Skip to content
PlanIndex Get alerts
Menu

Planning application

Offices Morley House 26 - 30 Holborn Viaduct London EC1A 2AT

Granted City of London 25/00970/FULMAJ Full Major Application

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of the existing building, partial retention of the existing basement and the erection of a lower ground, mezzanine, ground plus 11 storey building for hotel (Class C1) use, provision of substation, blue badge car and cycle parking, ancillary uses, servicing, rooftop plant and other back of house space, enabling works and other works associated with the development.

As published by the council, reference 25/00970/FULMAJ

Application record

Reference
25/00970/FULMAJ
Type
Full Major Application
Status
Decided
Decision
Approved
Received
22 Jul 2025
Validated
11 Aug 2025
Decided
18 Jun 2026
Ward
Farringdon Within
Decision by
Delegated Decision
Postcode
EC1A 2AT

Timeline

Dates from the published record

  1. 22 Jul 2025

    Received by City of London

  2. 11 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 18 Jun 2026

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

2,025 applications on PlanIndex · across 33 councils · 98% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

148 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Morley House 26 - 30 Holborn Viaduct And City Temple 31 Holborn Viaduct London EC1A 2AT

    22/01010/PODC Submitted 13 Oct 2022 9m away

    Submission of the Highways Schedule of Condition Survey pursuant to Schedule 3 Paragraph 7.1 of the Section 106 Agreement dated 18 August 2020 (Planning Application Reference 17/00165/FULMAJ as amended by 20/00700/FULL).

    Granted 4 docs
  • Fitz Eylwin House 25 Holborn Viaduct London EC1A 2BP

    04/00751/LBC Submitted 25 Aug 2004 17m away

    Erection of 43cm diameter satellite dish on 1st floor balcony and retention of internal alterations, including new partitions to first floor front room.

    Granted Heritage and listed buildings
  • Fitz Eylwin House 25 Holborn Viaduct London EC1A 2BP

    04/00747/FULL Submitted 25 Aug 2004 17m away

    Erection of 43cm satellite dish on 1st floor balcony.

    Granted Full applications
  • Holborn Viaduct London EC1A 2BP

    24/01113/LBC Submitted 16 Oct 2024 17m away

    Repairs to four cast iron gates and stonework at Farringdon Gates, Holborn Viaduct.

    Granted Heritage and listed buildings 19 docs
  • City Temple 31 Holborn Viaduct London EC1A 2DE

    25/00965/LBC Submitted 22 Jul 2025 35m away

    Internal demolition works and alterations associated with the change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrance doors/canopies, and other incidental works.

    Granted Heritage and listed buildings Demolition Windows or glazing 67 docs
  • City Temple 31 Holborn Viaduct London EC1A 2DE

    25/00964/FULL Submitted 22 Jul 2025 35m away

    Change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrances doors/canopies, and other incidental works.

    Granted Full applications Windows or glazing 82 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications