pursuant to condition 29(b) of Planning permission 25/00664/FULMAJ dated 23.12.2025.
Granted Conditions 7 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Whole Life Cycle Carbon Emissions Report pursuant to condition 31 of Planning permission 25/00664/FULMAJ dated 23.12.2025.
Granted Conditions 6 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Design document pursuant to condition 15 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
Granted 7 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
99% historically approved · decision due ~30 Jul
Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
Awaiting decision 2 docs