Planning application
St Brides House 10 Salisbury Square London EC4Y 8EH
Works: Extension Roofing Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Refurbishment and extension of the existing building including: (i) Demolition of existing 6th floor (roof) level; (ii) Two storey extension at floor 6 and 7; and infill extensions at ground floor, fourth, and fifth floors, to provide additional office space (Class E use); (iv) Creation of new facade at floor 5; (v) Creation of new roof terrace on floor 7, including new plant on roof, at floor 8; (iv) Works to the public realm at St Bride's Passage; and other associated works.
As published by the council, reference 25/00664/FULMAJ
Application record
- Reference
- 25/00664/FULMAJ
- Type
- Full Major Application
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 19 May 2025
- Validated
- 19 May 2025
- Decided
- 23 Dec 2025
- Ward
- Castle Baynard
- Decision by
- Delegated
- Postcode
- EC4Y 8EH
Site history
Applications at this address on the City of London register
This site has had 26 applications since 2025: 23 approved, 0 refused.
-
26/01401/MDC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of design document pursuant to condition 27(b) 1:10 detailed drawings of the existing and proposed windows; (c) irrespective of approved drawings, typical facade details, of agreed sections of the facades, including reference to materials, finishes, lighting; (e) irrespective of approved drawings, details of plant screening at roof level; (g) details of walls, railings, balustrades, ramps, gates, screens, handrails etc, bounding or within the site; and (j) details of service vehicle, fire escape and cycle store entrances of planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/01041/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Ecological Management Plan pursuant to condition 37 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00888/PODC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.3-2.1.4 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00889/PODC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00795/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Design document pursuant to condition 15 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00807/PODC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00681/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of written scheme of investigation pursuant to condition 11(c) of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00532/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Circular Economy Statement pursuant to condition 29(b) of Planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00533/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Whole Life Cycle Carbon Emissions Report pursuant to condition 31 of Planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00512/NMA Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to vary Condition 39 (Approved Drawings) of planning permission ref: 25/00664/FULMAJ dated 23.12.2025, to accommodate design amendments, namely: (i) column strengthening within St Bride's Passage (ii) retention and alterations to balustrades at ground floor level (iii) provision of metal balustrades at levels 01 to 05 (iv) provision of safety line system and foldable guardrail at roof level (v) extension of static walkway balustrades at roof level (vi) retention of external wall upstand at level 01 (vii) reduction in size of loading bay rolling shutter (viii) reconfiguration of basement level layout (ix) reconfiguration of west core and riser layout (x) reconfiguration of reception and loading bay layout at ground floor level (xi) Provision of inward opening doors at ground floor level (xii) provision of an AOV, access hatch and smoke extract fan at roof level (xiii) reconfiguration of roof access ladder and stairs.
Timeline
Dates from the published record
-
19 May 2025
Received by City of London
-
23 Dec 2025
Decision issued: Approved
-
7 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
15+ later applications on the register refer to this one:
-
26/01401/MDC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of design document pursuant to condition 27(b) 1:10 detailed drawings of the existing and proposed windows; (c) irrespective of approved drawings, typical facade details, of agreed sections of the facades, including reference to materials, finishes, lighting; (e) irrespective of approved drawings, details of plant screening at roof level; (g) details of walls, railings, balustrades, ramps, gates, screens, handrails etc, bounding or within the site; and (j) details of service vehicle, fire escape and cycle store entrances of planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/01041/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Ecological Management Plan pursuant to condition 37 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00888/PODC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.3-2.1.4 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00889/PODC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00795/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Design document pursuant to condition 15 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00807/PODC Awaiting decision
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00681/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of written scheme of investigation pursuant to condition 11(c) of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00532/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Circular Economy Statement pursuant to condition 29(b) of Planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00533/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Whole Life Cycle Carbon Emissions Report pursuant to condition 31 of Planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00512/NMA Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to vary Condition 39 (Approved Drawings) of planning permission ref: 25/00664/FULMAJ dated 23.12.2025, to accommodate design amendments, namely: (i) column strengthening within St Bride's Passage (ii) retention and alterations to balustrades at ground floor level (iii) provision of metal balustrades at levels 01 to 05 (iv) provision of safety line system and foldable guardrail at roof level (v) extension of static walkway balustrades at roof level (vi) retention of external wall upstand at level 01 (vii) reduction in size of loading bay rolling shutter (viii) reconfiguration of basement level layout (ix) reconfiguration of west core and riser layout (x) reconfiguration of reception and loading bay layout at ground floor level (xi) Provision of inward opening doors at ground floor level (xii) provision of an AOV, access hatch and smoke extract fan at roof level (xiii) reconfiguration of roof access ladder and stairs.
-
26/00370/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Climate Change Resilience Statement pursuant to 14 of Planning permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00500/PODC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Procurement Strategy (Demolition) pursuant to Schedule 3 Paragraph 2.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00501/PODC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Local Training, Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraph 3.2 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
-
26/00234/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Construction Management Plan pursuant to condition 19 Permission 25/00664/FULMAJ dated 23.12.2025.
-
26/00204/MDC Granted
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of a Drainage Statement and A Water Management Plan pursuant to Condition 12 of Planning permission ref: 25/00664/FULMAJ dated 23.12.2025.
Who's behind it
Company information only, from the register and Companies House
Newmark Gerald Eve LLP Agent, registered in London
Active · incorporated 2008 · London
161 applications on PlanIndex · across 17 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordST BRIDES DEVCO LTD Applicant, registered in London
Active · incorporated 2025 · London
17 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
176 documents on file for this application
- S106 COMPLETED
- FINAL DRAFT DEED OF AGREEMENT
- ADDENDUM TO DELEGATED REPORT
- PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
- ADDENDUM II TO DELEGATED REPORT FOR REF: 25/00664/FULMAJ
- REPRESENTATION - LUCY FRENCH
- REPRESENTATION - ST BRIDE FOUNDATION
- SBF RESPONSE II - NOV 2025
- COMMENTS - HISTORIC ENGLAND
- REPRESENTATION - HANNES GRIEBEL
- COMMENTS - THAMES WATER
- RESPONSE TO ST BRIDE?S FOUNDATION COMMENTS
- VIEW FROM SBH EASTERN TERRACERESPONSE TO SBF
- OVERLAID LEVEL FOUR PLAN WITH SBF RESPONSE TO SBF
- REPRESENTATION - ST BRIDE FOUNDATION
- BIODIVERSITY NET GAIN ASSESSMENT
- APPENDIX - LIGHTING VISUALS
- SUNKEN GARDEN GA
- EXISTING EAST ELEVATION - DEMOLITION
- EXISTING NORTH ELEVATION - DEMOLITION
- BASEMENT - SIXTH EXISTING DEMOLITION FLOOR PLAN
- EXISTING SECTION AA & BB DEMOLITION
- CLIMATE-BASED DAYLIGHT IMPACT ASSESSMENT
- HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- TRANSPORT STATEMENT ADDENDUM NOTE
- AIR QUALITY ASSESSMENT
- CIRCULAR ECONOMY STATEMENT
- ENERGY STATEMENT ADDENDUM
- WHOLE LIFE CARBON ASSESSMENT ADDENDUM
- LANDSCAPING ADDENDUM
- COVER LETTER
- DESIGN & ACCESS STATEMENT
- EXISTING AND PROPOSED AREA SCHEDULE
- EXISTING SOUTH ELEVATION - DEMOLITION
- EXISTING WEST ELEVATION - DEMOLITION
- EXISTING ELEVATION DEMOLITION
- PROPOSED ELEVATION DEMOLITION DRAWINGS
- GA PROPOSED PLANS
- DAYLIGHT & SUNLIGHT ADDENDUM - APPENDICES
- DAYLIGHT & SUNLIGHT ADDENDUM
- FIRE STATEMENT ADDENDUM
- FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE (SUDS) STRATEGY VALIDATION
- SUSTAINABILITY STATEMENT ADDENDUM
- CIL FORM
- PUBLIC REALM, DRAINAGE AND FIRST TO EIGHTH FLOOR LANDSCAPING PLANS
- COMMENTS - THAMES WATER
- COMMENTS - HISTORIC ENGLAND
- ENERGY STATEMENT
- GLA WLC ASSESSMENT SPREADSHEET
- CIRCULAR ECONOMY STATEMENT SPREADSHEET
- PART I 2021 GLA CARBON EMISSION REPORTING SPREADSHEET V2.0 WHOLE DEVELOPMENT
- APPLICATIONFORMREDACTED
- TERRACE MANAGEMENT PLAN
- CONSTRUCTION LOGISTICS PLAN
- CYCLING PROMOTION PLAN
- DELIVERY SERVICING AND WASTE MANAGEMENT PLAN
- TRANSPORT STATEMENT
- FIRE STATEMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
- NOISE IMPACT ASSESSMENT
- WHOLE LIFE CYCLE CARBON REPORT REV 01 PART 1
- WHOLE LIFE CYCLE CARBON REPORT REV 01 PART 2
- GLA WLC ASSESSMENT SPREADSHEET REV 01
- CIRCULAR ECONOMY STATEMENT SPREADSHEET V1.1
- PART I 2021 GLA CARBON EMISSION REPORTING SPREADSHEET V2.0 WHOLE DEVELOPMENT REV
- SUSTAINABILITY STATEMENT REV 01 PART 2
- SUSTAINABILITY STATEMENT REV 01 PART 3
- SUSTAINABILITY STATEMENT REV 01 PART 1
- BREEAM PRE-ASSESSMENT
- CIRCULAR ECONOMY STATEMENT
- AREA SCHEDULE EXISTING
- AREA SCHEDULE PROPOSED
- DESIGN AND ACCESS STATEMENT REV 01 PART 12
- DESIGN AND ACCESS STATEMENT REV 01 PART 13
- DESIGN AND ACCESS STATEMENT REV 01 PART 14
- DESIGN AND ACCESS STATEMENT REV 01 PART 15
- DESIGN AND ACCESS STATEMENT REV 01 PART 16
- DESIGN AND ACCESS STATEMENT REV 01 PART 3
- DESIGN AND ACCESS STATEMENT REV 01 PART 4
- DESIGN AND ACCESS STATEMENT REV 01 PART 5
- DESIGN AND ACCESS STATEMENT REV 01 PART 6
- DESIGN AND ACCESS STATEMENT REV 01 PART 7
- DESIGN AND ACCESS STATEMENT REV 01 PART 8
- DESIGN AND ACCESS STATEMENT REV 01 PART 9
- DESIGN AND ACCESS STATEMENT REV 01 PART 2
- DESIGN AND ACCESS STATEMENT REV 01 PART 17
- DESIGN AND ACCESS STATEMENT REV 01 PART 18
- DESIGN AND ACCESS STATEMENT REV 01 PART 19
- DESIGN AND ACCESS STATEMENT REV 01 PART 20
- DESIGN AND ACCESS STATEMENT REV 01 PART 21
- DESIGN AND ACCESS STATEMENT REV 01 PART 22
- DESIGN AND ACCESS STATEMENT REV 01 PART 23
- DESIGN AND ACCESS STATEMENT REV 01 PART 24
- DESIGN AND ACCESS STATEMENT REV 01 PART 25
- DESIGN AND ACCESS STATEMENT REV 01 PART 26
- DESIGN AND ACCESS STATEMENT REV 01 PART 1
- DESIGN AND ACCESS STATEMENT REV 01 PART 10
- DESIGN AND ACCESS STATEMENT REV 01 PART 11
- SITE LOCATION PLAN GF AND ABOVE REV P04
- SITE LOCATION PLAN LGF AND BELOW REV P02
- EXISTING GROUND FLOOR PLAN REV P03
- EXISTING LOWER GROUND FLOOR PLAN REV P03
- EXISTING ROOF FLOOR PLAN REV P03
- EXISTING SECOND FLOOR PLAN REV P03
- EXISTING SIXTH FLOOR PLAN REV P03
- EXISTING THIRD FLOOR PLAN REV P03
- EXISTING BASEMENT FLOOR PLAN REV P03
- EXISTING FIFTH FLOOR PLAN REV P03
- EXISTING FIRST FLOOR PLAN REV P03
- EXISTING FOURTH FLOOR PLAN REV P03
- EXISTING SECTION AA REV P03
- EXISTING SECTION BB REV P03
- EXISTING SOUTH ELEVATION REV P03
- EXISTING WEST ELEVATION REV 03
- EXISTING EAST ELEVATION REV P03
- EXISTING NORTH ELEVATION REV P03
- EXISTING FIRST FLOOR DEMOLITION PLAN REV P03
- EXISTING FOURTH FLOOR DEMOLITION PLAN REV P03
- EXISTING GROUND FLOOR DEMOLITION PLAN REV P03
- EXISTING LOWER GROUND FLOOR DEMOLITION PLAN REV P03
- EXISTING ROOF FLOOR DEMOLITION PLAN REV P03
- EXISTING SECOND FLOOR DEMOLITION PLAN REV P03
- EXISTING SIXTH FLOOR DEMOLITION PLAN REV P03
- EXISTING THIRD FLOOR DEMOLITION PLAN REV P03
- EXISTING BASEMENT FLOOR DEMOLITION PLAN REV P03
- EXISTING FIFTH FLOOR DEMOLITION PLAN REV P03
- EXISTING NORTH ELEVATION DEMOLITION REV P03
- EXISTING SECTION AA DEMOLITION REV P03
- EXISTING SECTION BB DEMOLITION REV P03
- EXISTING SOUTH ELEVATION DEMOLITION REV P03
- EXISTING WEST ELEVATION DEMOLITION REV P03
- EXISTING EAST ELEVATION DEMOLITION REV P03
- PROPOSED FOURTH FLOOR PLAN REV P03
- PROPOSED GROUND FLOOR PLAN REV P03
- PROPOSED LOWER GROUND FLOOR PLAN REV P03
- PROPOSED ROOF FLOOR PLAN REV P03
- PROPOSED SECOND FLOOR PLAN REV P03
- PROPOSED SEVENTH FLOOR PLAN REV P03
- PROPOSED SIXTH FLOOR PLAN REV P03
- PROPOSED THIRD FLOOR PLAN REV P03
- PROPOSED BASEMENT FLOOR PLAN REV P03
- PROPOSED EIGHT FLOOR PLAN REV P03
- PROPOSED FIFTH FLOOR PLAN REV P03
- PROPOSED FIRST FLOOR PLAN REV P03
- PROPOSED SECTION AA REV P03
- PROPOSED SECTION BB REV P03
- PROPOSED SECTION DD REV P03
- PROPOSED SOUTH ELEVATION REV P03
- PROPOSED WEST ELEVATION REV P03
- PROPOSED EAST ELEVATION REV P03
- PROPOSED NORTH ELEVATION REV P03
- PROPOSED PASSAGE AND LIGHTWELL ELEVATIONS REV P03
- PROPOSED THIRD FLOOR LANDSCAPING PLAN
- PROPOSED EIGHT FLOOR LANDSCAPING PLAN
- PROPOSED FIFTH FLOOR LANDSCAPING PLAN
- PROPOSED FIRST FLOOR LANDSCAPING PLAN
- PROPOSED FOURTH FLOOR LANDSCAPING PLAN
- PROPOSED LOWER GROUND FLOOR LANDSCAPING PLAN
- PROPOSED PUBLIC REALM LANDSCAPING PLAN
- PROPOSED SECOND FLOOR LANDSCAPING PLAN
- PROPOSED SEVENTH FLOOR LANDSCAPING PLAN
- PROPOSED SIXTH FLOOR LANDSCAPING PLAN
- DESK BASED ARCHAEOLOGICAL ASSESSMENT
- FRA AND SUDS REPORT REV 01 PART 1
- FRA AND SUDS REPORT REV 01 PART 2
- 250514 - LIGHT POLLUTION ASSESSMENT
- TOWN PLANNING STATEMENT
- DAYLIGHT AND SUNLIGHT REPORT
- DAYLIGHT AND SUNLIGHT REPORT - APPENDICIES
- COVERING LETTER
- CIL FORM 1
- AIR QUALITY ASSESSMENT
- HERTIAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REV 01 PART 01
- HERTIAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REV 01 PART 02
- HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REV 01 PART 03
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 23 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of photographic site condition survey pursuant to condition 18 of planning permission 25/00664/FULMAJ dated 23.12.2025.
Granted Conditions 5 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
99% historically approved · decision due ~30 Jul
Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
Awaiting decision 2 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of the Highways Schedule of Condition Survey pursuant to Schedule 3 Paragraph 6.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).
Granted 3 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of written scheme of investigation pursuant to condition 11(c) of Planning Permission 25/00664/FULMAJ dated 23.12.2025.
Granted Conditions 6 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of details of Construction Management Plan pursuant to condition 19 Permission 25/00664/FULMAJ dated 23.12.2025.
Granted Conditions 3 docs -
St Brides House 10 Salisbury Square London EC4Y 8EH
Submission of Scheme of Protective Works Management Plan pursuant to discharge of condition 2 of planning permission 21/00783/FULL dated 22.12.2022.
Granted Conditions 5 docs
Other full applications
In City of London
-
25/01794/FULL Granted
50 Cannon Street London EC4N 6JJ
Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.
-
26/00865/FULL Granted
9 Newbury Street London EC1A 7HU
Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.
-
26/01110/FULL Granted
200 Aldersgate Street London EC1A 4HD
Retrospective application for the installation of 2no. condenser units to fifth floor roof.
-
26/01109/FULL Granted
100 Bishopsgate London EC2N 4AA
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
-
26/01053/FULL Granted
49 Cheapside London EC2V 6AT
Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass