Planning application

Offices Morley House 26 - 30 Holborn Viaduct London EC1A 2AT

Granted City of London 25/00970/FULMAJ Full Major Application

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of the existing building, partial retention of the existing basement and the erection of a lower ground, mezzanine, ground plus 11 storey building for hotel (Class C1) use, provision of substation, blue badge car and cycle parking, ancillary uses, servicing, rooftop plant and other back of house space, enabling works and other works associated with the development.

As published by the council, reference 25/00970/FULMAJ

Application record

Reference
25/00970/FULMAJ
Type
Full Major Application
Status
Decided
Decision
Granted As published: Approved
Received
22 Jul 2025
Validated
11 Aug 2025
Decided
18 Jun 2026
Ward
Farringdon Within
Decision by
Delegated
Postcode
EC1A 2AT

Timeline

Dates from the published record

  1. 22 Jul 2025

    Received by City of London

  2. 11 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 18 Jun 2026

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,602 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Staycity Morely Limited Applicant

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

149 documents on file for this application

  • COMPLETED SECTION 106 AGREEMENTEEMENT S106 Agreement · 02 Jul 2026
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 18 Jun 2026
  • DRAFT SECTION 106 AGREEMENT S106 Agreement · 10 Feb 2026
  • COMMENTS - LONDON UNDERGROUND Consultee Comment · 20 Jan 2026
  • DRAWING ISSUE SHEET Drawings Schedule · 15 Jan 2026
  • PROPOSED ELEVATION - EASTERN LIGHTWELL Drawing · 15 Jan 2026
  • PROPOSED ELEVATION - CENTRAL LIGHTWELL Drawing · 15 Jan 2026
  • PROPOSED ELEVATION - WESTERN LIGHTWELL Drawing · 15 Jan 2026
  • PROPOSED ELEVATION - WEST Drawing · 15 Jan 2026
  • PROPOSED ELEVATION - PLUMTREE COURT Drawing · 15 Jan 2026
  • PROPOSED ELEVATION - FARRINGDON STREET Drawing · 15 Jan 2026
  • PROPOSED ELEVATION - HOLBORN VIADUCT Drawing · 15 Jan 2026
  • EXISTING FLOOR PLAN - BASEMENT Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - BASEMENT FLOOR Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - ELEVENTH FLOOR PLAN Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - TYPICAL FLOOR PLAN (LEVELS 07-10) Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - TYPICAL FLOOR PLAN (LEVELS 05-06) Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - TYPICAL FLOOR PLAN (LEVELS 02-04) Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - FIRST FLOOR PLAN Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - GROUND FLOOR (HOLBORN VIADUCT) Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - LOWER GROUND MEZZANINE FLOOR (PLUMTREE COURT) Drawing · 15 Jan 2026
  • PROPOSED FLOOR PLAN - LOWER GROUND FLOOR (PLUMTREE COURT) Drawing · 15 Jan 2026
  • ISSUESHEET_PLANNING_P03 Drawings Schedule · 15 Jan 2026
  • S278 HIGHWAY WORKS PLAN Drawing · 15 Jan 2026
  • CARBON EMISSION REPORT Other · 13 Jan 2026
  • ENERGY STATEMENT Accompanying report · 13 Jan 2026
  • REMEDIAL HIGHWAY WORKS AREA Drawing · 08 Jan 2026
  • S278 HIGHWAY WORKS PLAN Drawing · 08 Jan 2026
  • EXTENT OF PROPOSED AWNINGS ON HOLBORN VIADUCT Drawing · 08 Jan 2026
  • LPG_-_WLCA_ASSESSMENT_TEMPLATE Accompanying report · 08 Jan 2026
  • RESPONSE TO GOLDMAN SACHS COMMENTS Other · 15 Dec 2025
  • CULTURAL PLAN ADDENDUM - REVISED Accompanying report · 02 Dec 2025
  • PLANNING NOTE Other · 02 Dec 2025
  • REPRESENTATION - GOLDMAN SACHS Public Comment · 13 Nov 2025
  • COMMENTS - THE SURVEYOR TO THE FABRIC OF ST PAULS Consultee Comment · 08 Oct 2025
  • RESPONSE TO CITY OF LONDON COMMENTS ? TRANSPORT AND WASTE Other · 03 Oct 2025
  • RESPONSE TO DESIGN & ACCESS COMMENTS Other · 03 Oct 2025
  • ARCHAEOLOGICAL STATEMENT OF CONFORMITY Other · 03 Oct 2025
  • MHL-7524-038-250916_A3T20I1 Illustration · 26 Sep 2025
  • MHL-7524-039-250916_A3T20I1 Illustration · 26 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 25 Sep 2025
  • AIR QUALITY ASSESSMENT Accompanying report · 22 Sep 2025
  • SECONDARY POWER PLANNING REPORT Accompanying report · 22 Sep 2025
  • COMMENTS - GREATER LONDON AUTHORITY Consultee Comment · 12 Sep 2025
  • DAYLIGHT AND SUNLIGHT REPORT Report - Daylight/Sunlight Report · 12 Sep 2025
  • COMMENTS - TFL Consultee Comment · 11 Sep 2025
  • COMMENTS - THAMES WATER Consultee Comment · 09 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 05 Sep 2025
  • COMMENTS - ROYAL BOROUGH OF GREENWICH Consultee Comment · 01 Sep 2025
  • ACKNOWLEDGEMENT LETTER Consultee Comment · 22 Aug 2025
  • COMMENTS - CAMDEN Consultee Comment · 22 Aug 2025
  • COMMENTS - GLA Consultee Comment · 20 Aug 2025
  • PROPOSED PLANS Drawing · 11 Aug 2025
  • THERMAL COMFORT NOTE Accompanying report · 11 Aug 2025
  • WIND MICROCLIMATE ASSESSMENT Accompanying report · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - LOWER GROUND FLOOR (PLUMTREE COURT) Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - LOWER GROUND FLOOR (PLUMTREE COURT) Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - SECOND FLOOR Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - GROUND FLOOR PLAN (HOLBORN VIADUCT) Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - FIRST FLOOR Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - SECOND FLOOR Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - SIXTH FLOOR Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - THIRD FLOOR Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - FOURTH FLOOR Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - SIXTH FLOOR Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - THIRD FLOOR Drawing · 11 Aug 2025
  • PROPOSED FLOOR PLAN - ROOF PLAN Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - ROOF Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - FOURTH FLOOR Drawing · 11 Aug 2025
  • SITE LOCATION PLAN Site Plan · 11 Aug 2025
  • PROPOSED MORLEY HOUSE SITE PLAN Site Plan · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - BASEMENT Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - FIFTH FLOOR Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - ROOF Drawing · 11 Aug 2025
  • PROPOSED SECTIONS - SECTION BB Drawing · 11 Aug 2025
  • EXISTING SECTIONS - SECTION AA Drawing · 11 Aug 2025
  • EXISTING ELEVATION - PLUMTREE COURT Drawing · 11 Aug 2025
  • EXISTING ELEVATION - WEST Drawing · 11 Aug 2025
  • EXISTING ELEVATION - HOLBORN VIADUCT Drawing · 11 Aug 2025
  • DEMOLITION ELEVATION - WEST Drawing · 11 Aug 2025
  • PROPOSED SECTIONS - SECTION AA Drawing · 11 Aug 2025
  • PROPOSED TYPICAL BAY - HOLBORN VIADUCT Drawing · 11 Aug 2025
  • EXISTING ELEVATION - FARRINGDON STREET Drawing · 11 Aug 2025
  • PROPOSED SECTIONS - SECTION CC Drawing · 11 Aug 2025
  • EXISTING SECTIONS - SECTION BB Drawing · 11 Aug 2025
  • EXISTING SECTIONS - SECTION CC Drawing · 11 Aug 2025
  • DEMOLITION ELEVATION - HOLBORN VIADUCT Drawing · 11 Aug 2025
  • DEMOLITION ELEVATION - FARRINGDON STREET Drawing · 11 Aug 2025
  • DEMOLITION ELEVATION - PLUMTREE COURT Drawing · 11 Aug 2025
  • PROPOSED TYPICAL BAY - PLUMTREE COURT Drawing · 11 Aug 2025
  • PROPOSED TYPICAL BAY - WEST Drawing · 11 Aug 2025
  • APPLICATION FORM - REDACTED Application Form · 11 Aug 2025
  • DEMOLITION PLANS Drawing · 11 Aug 2025
  • EXISTING PLANS Drawing · 11 Aug 2025
  • WIND MICROCLIMATE ASSESSMENT ? APPENDIX A Accompanying report · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - LOWER GROUND MEZZANINE (PLUMTREE COURT) Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - LOWER GROUND MEZZANINE (PLUMTREE COURT) Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - FIFTH FLOOR Drawing · 11 Aug 2025
  • DEMOLITION FLOOR PLAN - FIRST FLOOR Drawing · 11 Aug 2025
  • EXISTING FLOOR PLAN - GROUND FLOOR PLAN (HOLBORN VIADUCT) Drawing · 11 Aug 2025
  • GLA CIRCULAR ECONOMY SPREADSHEET TEMPLATE Other · 29 Jul 2025
  • 2250032-EWP-ZZ-XX-RP-Y-00002 -CIRCULAR ECONOMY VOL 1 OF 2 Other · 22 Jul 2025
  • ARCHAEOLOGY STATEMENT.V2.1 Other · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09040_CULTURAL PLAN FINAL_COMPRESSED Other · 22 Jul 2025
  • DP9 PLANNING STATEMENT - 18.07.25 - FINAL Report - Planning Statement/Report · 22 Jul 2025
  • MORLEY HOUSE - FORM_1_CIL_ADDITIONAL_INFORMATION Other · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 13 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 16 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 15 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 14 Report - Design & Access Statement/Report · 22 Jul 2025
  • 250717 MORLEY HOUSE HTVIA FINAL_PART1 Other · 22 Jul 2025
  • 250717 MORLEY HOUSE HTVIA FINAL_PART2 Other · 22 Jul 2025
  • 250717-8084- MORLEY HOUSE-FIRE PLANNING STATEMENT Other · 22 Jul 2025
  • 2250032-EWP-ZZ-XX-RP-Y-00001-ENERGY AND SUSTAINABILITY STATEMENT MORLEY HOUSE Other · 22 Jul 2025
  • 2250032-EWP-ZZ-XX-RP-Y-00003-CIRCULAR ECONOMY VOL 2 OF 2 Other · 22 Jul 2025
  • MORLEY HOUSE AND CITY TEMPLE - STATEMENT OF COMMUNITY INVOLVEMENT - FINAL UPDATE Other · 22 Jul 2025
  • MORLEY HOUSE BIODIVERSITY NET GAIN ASSESSMENT_2 Other · 22 Jul 2025
  • MORLEY HOUSE FARRINGDON - VENTILATION PLANNING REPORT1 Other · 22 Jul 2025
  • MORLEY HOUSE_HEALTH IMPACT ASSESSMENT INCL EQUALITIES STATEMENT Other · 22 Jul 2025
  • ENVIRONMENTAL MANAGEMENT PLAN, DEMOLITION MANAGEMENT PLA, CONSTRUCTION LOGISTICS Other · 22 Jul 2025
  • 25-15669 - MORLEY HOUSE - AIR QUALITY ASSESSMENT Accompanying report · 22 Jul 2025
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Accompanying report · 22 Jul 2025
  • COVERING LETTER - FINAL - 17.07.25 Cover Letter · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 12 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 11 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 10 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 09 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 08 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 07 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 06 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 05 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 04 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 03 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 02 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 01 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 23 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 22 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 21 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 20 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 19 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 18 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 17 Report - Design & Access Statement/Report · 22 Jul 2025
  • 250715 - D4B TRANSPORT ASSESSMENT MORLEY HOUSE (APPENDICES)_COMPRESSED Report - Transport Statement/Report · 22 Jul 2025
  • 250715 - D4B TRANSPORT ASSESSMENT MORLEY HOUSE (TEXT_DRGS) Report - Transport Statement/Report · 22 Jul 2025
  • 250717 MORLEY HOUSE HTVIA FINAL_PART3 Other · 22 Jul 2025
  • 250717 MORLEY HOUSE HTVIA FINAL_PART4 Other · 22 Jul 2025
  • 250717 MORLEY HOUSE HTVIA FINAL_PART5 Other · 22 Jul 2025
  • ACOUSTIC REPORT Report - Acoustic/Noise Report · 22 Jul 2025
  • GLA CIRCULAR ECONOMY SPREADSHEET TEMPLATE Other · 22 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 18 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 26-30 Morley House Holborn Viaduct London EC1A 2AT

    22/01143/MDC Submitted 28 Nov 2022 50 yards away

    100% historically approved · decision due ~23 Jan

    Submission of a Written Scheme of Investigation pursuant to the discharge of condition 8 of planning permission 20/00700/FULL dated 08 February 2022.

    Awaiting decision Conditions 3 docs
  • 26-30 Morley House Holborn Viaduct London EC1A 2AT

    22/00725/MDC Submitted 8 Aug 2022 50 yards away

    Submission of an Assurance Report which includes details of foundations, basement and ground floor structures pursuant to condition 10 of planning permission reference 20/00700/FULL dated 8th February 2022.

    Granted Conditions 16 docs
  • 26-30 Morley House Holborn Viaduct London EC1A 2AT

    20/00700/FULL Submitted 11 Sep 2020 50 yards away

    Application under Section 73 of the Town & Country Planning Act 1990 to vary Condition 41 (Approved Plans) of planning permission dated 17th August 2020 (Ref. 17/00165/FULMAJ) to enable minor material amendments to the approved scheme including: (1) Amended hotel entrances on Holborn Viaduct; (2) Internal reconfiguration of hotel layout; (3) Internal reconfiguration to provide an internalised access link between the ground floor of the hotel and the office workspace in the lower levels of City Temple; (4) Internal reconfiguration on ninth floor from hotel guestrooms to hotel Restaurant / Bar (private guest only); (5) Alterations to address design development changes to ceiling heights, parapets and roof plant areas; (6) associated amendments to facades; (7) the introduction of a Phasing Plan to allow a phased approach to the development and (8) a revised energy strategy.

    Granted Full applications 111 docs
  • Morley House 26 - 30 Holborn Viaduct And City Temple 31 Holborn Viaduct London EC1A 2AT

    22/01005/PODC Submitted 14 Oct 2022 50 yards away

    Submission of the Local Procurement Strategy (Demolition & Construction) pursuant to Schedule 3 Paragraphs 2.1 and 2.2 of the Section 106 Agreement dated 18 August 2020 (Planning Application Reference 17/00165/FULMAJ as amended by 20/00700/FULL).

    Granted Demolition 4 docs
  • Morley House 26 - 30 Holborn Viaduct And City Temple 31 Holborn Viaduct London EC1A 2AT

    22/01004/PODC Submitted 13 Oct 2022 50 yards away

    Submission of the Local Training Skills and Job Brokerage Strategy (End Use) pursuant to Schedule 3 Paragraph 3.9 of the Section 106 Agreement dated 18 August 2020 (Planning Application Reference 17/00165/FULMAJ as amended by 20/00700/FULL).

    Granted 4 docs
  • Morley House 26 - 30 Holborn Viaduct And City Temple 31 Holborn Viaduct London EC1A 2AT

    22/01010/PODC Submitted 13 Oct 2022 50 yards away

    Submission of the Highways Schedule of Condition Survey pursuant to Schedule 3 Paragraph 7.1 of the Section 106 Agreement dated 18 August 2020 (Planning Application Reference 17/00165/FULMAJ as amended by 20/00700/FULL).

    Granted 4 docs

In City of London

  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications
  • 26/00725/FULL Granted

    66 Shoe Lane London EC4A 3BQ

    (i) Replacement of existing kitchen extract equipment; (ii) installation of three condenser unit and associated works; at roof level inside the existing plant enclosure

    Received 19 May, published by the council 24 Jul 2026 Full applications
  • 26/01154/FULL Granted

    33 Holborn London EC1N 2HT

    Application under Section 73 of the Town & Country Planning Act 1990 (as amended) to vary Condition 3 (noise from new plant) and Condition 16 (Approved Drawings) of Planning Permission 24/00391/FULL dated 10.12.2024 in order to allow the reconfiguration of the approved roof plan, including reduced size and location of the pavilion and roof terrace along with the introduction of lift extension to roof level, increased size and rearrangement of rooftop plant room and other associated changes.

    Received 11 Aug, published by the council 13 Aug 2026 Full applications