Skip to content
PlanIndex Get alerts
Menu

Planning application

St Brides House 10 Salisbury Square London EC4Y 8EH

Granted City of London 25/00664/FULMAJ Full Major Application

Works: Extension Roofing Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Refurbishment and extension of the existing building including: (i) Demolition of existing 6th floor (roof) level; (ii) Two storey extension at floor 6 and 7; and infill extensions at ground floor, fourth, and fifth floors, to provide additional office space (Class E use); (iv) Creation of new facade at floor 5; (v) Creation of new roof terrace on floor 7, including new plant on roof, at floor 8; (iv) Works to the public realm at St Bride's Passage; and other associated works.

As published by the council, reference 25/00664/FULMAJ

Application record

Reference
25/00664/FULMAJ
Type
Full Major Application
Status
Decided
Decision
Granted As published: Approved
Received
19 May 2025
Validated
19 May 2025
Decided
23 Dec 2025
Ward
Castle Baynard
Decision by
Delegated
Postcode
EC4Y 8EH

Site history

Applications at this address on the City of London register

This site has had 26 applications since 2025: 23 approved, 0 refused.

  • 26/01401/MDC Awaiting decision

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of design document pursuant to condition 27(b) 1:10 detailed drawings of the existing and proposed windows; (c) irrespective of approved drawings, typical facade details, of agreed sections of the facades, including reference to materials, finishes, lighting; (e) irrespective of approved drawings, details of plant screening at roof level; (g) details of walls, railings, balustrades, ramps, gates, screens, handrails etc, bounding or within the site; and (j) details of service vehicle, fire escape and cycle store entrances of planning permission 25/00664/FULMAJ dated 23.12.2025.

    Submitted 5 Oct 2026
  • 26/01041/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Ecological Management Plan pursuant to condition 37 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 14 Aug 2026
  • 26/00888/PODC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of the Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.3-2.1.4 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Decided 23 Jul 2026
  • 26/00889/PODC Awaiting decision

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Submitted 22 Jun 2026
  • 26/00795/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Design document pursuant to condition 15 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 14 Aug 2026
  • 26/00807/PODC Awaiting decision

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Submitted 29 May 2026
  • 26/00681/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of written scheme of investigation pursuant to condition 11(c) of Planning Permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 22 May 2026 Conditions
  • 26/00532/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Circular Economy Statement pursuant to condition 29(b) of Planning permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 18 May 2026 Conditions
  • 26/00533/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Whole Life Cycle Carbon Emissions Report pursuant to condition 31 of Planning permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 18 May 2026 Conditions
  • 26/00512/NMA Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to vary Condition 39 (Approved Drawings) of planning permission ref: 25/00664/FULMAJ dated 23.12.2025, to accommodate design amendments, namely: (i) column strengthening within St Bride's Passage (ii) retention and alterations to balustrades at ground floor level (iii) provision of metal balustrades at levels 01 to 05 (iv) provision of safety line system and foldable guardrail at roof level (v) extension of static walkway balustrades at roof level (vi) retention of external wall upstand at level 01 (vii) reduction in size of loading bay rolling shutter (viii) reconfiguration of basement level layout (ix) reconfiguration of west core and riser layout (x) reconfiguration of reception and loading bay layout at ground floor level (xi) Provision of inward opening doors at ground floor level (xii) provision of an AOV, access hatch and smoke extract fan at roof level (xiii) reconfiguration of roof access ladder and stairs.

    Decided 12 Jun 2026 Amendments

Timeline

Dates from the published record

  1. 19 May 2025

    Received by City of London

  2. 23 Dec 2025

    Decision issued: Approved

  3. 7 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

15+ later applications on the register refer to this one:

  • 26/01401/MDC Awaiting decision

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of design document pursuant to condition 27(b) 1:10 detailed drawings of the existing and proposed windows; (c) irrespective of approved drawings, typical facade details, of agreed sections of the facades, including reference to materials, finishes, lighting; (e) irrespective of approved drawings, details of plant screening at roof level; (g) details of walls, railings, balustrades, ramps, gates, screens, handrails etc, bounding or within the site; and (j) details of service vehicle, fire escape and cycle store entrances of planning permission 25/00664/FULMAJ dated 23.12.2025.

    Submitted 5 Oct 2026
  • 26/01041/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Ecological Management Plan pursuant to condition 37 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 14 Aug 2026
  • 26/00888/PODC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of the Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.3-2.1.4 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Decided 23 Jul 2026
  • 26/00889/PODC Awaiting decision

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Submitted 22 Jun 2026
  • 26/00795/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Design document pursuant to condition 15 of Planning Permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 14 Aug 2026
  • 26/00807/PODC Awaiting decision

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Submitted 29 May 2026
  • 26/00681/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of written scheme of investigation pursuant to condition 11(c) of Planning Permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 22 May 2026 Conditions
  • 26/00532/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Circular Economy Statement pursuant to condition 29(b) of Planning permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 18 May 2026 Conditions
  • 26/00533/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Whole Life Cycle Carbon Emissions Report pursuant to condition 31 of Planning permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 18 May 2026 Conditions
  • 26/00512/NMA Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to vary Condition 39 (Approved Drawings) of planning permission ref: 25/00664/FULMAJ dated 23.12.2025, to accommodate design amendments, namely: (i) column strengthening within St Bride's Passage (ii) retention and alterations to balustrades at ground floor level (iii) provision of metal balustrades at levels 01 to 05 (iv) provision of safety line system and foldable guardrail at roof level (v) extension of static walkway balustrades at roof level (vi) retention of external wall upstand at level 01 (vii) reduction in size of loading bay rolling shutter (viii) reconfiguration of basement level layout (ix) reconfiguration of west core and riser layout (x) reconfiguration of reception and loading bay layout at ground floor level (xi) Provision of inward opening doors at ground floor level (xii) provision of an AOV, access hatch and smoke extract fan at roof level (xiii) reconfiguration of roof access ladder and stairs.

    Decided 12 Jun 2026 Amendments
  • 26/00370/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Climate Change Resilience Statement pursuant to 14 of Planning permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 6 May 2026 Conditions
  • 26/00500/PODC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of the Local Procurement Strategy (Demolition) pursuant to Schedule 3 Paragraph 2.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Decided 12 May 2026
  • 26/00501/PODC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of the Local Training, Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraph 3.2 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Decided 12 May 2026
  • 26/00234/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of Construction Management Plan pursuant to condition 19 Permission 25/00664/FULMAJ dated 23.12.2025.

    Decided 16 Mar 2026 Conditions
  • 26/00204/MDC Granted

    St Brides House 10 Salisbury Square London EC4Y 8EH

    Submission of details of a Drainage Statement and A Water Management Plan pursuant to Condition 12 of Planning permission ref: 25/00664/FULMAJ dated 23.12.2025.

    Decided 15 Apr 2026 Conditions

Who's behind it

Company information only, from the register and Companies House

Newmark Gerald Eve LLP Agent, registered in London

Active · incorporated 2008 · London

161 applications on PlanIndex · across 17 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

ST BRIDES DEVCO LTD Applicant, registered in London

Active · incorporated 2025 · London

17 applications on PlanIndex · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

176 documents on file for this application

  • S106 COMPLETED S106 Agreement · 23 Jan 2026
  • FINAL DRAFT DEED OF AGREEMENT S106 Agreement · 23 Dec 2025
  • ADDENDUM TO DELEGATED REPORT Accompanying report · 23 Dec 2025
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 23 Dec 2025
  • ADDENDUM II TO DELEGATED REPORT FOR REF: 25/00664/FULMAJ Accompanying report · 23 Dec 2025
  • REPRESENTATION - LUCY FRENCH Public Comment · 12 Dec 2025
  • REPRESENTATION - ST BRIDE FOUNDATION Public Comment · 24 Nov 2025
  • SBF RESPONSE II - NOV 2025 Public Comment · 24 Nov 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 02 Oct 2025
  • REPRESENTATION - HANNES GRIEBEL Public Comment · 23 Sep 2025
  • COMMENTS - THAMES WATER Consultee Comment · 23 Sep 2025
  • RESPONSE TO ST BRIDE?S FOUNDATION COMMENTS Other · 10 Sep 2025
  • VIEW FROM SBH EASTERN TERRACERESPONSE TO SBF Other · 10 Sep 2025
  • OVERLAID LEVEL FOUR PLAN WITH SBF RESPONSE TO SBF Other · 10 Sep 2025
  • REPRESENTATION - ST BRIDE FOUNDATION Public Comment · 27 Aug 2025
  • BIODIVERSITY NET GAIN ASSESSMENT Accompanying report · 15 Aug 2025
  • APPENDIX - LIGHTING VISUALS Other · 15 Aug 2025
  • SUNKEN GARDEN GA Drawing · 15 Aug 2025
  • EXISTING EAST ELEVATION - DEMOLITION Drawing · 04 Aug 2025
  • EXISTING NORTH ELEVATION - DEMOLITION Drawing · 04 Aug 2025
  • BASEMENT - SIXTH EXISTING DEMOLITION FLOOR PLAN Drawing · 04 Aug 2025
  • EXISTING SECTION AA & BB DEMOLITION Drawing · 04 Aug 2025
  • CLIMATE-BASED DAYLIGHT IMPACT ASSESSMENT Accompanying report · 04 Aug 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 04 Aug 2025
  • TRANSPORT STATEMENT ADDENDUM NOTE Accompanying report · 04 Aug 2025
  • AIR QUALITY ASSESSMENT Accompanying report · 04 Aug 2025
  • CIRCULAR ECONOMY STATEMENT Accompanying report · 04 Aug 2025
  • ENERGY STATEMENT ADDENDUM Accompanying report · 04 Aug 2025
  • WHOLE LIFE CARBON ASSESSMENT ADDENDUM Accompanying report · 04 Aug 2025
  • LANDSCAPING ADDENDUM Accompanying report · 04 Aug 2025
  • COVER LETTER Cover Letter · 04 Aug 2025
  • DESIGN & ACCESS STATEMENT Accompanying report · 04 Aug 2025
  • EXISTING AND PROPOSED AREA SCHEDULE Other · 04 Aug 2025
  • EXISTING SOUTH ELEVATION - DEMOLITION Drawing · 04 Aug 2025
  • EXISTING WEST ELEVATION - DEMOLITION Drawing · 04 Aug 2025
  • EXISTING ELEVATION DEMOLITION Drawing · 04 Aug 2025
  • PROPOSED ELEVATION DEMOLITION DRAWINGS Drawing · 04 Aug 2025
  • GA PROPOSED PLANS Drawing · 04 Aug 2025
  • DAYLIGHT & SUNLIGHT ADDENDUM - APPENDICES Report - Daylight/Sunlight Report · 04 Aug 2025
  • DAYLIGHT & SUNLIGHT ADDENDUM Report - Daylight/Sunlight Report · 04 Aug 2025
  • FIRE STATEMENT ADDENDUM Accompanying report · 04 Aug 2025
  • FLOOD RISK ASSESSMENT AND SUSTAINABLE DRAINAGE (SUDS) STRATEGY VALIDATION Accompanying report · 04 Aug 2025
  • SUSTAINABILITY STATEMENT ADDENDUM Accompanying report · 04 Aug 2025
  • CIL FORM Other · 04 Aug 2025
  • PUBLIC REALM, DRAINAGE AND FIRST TO EIGHTH FLOOR LANDSCAPING PLANS Drawing · 04 Aug 2025
  • COMMENTS - THAMES WATER Consultee Comment · 30 Jun 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 27 Jun 2025
  • ENERGY STATEMENT Accompanying report · 13 Jun 2025
  • GLA WLC ASSESSMENT SPREADSHEET Other · 20 May 2025
  • CIRCULAR ECONOMY STATEMENT SPREADSHEET Other · 20 May 2025
  • PART I 2021 GLA CARBON EMISSION REPORTING SPREADSHEET V2.0 WHOLE DEVELOPMENT Other · 20 May 2025
  • APPLICATIONFORMREDACTED Application Form · 19 May 2025
  • TERRACE MANAGEMENT PLAN Other · 19 May 2025
  • CONSTRUCTION LOGISTICS PLAN Other · 19 May 2025
  • CYCLING PROMOTION PLAN Report - Travel Plan · 19 May 2025
  • DELIVERY SERVICING AND WASTE MANAGEMENT PLAN Accompanying report · 19 May 2025
  • TRANSPORT STATEMENT Report - Transport Statement/Report · 19 May 2025
  • FIRE STATEMENT Accompanying report · 19 May 2025
  • BIODIVERSITY NET GAIN ASSESSMENT Other · 19 May 2025
  • PRELIMINARY ECOLOGICAL APPRAISAL Accompanying report · 19 May 2025
  • NOISE IMPACT ASSESSMENT Report - Acoustic/Noise Report · 19 May 2025
  • WHOLE LIFE CYCLE CARBON REPORT REV 01 PART 1 Accompanying report · 19 May 2025
  • WHOLE LIFE CYCLE CARBON REPORT REV 01 PART 2 Accompanying report · 19 May 2025
  • GLA WLC ASSESSMENT SPREADSHEET REV 01 Other · 19 May 2025
  • CIRCULAR ECONOMY STATEMENT SPREADSHEET V1.1 Other · 19 May 2025
  • PART I 2021 GLA CARBON EMISSION REPORTING SPREADSHEET V2.0 WHOLE DEVELOPMENT REV Other · 19 May 2025
  • SUSTAINABILITY STATEMENT REV 01 PART 2 Accompanying report · 19 May 2025
  • SUSTAINABILITY STATEMENT REV 01 PART 3 Accompanying report · 19 May 2025
  • SUSTAINABILITY STATEMENT REV 01 PART 1 Accompanying report · 19 May 2025
  • BREEAM PRE-ASSESSMENT Other · 19 May 2025
  • CIRCULAR ECONOMY STATEMENT Other · 19 May 2025
  • AREA SCHEDULE EXISTING Other · 19 May 2025
  • AREA SCHEDULE PROPOSED Other · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 12 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 13 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 14 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 15 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 16 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 3 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 4 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 5 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 6 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 7 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 8 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 9 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 2 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 17 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 18 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 19 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 20 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 21 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 22 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 23 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 24 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 25 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 26 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 1 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 10 Report - Design & Access Statement/Report · 19 May 2025
  • DESIGN AND ACCESS STATEMENT REV 01 PART 11 Report - Design & Access Statement/Report · 19 May 2025
  • SITE LOCATION PLAN GF AND ABOVE REV P04 Site Plan · 19 May 2025
  • SITE LOCATION PLAN LGF AND BELOW REV P02 Site Plan · 19 May 2025
  • EXISTING GROUND FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING LOWER GROUND FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING ROOF FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING SECOND FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING SIXTH FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING THIRD FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING BASEMENT FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING FIFTH FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING FIRST FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING FOURTH FLOOR PLAN REV P03 Drawing · 19 May 2025
  • EXISTING SECTION AA REV P03 Drawing · 19 May 2025
  • EXISTING SECTION BB REV P03 Drawing · 19 May 2025
  • EXISTING SOUTH ELEVATION REV P03 Drawing · 19 May 2025
  • EXISTING WEST ELEVATION REV 03 Drawing · 19 May 2025
  • EXISTING EAST ELEVATION REV P03 Drawing · 19 May 2025
  • EXISTING NORTH ELEVATION REV P03 Drawing · 19 May 2025
  • EXISTING FIRST FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING FOURTH FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING GROUND FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING LOWER GROUND FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING ROOF FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING SECOND FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING SIXTH FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING THIRD FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING BASEMENT FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING FIFTH FLOOR DEMOLITION PLAN REV P03 Drawing · 19 May 2025
  • EXISTING NORTH ELEVATION DEMOLITION REV P03 Drawing · 19 May 2025
  • EXISTING SECTION AA DEMOLITION REV P03 Drawing · 19 May 2025
  • EXISTING SECTION BB DEMOLITION REV P03 Drawing · 19 May 2025
  • EXISTING SOUTH ELEVATION DEMOLITION REV P03 Drawing · 19 May 2025
  • EXISTING WEST ELEVATION DEMOLITION REV P03 Drawing · 19 May 2025
  • EXISTING EAST ELEVATION DEMOLITION REV P03 Drawing · 19 May 2025
  • PROPOSED FOURTH FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED GROUND FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED LOWER GROUND FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED ROOF FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED SECOND FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED SEVENTH FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED SIXTH FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED THIRD FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED BASEMENT FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED EIGHT FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED FIFTH FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED FIRST FLOOR PLAN REV P03 Drawing · 19 May 2025
  • PROPOSED SECTION AA REV P03 Drawing · 19 May 2025
  • PROPOSED SECTION BB REV P03 Drawing · 19 May 2025
  • PROPOSED SECTION DD REV P03 Drawing · 19 May 2025
  • PROPOSED SOUTH ELEVATION REV P03 Drawing · 19 May 2025
  • PROPOSED WEST ELEVATION REV P03 Drawing · 19 May 2025
  • PROPOSED EAST ELEVATION REV P03 Drawing · 19 May 2025
  • PROPOSED NORTH ELEVATION REV P03 Drawing · 19 May 2025
  • PROPOSED PASSAGE AND LIGHTWELL ELEVATIONS REV P03 Drawing · 19 May 2025
  • PROPOSED THIRD FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED EIGHT FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED FIFTH FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED FIRST FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED FOURTH FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED LOWER GROUND FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED PUBLIC REALM LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED SECOND FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED SEVENTH FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • PROPOSED SIXTH FLOOR LANDSCAPING PLAN Drawing · 19 May 2025
  • DESK BASED ARCHAEOLOGICAL ASSESSMENT Accompanying report · 19 May 2025
  • FRA AND SUDS REPORT REV 01 PART 1 Accompanying report · 19 May 2025
  • FRA AND SUDS REPORT REV 01 PART 2 Accompanying report · 19 May 2025
  • 250514 - LIGHT POLLUTION ASSESSMENT Accompanying report · 19 May 2025
  • TOWN PLANNING STATEMENT Report - Planning Statement/Report · 19 May 2025
  • DAYLIGHT AND SUNLIGHT REPORT Report - Daylight/Sunlight Report · 19 May 2025
  • DAYLIGHT AND SUNLIGHT REPORT - APPENDICIES Report - Daylight/Sunlight Report · 19 May 2025
  • COVERING LETTER Cover Letter · 19 May 2025
  • CIL FORM 1 Other · 19 May 2025
  • AIR QUALITY ASSESSMENT Accompanying report · 19 May 2025
  • HERTIAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REV 01 PART 01 Accompanying report · 19 May 2025
  • HERTIAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REV 01 PART 02 Accompanying report · 19 May 2025
  • HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REV 01 PART 03 Accompanying report · 19 May 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 23 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • St Brides House 10 Salisbury Square London EC4Y 8EH

    26/00101/MDC Submitted 22 Jan 2026 50 yards away

    Submission of details of photographic site condition survey pursuant to condition 18 of planning permission 25/00664/FULMAJ dated 23.12.2025.

    Granted Conditions 5 docs
  • St Brides House 10 Salisbury Square London EC4Y 8EH

    26/00807/PODC Submitted 29 May 2026 50 yards away

    99% historically approved · decision due ~30 Jul

    Submission of details of the utilities connection requirements pursuant to Schedule 3 Paragraph 11.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Awaiting decision 2 docs
  • St Brides House 10 Salisbury Square London EC4Y 8EH

    26/00121/PODC Submitted 20 Jan 2026 50 yards away

    Submission of the Highways Schedule of Condition Survey pursuant to Schedule 3 Paragraph 6.1 of the S106 Agreement dated 23rd December 2025 (Planning Application Reference: 25/00664/FULMAJ).

    Granted 3 docs
  • St Brides House 10 Salisbury Square London EC4Y 8EH

    26/00681/MDC Submitted 12 May 2026 50 yards away

    Submission of details of written scheme of investigation pursuant to condition 11(c) of Planning Permission 25/00664/FULMAJ dated 23.12.2025.

    Granted Conditions 6 docs
  • St Brides House 10 Salisbury Square London EC4Y 8EH

    26/00234/MDC Submitted 13 Feb 2026 50 yards away

    Submission of details of Construction Management Plan pursuant to condition 19 Permission 25/00664/FULMAJ dated 23.12.2025.

    Granted Conditions 3 docs
  • St Brides House 10 Salisbury Square London EC4Y 8EH

    25/01208/MDC Submitted 3 Sep 2025 50 yards away

    Submission of Scheme of Protective Works Management Plan pursuant to discharge of condition 2 of planning permission 21/00783/FULL dated 22.12.2022.

    Granted Conditions 5 docs

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications