Planning application
25/01255/FULL
Bishopsgate Institute 230 Bishopsgate London EC2M 4QH
Proposal
Installation of mechanical plant at roof level and removal of gas boiler system
As published by the council, reference 25/01255/FULL
Timeline
Dates from the published record
-
11 Sep 2025
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/01256/LBC Awaiting decision
Bishopsgate Institute 230 Bishopsgate London EC2M 4QH
Installation of mechanical plant at roof level and removal of gas boiler system with associated internal alterations
-
PA/25/01693/NC Granted
Bishopsgate Institute 230 Bishopsgate London EC2M 4QH
Observation requested by City of London Council for 'Installation of mechanical plant at roof level and removal of gas boiler system'
-
PA/26/00674/NC Granted
Bishopsgate Institute, 230 Bishopsgate, London, EC2M 4QH
Observation requested by City of London for installation of mechanical plant at roof level and removal of gas boiler system.
-
21/00221/MDC Granted
222 Bishopsgate London EC2M 4QD
Submission of details of a scheme for mechanical plant is used on the premises to be mounted in a way which will minimise transmission of structure borne sound or vibration to any other part of the building pursuant to condition 5 of planning permission dated 7th July 2020 (20/00081/FULL).
-
21/00380/MDC Granted
222 Bishopsgate London EC2M 4QD
Submission of a Servicing and Delivery Plan pursuant to condition 4 of planning permission dated 7th July 2020 (20/00081/FULL).
-
26/00260/FULL Granted
120 Middlesex Street London E1 7HY
Replacement of existing entrance door with new powder coated aluminium door with timber handle.
Other full applications applications
In City of London
-
26/01052/FULL Awaiting decision
55 Mark Lane London EC3R 7NE
Installation of new air condenser units and new railing at the south east part of the flat roof and associated works.
-
26/00826/FULL Granted
88 Wood Street London EC2V 7DA
Installation of a double set of doors to be formed within the existing glazed curtain wall at Level 12 roof terrace.
-
26/00797/FULL Granted
1 London Wall Place London EC2Y 5AU
Installation of three metal mechanical louvred ventilation panels at upper ground level in the Fore Street elevation of 1 London Wall Place.
-
26/00113/FULL Granted
Salters Hall Gardens St Alphage Garden London EC2
Landscaping comprising (i) replacing of soft landscaping (12sqm of lawn and 26sqm of planting bed) with 38sqm of paving; (ii) Replacement of 41sqm of gravel surface with soft landscaped area comprising high quality diverse pollinator friendly planting; (iii) Provision of 48m linear of new hedgerow.
-
26/00573/FULL Granted
International Financial Centre 25 Old Broad Street London EC2N 1HQ
Installation of a canopy to the eastern elevation of the building.