Planning application
Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS
Works: Extension Loft or dormer Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Works to the exterior of the conservatory including removal and replacement of all glazing, new louvres, works to the aluminium frame; enclosure of external portions of upper level walkways; works to the Triangle space to include new gardeners workshop, removal and replacement of all paving with new waterproofing installed below, new planting beds. External works to the Lakeside Terrace and catering block to include: removal and replacement of all paving with new waterproofing below, replacement glazing to the catering block and lakeside facade; lowering of the catering block cafe window cil at ground floor; new awnings to catering block; replacement lighting stands to lakeside edge; replaced lighting to under croft; facade repairs to the lakeside facade and works to staircase 8; works to external doors including fixed glazing to Eastern end and replacement of main foyer doors with single doorset; restoration of fountains. Other external works to include creation of air vents to the art gallery roof and a single shaft face, works to external louvres, new external lighting to the conservatory entrance on Frobisher Crescent. Replacement of sculpture court rooflight, re-glazing to art gallery north and east facade around WC block, new Art gallery foyer entrance doors. Enlarged grille for UKPN substation access in Silk Street pavement; Works to lakeside balconies, including replacement paving and waterproofing below, re-levelling, planting and planters to stair 8. New landscaping and regrading works to sculpture court art gallery foyer and other associated works and infrastructure.
As published by the council, reference 25/00917/FULL
Application record
- Reference
- 25/00917/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 15 Jul 2025
- Validated
- 15 Jul 2025
- Decided
- 24 Feb 2026
- Ward
- Cripplegate
- Decision by
- Delegated
- Postcode
- EC2Y 8DS
Site history
Applications at this address on the City of London register
This site has had 3 applications since 2025: 3 approved, 0 refused.
-
25/00911/FULL Granted
Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS
Application to allow the use of 17 car parking bays of Car Park 3 Level B1 at the Barbican Centre for ancillary storage space.
-
25/00910/LBC Granted
Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS
Works comprising: Conservatory Exterior; replacement of glazing, new louvres, works to frame; enclosure of walkways; new workshop, new planter beds; vents to art gallery roof and shaft face, works to louvres, new lighting; replacement glazing to corridor; replacement of sculpture court rooflight, reglazing to art gallery and WC block; new art gallery doors. Conservatory Interior; new path layout, planting beds and pond; removal of rooflights and works to offices; new structure to terrace and replacement of stair; new stair and lift core adjacent to fly tower; insertion of spiral stair and widening opening; new garden room plant, lighting and flooring; opening to shaft; new doors to conservatory; works to art gallery lighting; upgrades to cloakroom and toilets. External works to Lakeside Terrace and catering block; replacement glazing; lowering of cafe cil; new awnings; new and replacement lighting; facade repairs; works to staircase 8; replacement foyer doors; works to balconies, including levelling and planting; and restoration of fountains. Internal works to the foyers; creation of openings in shafts; lift installation; changes to lighting; installation of LED screens; creation of access hatches to shafts; replacement flooring; replacement and relocation of shop; creation of new WCs and refurbishment of existing; new quiet room; removal of cafe and relocation of bar; additional storage and works to doors at internal roadway, creation of level access in the Curve Gallery and other works to finishes; infill of martini bar hole; new power and data points to shafts; strip out of catering block interiors to shell and core. Other; works to back of house areas including plant rooms, Car Park 3 and 5, and service road to facilitate MEP; enlarged grille in Silk Street pavement; removal and replacement of paving to include waterproofing throughout; other landscaping and regrading works; and other associated works and infrastructure.
Timeline
Dates from the published record
-
15 Jul 2025
Received by City of London
-
24 Feb 2026
Decision issued: Approved
-
7 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
The Planning Lab Agent, a planning consultancy
182 applications on PlanIndex · across 15 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
326 documents on file for this application
- PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
- COMMENTS - TRANSPORT FOR LONDON
- FIRE STATEMENT REPORT_P04 + FIRE STATEMENT FORM
- CONSERVATORY - FABRIC REMOVAL SOUTH EAST ELEVATION
- CONSERVATORY-GARDEN ROOM AND TERRACE-CROSS SECTION
- CONSERVATORY - PROPOSED GARDEN ROOM & TERRACE ELEVATION
- CONSERVATORY - PROPOSED LEVEL 04 PLAN - FLYTOWER WALKWAY
- FOYER - FABRIC REMOVAL ELEVATIONS - NEW LIFT
- FABRIC REMOVAL SOUTH ELEVATION
- CATERING BLOCK - FABRIC REMOVAL ELEVATIONS
- FOYER - PROPOSED - FACADE BAY STUDY - MAIN ENTRANCE BAYS
- CONSERVATORY - PROPOSED LEVEL 04 PLAN - CONSERVATORY TERRACE
- FOYER - EXISTING ELEVATIONS - NEW LIFT
- FOYER - FABRIC REMOVAL LEVEL 00 FLOOR PLAN
- FOYER - FABRIC REMOVAL LEVEL B2M FLOOR PLAN
- FOYER - PROPOSED - FACADE BAY STUDY - WESTERN BAY
- CATERING BLOCK - PROPOSED - FACADE BAY STUDY - SOUTH
- FOYER - PROPOSED SECTION - EAST-WEST - 2
- FOYER - PROPOSED SECTION - NORTH-SOUTH - 2
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 02
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 03
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 04
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 05
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 06
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL ROOF PLAN
- CONSERVATORY - FABRIC REMOVAL SOUTH ELEVATION
- CONSERVATORY-FABRIC REMOVAL-GARDEN ROOM AND TERRACE
- CONSERVATORY-FABRIC REMOVAL-GARDEN ROOM AND TERRACE ELEVATION
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCP
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 3 RCP
- CONSERVATORY AND UPPER FOYERS- FABRIC REMOVAL LEVEL 4 RCP
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 03 PLAN
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 04 PLAN
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 05 PLAN
- CONSERVATORY - PROPOSED SECTION AA
- CONSERVATORY - PROPOSED SECTION BB
- CONSERVATORY - PROPOSED LEVEL 03 PLAN - ARRIVAL AREA
- CONSERVATORY - PROPOSED LEVEL 03 PLAN - CENTRAL POND
- CONSERVATORY - PROPOSED LEVEL 03 PLAN - GARDEN ROOM
- CONSERVATORY - PROPOSED LEVEL 03 PLAN - EAST LANDSCAPE
- CONSERVATORY - PROPOSED LEVEL 03 PLAN- THE TRIANGLE
- LEVEL 03 FOYER-PROPOSED LEVEL 03 PLAN
- CONSERVATORY - PROPOSED LEVEL 04 PLAN - ARID PROPAGATION
- CONSERVATORY - PROPOSED LEVEL 05 FLYTOWER WALKWAY
- CONSERVATORY - TERRACE - BAY STUDY 3 OF 6
- CONSERVATORY - TERRACE - BAY STUDY 4 OF 6
- FOYER - PROPOSED LAYOUT - LEVEL 0 BRIDGE
- FOYER - PROPOSED LEVEL B1 FLOOR PLAN
- FOYER - PROPOSED LAYOUT - NEW LIFT
- FOYER - PROPOSED LAYOUT - SCREENS
- CATERING BLOCK - PROPOSED - FACADE DETAILS - UPPER LEVELS
- CATERING BLOCK & LIBRARY - PROPOSED - WINDOWS
- PROPOSED SOUTH ELEVATION
- FOYER - PROPOSED LEVEL B1 FLOOR PLAN
- FOYER - PROPOSED SECTION - NORTH-SOUTH - 2
- CONSERVATORY - PROPOSED LEVEL 04 PLAN - CONSERVATORY TERRACE
- LEVEL 3 & 4 FOYER - FABRIC REMOVAL ELEVATIONS
- CONSERVATORY - FABRIC REMOVAL NORTH ELEVATION
- CONSERVATORY - FABRIC REMOVAL NORTH EAST ELEVATION
- CONSERVATORY - FABRIC REMOVAL WEST ELEVATION
- CONSERVATORY - FABRIC REMOVAL WEST ELEVATION INTERNAL
- CONSEVATORY - FABRIC REMOVAL SECTION AA
- CONSERVATORY - FABRIC REMOVAL SECTION BB
- CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCP
- CONSERVATORY - PROPOSED SECTION AA
- FOYER - PROPOSED - FACADE DETAILS - WESTERN BAY
- FOYER - PROPOSED - FACADE DETAILS - WESTERN BAY
- BRP PHASE 1 TRACKER - ACCESS COMMENTS 18.12.25
- BRP PHASE 1 TRACKER - DESIGN COMMENTS 18.12.25
- EA PAGES IN DAS
- DAS ADDENDUM 19.12.25
- BRP, TOILET EQUALITY ANALYSIS
- DRAWING LIST
- DRAWING LIST_COMMENTS
- FOYER BRIDGE FOOTFALL - ADDITONAL INFORMATION
- LEVEL 0 RAMP OCCUPANCY DRAWING
- HSE COMMENTS
- NOISE IMPACT ASSESSMENT
- SUSTAINABILITY FURTHER INFORMATION
- COMMENTS - BARBICAN ASSOCIATION
- COMMENTS - CAAC LETTER
- COMMENTS - SUSTAINABILITY
- APPLICATION EMAIL
- VARIOUS DRAWINGS
- CONSULTATION_PLAN
- COVER LETTER
- COMMENTS - LONDON UNDERGROUND
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HEALTH AND SAFETY EXECUTIVE
- COMMENTS - THE GARDENS TRUST
- FIRE STATEMENT REPORT
- COMMENTS - NATIONAL AMENITY SOCIETY?S
- THE_STATUTORY_BIODIVERSITY_METRIC_CALCULATION_TOOL
- BCRPP1-BHE-XX-XXXX-RP-SP-07001 - SUSTAINABILITY STATEMENT PART 2
- BCRPP1-BHE-XX-XXXX-RP-EE-07001 - LIGHTING (BACK OF HOUSE) REPORT
- BCRPP1-BHE-XX-XXXX-RP-EC-07001 - BIODIVERSITY NET GAIN REPORT
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 1
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 2
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 3
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 4
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 5
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 6
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 7
- COVER LETTER
- HANDLING NOTE
- CIL FORM
- BRP PLANNING STATEMENT
- APPLICATIONFORMREDACTED
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 0
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART8
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 1_PART 1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 1_PART 2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 3
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART3
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART4
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART5
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART6
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART7
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.3
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART3
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART4
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART5
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART6
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART7
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.5_PART1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.5_PART2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART3
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.8
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.9_PART2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 4_5_6
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.4
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.5_PART 1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.5_PART 2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.6_PART 2
- LEVEL 3 AND 4 FOYER - EXISTING ELEVATIONS
- CONSERVATORY - EXISTING SOUTH ELEVATION
- CONSERVATORY - EXISTING SOUTH EAST ELEVATION
- CONSERVATORY AND UPPER FOYERS - EXISTING ROOF
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- LEVEL 03 FOYER - TYPICAL EXISTING FACADE DETAIL
- LEVEL 03 FOYER - TYPICAL PROPOSED FACADE DETAIL
- LEVEL 03 AND 04 FOYER - TYPICAL NORTH GLAZING D
- LEVEL 04 FOYER - TYPICAL ROOFLIGHT DETAIL
- SCULPTURE COURT - TYPICAL EXISTING ROOFLIGHT DE
- SCULPTURE COURT - TYPICAL PROPOSED ROOFLIGHT DE
- CONSERVATORY - TERRACE - TYPICAL FACADE
- CONSERVATORY - TERRACE - TYPICAL SECTION
- CONSERVATORY-TERRACE-TYPICAL SECTION
- CONSERVATORY - INFILL GLAZING TYPICAL PLAN DETA
- CONSERVATORY - INFILL GLAZING TYPICAL SECTION D
- CONSERVATORY - TYPICAL FACADE BASE DETAIL
- CONSERVATORY - TYPICAL VERTICAL GLAZING DETAILS
- CONSERVATORY - TYPICAL SLOPED GLAZING DETAIL
- CONSERVATORY - GARDEN ROOM - TYPICAL DETAILS
- CONSERVATORY - TYPICAL BALUSTRADE TYPE 03
- CONSERVATORY - TYPICAL LANDSCAPE SECTION
- CONSERVATORY - TYPICAL SEATING AREA DETAIL
- CONSERVATORY - TYPICAL PLANTER DETAIL
- CONSERVATORY - SHAFT OPENINGS
- STAIRCASE 8 - TYPICAL DETAILS
- LEVEL 3 AND 4 FOYER - PROPOSED ELEVATIONS
- CONSERVATORY - PROPOSED SOUTH ELEVATION
- CONSERVATORY - PROPOSED SOUTH EAST ELEVATION
- CONSERVATORY - PROPOSED NORTH ELEVATION
- CONSERVATORY - PROPOSED NORTH EAST ELEVATION
- CONSERVATORY - PROPOSED WEST ELEVATION
- CONSERVATORY - PROPOSED WEST ELEVATION INTERNAL
- SITE WIDE - PROPOSED SILK STREET ELEVATION
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL
- CONSERVATORY AND UPPER FOYERS - PROPOSED ROOF
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL
- CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL
- CONSERVATORY-GARDEN ROOM AND TERRACE-CROSS SECT
- CONSERVATORY-GARDEN ROOM AND TERRACE-NORTH ELEV
- STAIRCASE 8 - LONG SECTIONS
- CONSERVATORY - PROPOSED LEVEL 03 PLAN- BALCONIE
- FOYER - EXISTING LEVEL 01 FLOOR PLAN
- FOYER - EXISTING LEVEL 01 RCP
- FOYER - EXISTING LEVEL B1 FLOOR PLAN
- FOYER - EXISTING LEVEL B1 RCP
- FOYER - EXISTING LEVEL B1M FLOOR PLAN
- FOYER - EXISTING LEVEL B1M RCP
- FOYER - EXISTING LEVEL B2M FLOOR PLAN
- FOYER - EXISTING LEVEL B2M RCP
- FOYER - EXISTING - SECTION - EAST-WEST - 1
- FOYER - EXISTING - SECTION - EAST-WEST - 2
- CATERING BLOCK - EXISTING FACADE DETAILS
- CATERING BLOCK - EXISTING FACADE DETAILS - UPPER
- CATERING BLOCK AND LIBRARY - EXISTING FACADE DETA
- CATERING BLOCK - EXISTING SECTION
- CATERING BLOCK - EXISTING - FACADE BAY STUDY - SO
- CATERING BLOCK - EXISTING - FACADE BAY STUDY - EA
- FOYER - PROPOSED LEVEL B1 RCP
- FOYER - PROPOSED - FACADE BAY STUDY - TRIPLE HEIG
- LAKESIDE TERRACE - PROPOSED DETAIL SECTION - CATE
- LAKESIDE TERRACE - PROPOSED DETAIL SECTION - PODI
- FOYER - PROPOSED - FACADE DETAILS - LIFT LOBBY BA
- FOYER - PROPOSED - FACADE DETAILS - TRIPLE HEIGHT
- CATERING BLOCK - PROPOSED - FACADE DETAILS - LEVE
- BCRPP1-BHE-XX-XXXX-RP-EC-07002 - ECOLOGICAL IMPACT ASSESSMENT
- 2025-07-10 - BARBICAN RENEWAL PROGRAMME - PHASE 1 HERITAGE STATEMENT - PART 1
- 2025-07-10 - BARBICAN RENEWAL PROGRAMME - PHASE 1 HERITAGE STATEMENT - PART 2
- BARBICANRENEWALPROJECT_CMP_100725
- OUTLINE VENUE MANAGEMENT PLAN JULY 25 - PART 1
- OUTLINE VENUE MANAGEMENT PLAN JULY 25 - PART 2
- BCRPP1-BAR-XX-XXXX-RP-XX-07001 - STATEMENT OF COMMUNITY INVOLVEMENT
- BCRPP1-CHB-ZZ-ZZZZ-RP-AU-07001 - NOISE IMPACT ASSESSMENT - 11 JULY 2025
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.7
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.9_PART1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART1
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART2
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART3
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART4
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART5
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART6
- BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.3
- CONSERVATORY - EXISTING NORTH ELEVATION
- CONSERVATORY - EXISTING NORTH EAST ELEVATION
- CONSERVATORY - EXISTING WEST ELEVATION
- CONSERVATORY - EXISTING WEST ELEVATION INTERNAL
- SITE WIDE - EXISTING SILK STREET ELEVATION
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL
- CONSERVATORY - EXISTING SECTION AA
- CONSERVATORY - EXISTING SECTION BB
- CONSERVATORY-GARDEN ROOM AND TERRACE-CROSS SECT
- CONSERVATORY-GARDEN ROOM AND TERRACE-NORTH ELEV
- STAIRCASE 8 - SHORT SECTIONS
- CONSERVATORY-GARDEN ROOM-NORTH ELEVATION
- CONSERVATORY-GARDEN ROOM-SOUTH ELEVATION
- CONSERVATORY-NURSERY
- CONSERVATORY - ENTRANCE BAY STUDY
- LEVEL 04 FOYER - PROPOSED LEVEL 04 PLAN
- CONSERVATORY - PROPOSED LEVEL 06 FLYTOWER WALK
- BCRPP1-AAM-ZZ-ZZZZ-DR-AR-07002 - LOCATION PLAN - PLANNING PERMISSION
- SITE PLAN - PLANNING PERMISSION
- FOYER - EXISTING LEVEL 00 FLOOR PLAN
- FOYER - EXISTING LEVEL 00 RCP
- FOYER - EXISTING - SECTION - NORTH-SOUTH - 1
- FOYER - EXISTING - SECTION - NORTH-SOUTH - 2
- FOYER - EXISTING - SECTION - NORTH-SOUTH - 3
- FOYER - EXISTING - FACADE BAY STUDY - LIFT LOBBY
- FOYER - EXISTING - FACADE BAY STUDY - MAIN ENTRAN
- FOYER - EXISTING - FACADE BAY STUDY - TRIPLE HEIG
- LEVEL 3 AND 4 FOYER - EXISTING INTERNAL ELEVATI
- LEVEL 3 AND 4 FOYER - PROPOSED INTERNAL ELEVATI
- STAIRCASE 8 - BASEMENT PLANS
- STAIRCASE 8 - LEVEL 01 TO LEVEL 05 PLANS
- FOYER - EXISTING - FACADE BAY STUDY - WESTERN BAY
- CATERING BLOCK - EXISTING LEVELS 00 _ 01 _ 02 FLO
- CATERING BLOCK - EXISTING LEVELS 00 _ 01 _ 02 RCP
- CATERING BLOCK - EXISTING ELEVATIONS
- LAKESIDE TERRACE - EXISTING LEVEL 00 PLAN
- EXISTING SOUTH ELEVATION
- LAKESIDE TERRACE - EXISTING SECTION
- FOYER - FABRIC REMOVAL LEVEL 00 RCP
- FOYER - FABRIC REMOVAL LEVEL 01 FLOOR PLAN
- FOYER - FABRIC REMOVAL LEVEL 01 RCP
- FOYER - FABRIC REMOVAL LEVEL B1 FLOOR PLAN
- FOYER - FABRIC REMOVAL LEVEL B1 RCP
- FOYER - FABRIC REMOVAL LEVEL B1M FLOOR PLAN
- FOYER - FABRIC REMOVAL LEVEL B1M RCP
- FOYER - FABRIC REMOVAL LEVEL B2M RCP
- FOYER - FABRIC REMOVAL SECTION - EAST-WEST - 1
- FOYER - FABRIC REMOVAL SECTION - EAST-WEST - 2
- FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 1
- FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 2
- FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 3
- CATERING BLOCK - FABRIC REMOVAL LEVELS 00 _ 01 _
- CATERING BLOCK - FABRIC REMOVAL LEVELS 00 _01 _ 0
- CATERING BLOCK - FABRIC REMOVAL SECTION
- LAKESIDE TERRACE - FABRIC REMOVAL LEVEL 00 FLOOR
- LAKESIDE TERRACE - FABRIC REMOVAL SECTION
- FOYER - PROPOSED LEVEL 00 FLOOR PLAN
- FOYER - PROPOSED LEVEL 00 RCP
- FOYER - PROPOSED LEVEL 01 FLOOR PLAN
- FOYER - PROPOSED LEVEL 01 RCP
- FOYER - PROPOSED LEVEL B1 FLOOR PLAN
- FOYER - PROPOSED LEVEL B1M FLOOR PLAN
- FOYER - PROPOSED LEVEL B1M RCP
- FOYER - PROPOSED LEVEL B2M FLOOR PLAN
- FOYER - PROPOSED LEVEL B2M RCP
- FOYER - PROPOSED SECTION - EAST-WEST - 1
- FOYER - PROPOSED SECTION - NORTH-SOUTH - 1
- FOYER - PROPOSED SECTION - NORTH-SOUTH - 3
- CATERING BLOCK - PROPOSED LEVELS 00 _ 01 _ 02 FLO
- CATERING BLOCK - PROPOSED LEVELS 00 _ 01 _ 02 RCP
- CATERING BLOCK - PROPOSED ELEVATIONS
- CATERING BLOCK - PROPOSED SECTION
- LAKESIDE TERRACE - PROPOSED LEVEL 00 FLOOR PLAN
- PROPOSED SOUTH ELEVATION
- LAKESIDE TERRACE - PROPOSED SECTION
- FOYER - PROPOSED - FACADE BAY STUDY - LIFT LOBBY
- CATERING BLOCK - PROPOSED - FACADE BAY STUDY - EA
- LAKESIDE TERRACE - PROPOSED LAYOUT - RAMP
- LAKESIDE TERRACE - PROPOSED DETAIL SECTION - FOYE
- FOYER - PROPOSED - FACADE DETAILS - MAIN ENTRANCE
- BCRPP1-ARC-XX-XXXX-SH-AR-07001 - BRP PHASE 1 SUBMISSION DRAWING LIST
- BCRPP1-BHE-XX-XXXX-RP-EN-07001 - AIR QUALITY ASSESSMENT
- BCRPP1-BHE-XX-XXXX-RP-IN-07001 - SURFACE WATER DRAINAGE STRATEGY REPORT
- BCRPP1-BHE-XX-XXXX-RP-SP-07001 - SUSTAINABILITY STATEMENT PART 1
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 8
- BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 9
- FOYER - EXISTING FACADE DETAILS - LIFT LOBBY BAY
- FOYER - EXISTING FACADE DETAILS - MAIN ENTRANCE B
- FOYER - EXISTING FACADE DETAILS - TRIPLE HEIGHT B
- FOYER - EXISTING FACADE DETAILS - WESTERN BAY
- LAKESIDE TERRACE - PROPOSED - TYPICAL PAVING DETA
- CITYAM NEWSPAPER COPY 10.7.25
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 24 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
99% historically approved · decision due ~2 Jul
An application under Section 73 of the Town and Country Planning Act 1990 (as amended) to amend Condition 6 (Approved Documents) of planning permission 22/00942/FULL dated 27 January 2023 to allow for the removal of the approved bulkheads and the insertion of timber louvres.
Awaiting decision Full applications 33 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
100% historically approved · decision due ~2 Jul
An application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary condition 4 of Listed Building Consent 22/00943/LBC dated 27 January 2023 to allow for the removal of the approved bulkheads and the insertion of timber louvres.
Awaiting decision Heritage and listed buildings 32 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary Condition 3 of Listed Building Consent 22/00895/LBC dated 2nd December 2022 to refer to a revised list of drawings amended to reflect design alterations and to discharge Condition 4 relating to detailed design elements of the proposal.
Granted Heritage and listed buildings 46 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Replacement of existing house lighting fixtures within the Theatre with new LED fixtures. Introduction of new fittings to supplement existing lighting in the front rows of the circle, upper circle and gallery.
Granted Heritage and listed buildings 11 docs -
Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
The enlargement of the existing service access panel within the male cubical at level 00, 01 and 02 of the catering block WCs. Temporary installation of an access panel for a maximum of five years following which a permeant terrazzo panel will be installed.
Granted Heritage and listed buildings 11 docs -
Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Submission of an Inclusive Access Strategy; and a Visitor Management Strategy pursuant to conditions 4 and 5 of planning permission 25/00876/FULL dated 12/12/2025.
Granted Conditions 5 docs
Other full applications
In City of London
-
25/01794/FULL Granted
50 Cannon Street London EC4N 6JJ
Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.
-
26/00865/FULL Granted
9 Newbury Street London EC1A 7HU
Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.
-
26/01110/FULL Granted
200 Aldersgate Street London EC1A 4HD
Retrospective application for the installation of 2no. condenser units to fifth floor roof.
-
26/01109/FULL Granted
100 Bishopsgate London EC2N 4AA
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
-
26/01053/FULL Granted
49 Cheapside London EC2V 6AT
Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass