Planning application
47-50 Mark Lane London EC3R 5AS
Relates to 24/01044/FULL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of an update to the approved Whole Life-Cycle Carbon assessment to reaffirm the proposed strategy or demonstrate improvements pursuant to condition 8 of planning permission 24/01044/FULL dated 25/03/2025.
As published by the council, reference 25/01809/MDC
Application record
- Reference
- 25/01809/MDC
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 24 Dec 2025
- Validated
- 24 Dec 2025
- Decided
- 19 Oct 2026
- Ward
- Tower
- Decision by
- Delegated
- Postcode
- EC3R 5AS
Site history
Applications at this address on the City of London register
This site has had 32 applications since 2024: 21 approved, 0 refused.
-
26/01518/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of Above Ground Monitoring Report, Desk Study & Ground Investigation and Supplementary Ground Investigation pursuant to condition 21 of planning permission 24/01044/FULL dated 25.03.2025.
-
26/01445/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of Ground Movement Assessment and Substructure Method Statement pursuant to discharge of condition 18 of planning permission 24/01044/FULL dated 25.03.2025.
-
26/01443/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of Preliminary Risk Assessment Report pursuant to discharge of condition 20 of planning permission 24/01044/FULL dated 25.03.2025.
-
26/01400/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of details of Site Inspection Survey pursuant to condition 34 of Planning Permission 24/01044/FULL dated 25.03.2025.
-
26/01311/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of Drainage and Flood Plan Part 1 & 2 and Construction Phase Flood Risk & Water Management Plan pursuant to condition 14 of planning permission 24/01044/FULL dated 25.03.2025.
-
26/01282/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of Drainage Plan pursuant to Condition 13 of planning permission 24/01044/FULL dated 25.03.2025.
-
26/01158/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of details of Climate Resilience pursuant to condition 9 of Planning Permission 24/01044/FULL dated 25.03.2025.
-
26/01153/PODC Granted
47-50 Mark Lane London EC3R 5AS
Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 and Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).
-
26/01152/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of details of Scheme of Protective Works pursuant to condition 4 of Planning Permission 24/01044/FULL dated 25.03.2025.
-
26/01137/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of details of Piling Methods Statement pursuant to condition 12 of Planning Permission 24/01044/FULL dated 25.03.2025.
Timeline
Dates from the published record
-
24 Dec 2025
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
19 Oct 2026
Decision issued: Approved
-
19 Oct 2026
Status changed to Decided
Previously Under Consideration.
Related applications
Cases linked to this one on the register
-
24/01044/FULL Granted
47-50 Mark Lane London EC3R 5AS
Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the variation of Conditions 53 (Fire Statement), 61 (Cycle Parking), 63 (Cycle Facilities), 73 (Use class floorspace) and 74 (Approved Drawings) of planning permission reference 22/01245/FULMAJ dated 20 September 2023, as amended by 24/00941/NMA on 20 September 2024 to allow the following amendments: i) Re-configuration of proposed massing; ii) Height of Block E located at rear of the Site increased by one storey; iii) Minor internal re-configuration of ground floor uses; iv) Refinement of facade to rear block (Block E); v) Improvements to cultural offer and public access provisions
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
- WHOLE LIFE-CYCLE CARBON ASSESSMENT UPDATE
- COVER LETTER
- WLCA ASSESSMENT TEMPLATE
- APPLICATIONFORMREDACTED
- PRE DEMOLITION AUDIT REPORT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 19 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~30 Nov
Submission of details of Site Inspection Survey pursuant to condition 34 of Planning Permission 24/01044/FULL dated 25.03.2025.
Awaiting decision -
47-50 Mark Lane London EC3R 5AS
Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 7 of planning permission 24/01044/FULL dated 25/03/2025.
Granted 9 docs -
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~21 Dec
Submission of Above Ground Monitoring Report, Desk Study & Ground Investigation and Supplementary Ground Investigation pursuant to condition 21 of planning permission 24/01044/FULL dated 25.03.2025.
Awaiting decision -
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~7 Dec
Submission of Ground Movement Assessment and Substructure Method Statement pursuant to discharge of condition 18 of planning permission 24/01044/FULL dated 25.03.2025.
Awaiting decision -
47-50 Mark Lane London EC3R 5AS
Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 and Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).
Granted 4 docs -
47-50 Mark Lane London EC3R 5AS
99% historically approved · decision due ~8 Dec
Submission of Preliminary Risk Assessment Report pursuant to discharge of condition 20 of planning permission 24/01044/FULL dated 25.03.2025.
Awaiting decision