Planning application

City Temple 31 Holborn Viaduct London EC1A 2DE

Granted City of London 25/00965/LBC Listed Building Consent

Works: Demolition Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal demolition works and alterations associated with the change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrance doors/canopies, and other incidental works.

As published by the council, reference 25/00965/LBC

Application record

Reference
25/00965/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Approved
Received
22 Jul 2025
Validated
11 Aug 2025
Decided
18 Jun 2026
Ward
Farringdon Within
Decision by
Delegated
Postcode
EC1A 2DE

Site history

Applications at this address on the City of London register

This site has had 5 applications since 2020: 5 approved, 0 refused.

  • 25/00964/FULL Granted

    City Temple 31 Holborn Viaduct London EC1A 2DE

    Change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrances doors/canopies, and other incidental works.

    Decided 18 Jun 2026 Full applications
  • 22/00473/LBC Granted

    City Temple 31 Holborn Viaduct London EC1A 2DE

    Removal of existing mezzanine floor and insertion of replacement floor, alterations to the fenestration on Shoe Lane at pavement level, insertion of an opening in the internalised east elevation of City Temple at lower ground and mezzanine level to facilitate linkage with Morley House, insertion of louvres on the Plumtree Court elevation; enlargement and underpinning existing foundations and additional column foundations; new Atrium junction detail between hotel and City Temple Church; and installation of new plant in association with the change of use of the lower ground and mezzanine floor to office space.

    Decided 20 Jan 2023 Heritage and listed buildings
  • 22/00477/FULL Granted

    City Temple 31 Holborn Viaduct London EC1A 2DE

    External alterations comprising: new and extended rooftop plant, 4 no. replacement ventilation louvres on the Shoe Lane elevation; roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; new roofing replacing existing felt with single ply membrane and insulation; and installation of a fall arrest system including rail and ladder.

    Decided 20 Jan 2023 Full applications
  • 20/00702/FULL Granted

    City Temple 31 Holborn Viaduct London EC1A 2DE

    Application under Section 73 of the Town & Country Planning Act 1990 to vary condition 9 (Approved drawings) of planning permission ref: 17/00781/FULL dated 24th October 2017 to enable minor material amendments to the approved scheme including: (1) 4 no. replacement ventilation louvres on the Shoe Lane elevation; (2) Roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; (3) New roofing replacing existing felt with single ply membrane and insulation; and (4) Installation of fall arrest system including rail and ladder.

    Decided 14 Jul 2021 Full applications

Timeline

Dates from the published record

  1. 22 Jul 2025

    Received by City of London

  2. 11 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 18 Jun 2026

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 25/00964/FULL (Decided)

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,604 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Thomas Staycity Morley Ltd Applicant

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

67 documents on file for this application

  • LISTED BUILDING CONSENT (CONDITIONAL) Decision · 18 Jun 2026
  • CITY TEMPLE CHURCH - PROPOSED ELEVATION - PLUMTREE COURT Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED FLOOR PLAN - LOWER GROUND FLOOR Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED TYPICAL BAY - PLUMTREE COURT Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED TYPICAL BAY - SHOE LANE ENTRANCE Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED TYPICAL BAY - SHOE LANE Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED TYPICAL BAY - SHOE LANE Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - DEMOLITION LONG SECTION Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - EXISTING CROSS SECTION Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - EXISTING LONG SECTION Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED CROSS SECTION Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED LONG SECTION Drawing · 19 Jan 2026
  • CITY TEMPLE CHURCH - PROPOSED ELEVATION - SHOE LANE Drawing · 19 Jan 2026
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 04 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 04 Sep 2025
  • CITY TEMPLE CHURCH - PROPOSED FLOOR PLAN - LOWER GROUND FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - DEMOLITION FLOOR PLAN - LOWER GROUND MEZZANINE FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - PROPOSED FLOOR PLAN - BASEMENT FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - EXISTING FLOOR PLAN - LOWER GROUND MEZZANINE FLOOR Drawing · 11 Aug 2025
  • SITE LOCATION PLAN - CITY TEMPLE CHURCH Site Plan · 11 Aug 2025
  • PROPOSED CITY TEMPLE SITE PLAN Site Plan · 11 Aug 2025
  • CITY TEMPLE CHURCH - DEMOLITION FLOOR PLAN - BASEMENT FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - EXISTING ELEVATION - WEST Drawing · 11 Aug 2025
  • DEMOLITION PLANS Drawing · 11 Aug 2025
  • EXISTING PLANS Drawing · 11 Aug 2025
  • PROPOSED PLANS Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - PROPOSED FLOOR PLAN - LOWER GROUND MEZZANINE FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - DEMOLITION FLOOR PLAN - LOWER GROUND FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - PROPOSED ELEVATION - PLUMTREE COURT Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - EXISTING FLOOR PLAN - BASEMENT FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - EXISTING FLOOR PLAN - LOWER GROUND FLOOR Drawing · 11 Aug 2025
  • CITY TEMPLE CHURCH - DEMOLITION ELEVATION - WEST Drawing · 11 Aug 2025
  • CITY TEMPLE - FORM_1_CIL_ADDITIONAL_INFORMATION Other · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 14 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 13 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 10 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 09 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 08 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 07 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 06 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 05 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 04 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 03 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 02 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 01 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 23 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 22 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 21 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 20 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 19 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 18 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 17 Report - Design & Access Statement/Report · 22 Jul 2025
  • APPLICATIONFORMREDACTED Application Form · 22 Jul 2025
  • 250710 MORLEY HOUSE HIA Accompanying report · 22 Jul 2025
  • 250717 - D9C TRANSPORT ASSESSMENT CITY TEMPLE (COMPILED) Report - Transport Statement/Report · 22 Jul 2025
  • 2250032-EWP-ZZ-XX-RP-Y-00007 -SUSTAINABILITY STATEMENT CITY TEMPLE Other · 22 Jul 2025
  • ARCHAEOLOGY STATEMENT.V2.1 Other · 22 Jul 2025
  • ACOUSTIC REPORT Report - Acoustic/Noise Report · 22 Jul 2025
  • TEC0718 - CITY TEMPLE BNG STATEMENT_1 Other · 22 Jul 2025
  • MORLEY HOUSE FARRINGDON - VENTILATION PLANNING REPORT1 Accompanying report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 12 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 11 Report - Design & Access Statement/Report · 22 Jul 2025
  • MORLEY HOUSE AND CITY TEMPLE - STATEMENT OF COMMUNITY INVOLVEMENT - FINAL UPDATE Other · 22 Jul 2025
  • COVERING LETTER - FINAL - 17.07.25 Cover Letter · 22 Jul 2025
  • DP9 PLANNING STATEMENT - 18.07.25 - FINAL Report - Planning Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 16 Report - Design & Access Statement/Report · 22 Jul 2025
  • MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 15 Report - Design & Access Statement/Report · 22 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 18 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • City Temple 31 Holborn Viaduct London EC1A 2DE

    25/00964/FULL Submitted 22 Jul 2025 50 yards away

    Change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrances doors/canopies, and other incidental works.

    Granted Full applications Windows or glazing 82 docs
  • City Temple 31 Holborn Viaduct London EC1A 2DE

    20/00702/FULL Submitted 11 Sep 2020 50 yards away

    Application under Section 73 of the Town & Country Planning Act 1990 to vary condition 9 (Approved drawings) of planning permission ref: 17/00781/FULL dated 24th October 2017 to enable minor material amendments to the approved scheme including: (1) 4 no. replacement ventilation louvres on the Shoe Lane elevation; (2) Roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; (3) New roofing replacing existing felt with single ply membrane and insulation; and (4) Installation of fall arrest system including rail and ladder.

    Granted Full applications Loft or dormer 20 docs
  • City Temple 31 Holborn Viaduct London EC1A 2DE

    22/00473/LBC Submitted 9 Jun 2022 50 yards away

    Removal of existing mezzanine floor and insertion of replacement floor, alterations to the fenestration on Shoe Lane at pavement level, insertion of an opening in the internalised east elevation of City Temple at lower ground and mezzanine level to facilitate linkage with Morley House, insertion of louvres on the Plumtree Court elevation; enlargement and underpinning existing foundations and additional column foundations; new Atrium junction detail between hotel and City Temple Church; and installation of new plant in association with the change of use of the lower ground and mezzanine floor to office space.

    Granted Heritage and listed buildings Windows or glazing 115 docs
  • City Temple 31 Holborn Viaduct London EC1A 2DE

    22/00477/FULL Submitted 9 Jun 2022 50 yards away

    External alterations comprising: new and extended rooftop plant, 4 no. replacement ventilation louvres on the Shoe Lane elevation; roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; new roofing replacing existing felt with single ply membrane and insulation; and installation of a fall arrest system including rail and ladder.

    Granted Full applications Loft or dormer 61 docs
  • 26-30 Morley House Holborn Viaduct London EC1A 2AT

    22/00725/MDC Submitted 8 Aug 2022 50 yards away

    Submission of an Assurance Report which includes details of foundations, basement and ground floor structures pursuant to condition 10 of planning permission reference 20/00700/FULL dated 8th February 2022.

    Granted Conditions 16 docs
  • 26-30 Morley House Holborn Viaduct London EC1A 2AT

    20/00700/FULL Submitted 11 Sep 2020 50 yards away

    Application under Section 73 of the Town & Country Planning Act 1990 to vary Condition 41 (Approved Plans) of planning permission dated 17th August 2020 (Ref. 17/00165/FULMAJ) to enable minor material amendments to the approved scheme including: (1) Amended hotel entrances on Holborn Viaduct; (2) Internal reconfiguration of hotel layout; (3) Internal reconfiguration to provide an internalised access link between the ground floor of the hotel and the office workspace in the lower levels of City Temple; (4) Internal reconfiguration on ninth floor from hotel guestrooms to hotel Restaurant / Bar (private guest only); (5) Alterations to address design development changes to ceiling heights, parapets and roof plant areas; (6) associated amendments to facades; (7) the introduction of a Phasing Plan to allow a phased approach to the development and (8) a revised energy strategy.

    Granted Full applications 111 docs

In City of London

  • 24/01057/LBC Withdrawn

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Installation of 2x lanterns with hub branding and one internally illuminated sign.

    Received 2 Oct, published by the council 21 Oct 2026 Heritage and listed buildings
  • 26/01222/LBC Granted

    Rising Sun Public House 61 Carter Lane London EC4V 5DY

    Installation of 2no. eyebolt fixings to northern elevation to hold catenary wires to facilitate festive lighting and decoration displays

    Received 27 Aug, published by the council 8 Sep 2026 Heritage and listed buildings
  • 26/01179/LBC Granted

    Shaws Booksellers Public House 31 - 34 St Andrew's Hill London EC4V 5DE

    Alterations to a Listed building including: (i) installation of externally illuminated fascia signage, projecting signage and menu signs (ii) installation of nine awnings.

    Received 17 Aug, published by the council 26 Aug 2026 Heritage and listed buildings
  • 26/01167/LBC Granted

    4 Frederick's Place London EC2R 8AB

    1 x wall mounted non illuminated polished brass plaque.

    Received 13 Aug, published by the council 19 Aug 2026 Heritage and listed buildings
  • 26/00489/LBC Granted

    391 Cromwell Tower Barbican London EC2Y 8NB

    Replacement of timber service door with an aluminium framed glazed door at penthouse levels 39 - 40.

    Received 2 Apr, published by the council 24 Jul 2026 Heritage and listed buildings