Skip to content
PlanIndex Get alerts
Menu

Planning application

99 Gresham Street London EC2V 7NG

Granted City of London 25/01805/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retrospective planning application for replacement of three condenser units at roof level with two air conditioning condenser units and the associated repositioning of one unit.

As published by the council, reference 25/01805/FULL

Application record

Reference
25/01805/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
23 Dec 2025
Validated
23 Dec 2025
Decided
16 Mar 2026
Ward
Coleman Street
Decision by
Delegated
Postcode
EC2V 7NG

Site history

Applications at this address on the City of London register

This site has had 5 applications since 2025: 4 approved, 0 refused.

  • 26/01275/MDC Decided

    99 Gresham Street London EC2V 7NG

    Submission of details of Noise Assessment pursuant to condition 2 of Planning Permission 25/01805/FULL dated 16.03.2026.

    Submitted 14 Sep 2026
  • 26/01209/MDC Granted

    99 Gresham Street London EC2V 7NG

    Submission of Acoustic Technical Note pursuant to condition 3 of planning permission 26/00435/FULL dated 07.07.2026.

    Decided 13 Oct 2026
  • 26/01210/MDC Granted

    99 Gresham Street London EC2V 7NG

    Submission of mitigation measures of noise and vibration from mechanical systems or other plant pursuant to condition 4 of planning permission 26/00435/FULL dated 07.07.2026.

    Decided 7 Oct 2026
  • 26/00435/FULL Granted

    99 Gresham Street London EC2V 7NG

    Installation of six condenser units at roof level: (i) two No. units on southern side and (ii) four No. units on northern side.

    Decided 7 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 23 Dec 2025

    Received by City of London

  2. 16 Mar 2026

    Decision issued: Approved

  3. 24 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/01275/MDC Decided

    99 Gresham Street London EC2V 7NG

    Submission of details of Noise Assessment pursuant to condition 2 of Planning Permission 25/01805/FULL dated 16.03.2026.

    Submitted 14 Sep 2026

Who's behind it

Company information only, from the register and Companies House

CarneySweeney Ltd Agent, registered in Farnham

Active · incorporated 2019 · Farnham

591 applications on PlanIndex · across 108 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Echospace Limited Applicant

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 16 Mar 2026
  • COMMENTS - CITY OF LONDON CONSERVATION AREA ADVISORY COMMITTEE Consultee Comment · 18 Feb 2026
  • COMMENTS - TRANSPORT Consultee Comment · 14 Jan 2026
  • APPLICATIONFORMREDACTED Application Form · 23 Dec 2025
  • ROOF PLAN Drawing · 23 Dec 2025
  • AS-PROPOSED - SITE PLAN A3.1 Drawing · 23 Dec 2025
  • SITE LOCATION PLAN A3 Site Plan · 23 Dec 2025
  • AS-EXISTING - SITE PLAN A3.1 Drawing · 23 Dec 2025
  • SECTION EXISTING Drawing · 23 Dec 2025
  • DD-SECTION PROPOSED Drawing · 23 Dec 2025
  • DATABOOK - OLD UNIT SPECIFICATION Other · 23 Dec 2025
  • PROP UNIT SPECIFICATION Other · 23 Dec 2025
  • COVER LETTER Cover Letter · 23 Dec 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 16 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 36 Coleman Street London EC2R 5EH

    26/00474/NMA Submitted 31 Mar 2026 50 yards away

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 to vary Condition 4 (Flue Termination) of planning permission reference 25/00234/FULL dated 11.04.2025, to revise it to a condition requiring compliance with the provided details.

    Granted Amendments 14 docs
  • 99 Gresham Street London EC2V 7NG

    26/00435/FULL Submitted 26 Mar 2026 50 yards away

    Installation of six condenser units at roof level: (i) two No. units on southern side and (ii) four No. units on northern side.

    Granted Full applications 13 docs
  • 99 Gresham Street London EC2V 7NG

    26/01275/MDC Submitted 14 Sep 2026 50 yards away

    99% historically approved · decision due ~9 Nov

    Submission of details of Noise Assessment pursuant to condition 2 of Planning Permission 25/01805/FULL dated 16.03.2026.

    Decided 3 docs
  • 99 Gresham Street London EC2V 7NG

    26/01209/MDC Submitted 25 Aug 2026 50 yards away

    Submission of Acoustic Technical Note pursuant to condition 3 of planning permission 26/00435/FULL dated 07.07.2026.

    Granted 3 docs
  • 99 Gresham Street London EC2V 7NG

    26/01210/MDC Submitted 25 Aug 2026 50 yards away

    Submission of mitigation measures of noise and vibration from mechanical systems or other plant pursuant to condition 4 of planning permission 26/00435/FULL dated 07.07.2026.

    Granted 3 docs
  • 36 Coleman Street London EC2R 5EH

    25/00234/FULL Submitted 14 Feb 2025 50 yards away

    Alteration to shopfront to replace existing glazed panels with metal louvres

    Granted Full applications Windows or glazing 6 docs

In City of London

  • 26/01083/FULL Granted

    Offices Chapter House St Paul's Churchyard London EC4M 8AD

    Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).

    Received 29 Jul, published by the council 19 Aug 2026 Full applications
  • 26/01051/FULL Granted

    55 Mark Lane London EC3R 7NE

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.

    Received 27 Jul, published by the council 9 Aug 2026 Full applications
  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications