Proposal
Change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrances doors/canopies, and other incidental works.
As published by the council, reference 25/00964/FULL
Application record
- Reference
- 25/00964/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 22 Jul 2025
- Validated
- 11 Aug 2025
- Decided
- 18 Jun 2026
- Ward
- Farringdon Within
- Decision by
- Delegated
- Postcode
- EC1A 2DE
Site history
Applications at this address on the City of London register
This site has had 5 applications since 2020: 5 approved, 0 refused.
-
25/00965/LBC Granted
City Temple 31 Holborn Viaduct London EC1A 2DE
Internal demolition works and alterations associated with the change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrance doors/canopies, and other incidental works.
-
22/00473/LBC Granted
City Temple 31 Holborn Viaduct London EC1A 2DE
Removal of existing mezzanine floor and insertion of replacement floor, alterations to the fenestration on Shoe Lane at pavement level, insertion of an opening in the internalised east elevation of City Temple at lower ground and mezzanine level to facilitate linkage with Morley House, insertion of louvres on the Plumtree Court elevation; enlargement and underpinning existing foundations and additional column foundations; new Atrium junction detail between hotel and City Temple Church; and installation of new plant in association with the change of use of the lower ground and mezzanine floor to office space.
-
22/00477/FULL Granted
City Temple 31 Holborn Viaduct London EC1A 2DE
External alterations comprising: new and extended rooftop plant, 4 no. replacement ventilation louvres on the Shoe Lane elevation; roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; new roofing replacing existing felt with single ply membrane and insulation; and installation of a fall arrest system including rail and ladder.
-
20/00702/FULL Granted
City Temple 31 Holborn Viaduct London EC1A 2DE
Application under Section 73 of the Town & Country Planning Act 1990 to vary condition 9 (Approved drawings) of planning permission ref: 17/00781/FULL dated 24th October 2017 to enable minor material amendments to the approved scheme including: (1) 4 no. replacement ventilation louvres on the Shoe Lane elevation; (2) Roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; (3) New roofing replacing existing felt with single ply membrane and insulation; and (4) Installation of fall arrest system including rail and ladder.
Timeline
Dates from the published record
-
22 Jul 2025
Received by City of London
-
11 Aug 2025
Validated
Checked as complete and ready for consideration.
-
18 Jun 2026
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 25/00965/LBC (Decided)
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,604 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordThomas Staycity Morley Ltd Applicant
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
82 documents on file for this application
- PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
- DEMOLITION FLOOR PLAN - SECOND FLOOR
- CITY TEMPLE CHURCH - PROPOSED TYPICAL BAY - PLUMTREE COURT
- CITY TEMPLE CHURCH - PROPOSED TYPICAL BAY - SHOE LANE
- CITY TEMPLE CHURCH - DEMOLITION LONG SECTION
- CITY TEMPLE CHURCH - PROPOSED CROSS SECTION
- CITY TEMPLE CHURCH - PROPOSED LONG SECTION
- CITY TEMPLE CHURCH - PROPOSED ELEVATION - SHOE LANE
- CITY TEMPLE CHURCH - PROPOSED ELEVATION - PLUMTREE COURT
- CITY TEMPLE CHURCH - PROPOSED FLOOR PLAN - LOWER GROUND FLOOR
- CITY TEMPLE CHURCH - PROPOSED TYPICAL BAY - SHOE LANE ENTRANCE
- CITY TEMPLE CHURCH - DEMOLITION CROSS SECTION
- CITY TEMPLE CHURCH - EXISTING CROSS SECTION
- CITY TEMPLE CHURCH - EXISTING LONG SECTION
- S278 HIGHWAY WORKS PLAN
- COMMENTS - TRANSPORT - MEMO
- COMMENTS - TRANSPORT - S278 PLAN
- COMMENTS - TRANSPORT - REPORT
- COMMENTS - TWENTIETH CENTURY SOCIETY
- REPRESENTATION - GOLDMAN SACHS
- BELOW TEMPLE WORKS - RESPONSE TO OFFICERS? COMMENTS
- COMMENTS - WASTE
- REPRESENTATION - ANTHONY HALL
- REPRESENTATION - MAUREEN SMITH
- REPRESENTATION - JOVAN MRKAIC
- REPRESENTATION - ADEOLA ODUTOLA
- REPRESENTATION - SONY VALUSEK
- REPRESENTATION - L BLOOM
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HISTORIC ENGLAND
- PROPOSED PLANS
- EXISTING PLANS
- DEMOLITION PLANS
- CITY TEMPLE CHURCH - DEMOLITION FLOOR PLAN - LOWER GROUND MEZZANINE FLOOR
- SITE LOCATION PLAN - CITY TEMPLE CHURCH
- PROPOSED CITY TEMPLE SITE PLAN
- CITY TEMPLE CHURCH - EXISTING FLOOR PLAN - LOWER GROUND MEZZANINE FLOOR
- CITY TEMPLE CHURCH - DEMOLITION FLOOR PLAN - BASEMENT FLOOR
- CITY TEMPLE CHURCH - PROPOSED FLOOR PLAN - BASEMENT FLOOR
- CITY TEMPLE CHURCH - EXISTING FLOOR PLAN - BASEMENT FLOOR
- CITY TEMPLE CHURCH - EXISTING ELEVATION - PLUMTREE COURT
- CITY TEMPLE CHURCH - DEMOLITION FLOOR PLAN - LOWER GROUND FLOOR
- CITY TEMPLE CHURCH - EXISTING FLOOR PLAN - LOWER GROUND FLOOR
- CITY TEMPLE CHURCH - EXISTING ELEVATION - WEST
- CITY TEMPLE CHURCH - PROPOSED FLOOR PLAN - LOWER GROUND MEZZANINE FLOOR
- CITY TEMPLE CHURCH - DEMOLITION ELEVATION - PLUMTREE COURT
- CITY TEMPLE CHURCH - DEMOLITION ELEVATION - WEST
- PLANNING STATEMENT
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 15
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 14
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 13
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 12
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 11
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 10
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 09
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 08
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 07
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 06
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 05
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 04
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 03
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 02
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 01
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 23
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 22
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 21
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 20
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 19
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 18
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 17
- APPLICATIONFORMREDACTED
- 250710 MORLEY HOUSE HIA
- 250717 - D9C TRANSPORT ASSESSMENT CITY TEMPLE (COMPILED)
- 2250032-EWP-ZZ-XX-RP-Y-00007 -SUSTAINABILITY STATEMENT CITY TEMPLE
- ARCHAEOLOGY STATEMENT.V2.1
- ACOUSTIC REPORT
- TEC0718 - CITY TEMPLE BNG STATEMENT_1
- MORLEY HOUSE AND CITY TEMPLE - STATEMENT OF COMMUNITY INVOLVEMENT - FINAL UPDATE
- CITY TEMPLE - FORM_1_CIL_ADDITIONAL_INFORMATION
- COVERING LETTER - FINAL - 17.07.25
- MOR-AUK-ZZ-ZZ-RP-A-09033_DESIGN AND ACCESS STATEMENT P05_PART 16
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 18 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
City Temple 31 Holborn Viaduct London EC1A 2DE
Internal demolition works and alterations associated with the change of use of the City Temple basement, lower ground and extended mezzanine floor, to provide uses within Flexible Class E/F1 with associated new and altered windows, entrance doors/canopies, and other incidental works.
Granted Heritage and listed buildings Demolition Windows or glazing 67 docs -
City Temple 31 Holborn Viaduct London EC1A 2DE
Application under Section 73 of the Town & Country Planning Act 1990 to vary condition 9 (Approved drawings) of planning permission ref: 17/00781/FULL dated 24th October 2017 to enable minor material amendments to the approved scheme including: (1) 4 no. replacement ventilation louvres on the Shoe Lane elevation; (2) Roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; (3) New roofing replacing existing felt with single ply membrane and insulation; and (4) Installation of fall arrest system including rail and ladder.
Granted Full applications Loft or dormer 20 docs -
City Temple 31 Holborn Viaduct London EC1A 2DE
Removal of existing mezzanine floor and insertion of replacement floor, alterations to the fenestration on Shoe Lane at pavement level, insertion of an opening in the internalised east elevation of City Temple at lower ground and mezzanine level to facilitate linkage with Morley House, insertion of louvres on the Plumtree Court elevation; enlargement and underpinning existing foundations and additional column foundations; new Atrium junction detail between hotel and City Temple Church; and installation of new plant in association with the change of use of the lower ground and mezzanine floor to office space.
Granted Heritage and listed buildings Windows or glazing 115 docs -
City Temple 31 Holborn Viaduct London EC1A 2DE
External alterations comprising: new and extended rooftop plant, 4 no. replacement ventilation louvres on the Shoe Lane elevation; roof level concrete and glass brick skylights to be refurbished or replaced with polycarbonate roof-lights; new roofing replacing existing felt with single ply membrane and insulation; and installation of a fall arrest system including rail and ladder.
Granted Full applications Loft or dormer 61 docs -
26-30 Morley House Holborn Viaduct London EC1A 2AT
Submission of an Assurance Report which includes details of foundations, basement and ground floor structures pursuant to condition 10 of planning permission reference 20/00700/FULL dated 8th February 2022.
Granted Conditions 16 docs -
26-30 Morley House Holborn Viaduct London EC1A 2AT
Application under Section 73 of the Town & Country Planning Act 1990 to vary Condition 41 (Approved Plans) of planning permission dated 17th August 2020 (Ref. 17/00165/FULMAJ) to enable minor material amendments to the approved scheme including: (1) Amended hotel entrances on Holborn Viaduct; (2) Internal reconfiguration of hotel layout; (3) Internal reconfiguration to provide an internalised access link between the ground floor of the hotel and the office workspace in the lower levels of City Temple; (4) Internal reconfiguration on ninth floor from hotel guestrooms to hotel Restaurant / Bar (private guest only); (5) Alterations to address design development changes to ceiling heights, parapets and roof plant areas; (6) associated amendments to facades; (7) the introduction of a Phasing Plan to allow a phased approach to the development and (8) a revised energy strategy.
Granted Full applications 111 docs
Other full applications
In City of London
-
25/01794/FULL Granted
50 Cannon Street London EC4N 6JJ
Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.
-
26/00865/FULL Granted
9 Newbury Street London EC1A 7HU
Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.
-
26/01110/FULL Granted
200 Aldersgate Street London EC1A 4HD
Retrospective application for the installation of 2no. condenser units to fifth floor roof.
-
26/01109/FULL Granted
100 Bishopsgate London EC2N 4AA
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
-
26/01053/FULL Granted
49 Cheapside London EC2V 6AT
Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass