Planning application

Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS

Granted City of London 25/00910/LBC Listed Building Consent

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Works comprising: Conservatory Exterior; replacement of glazing, new louvres, works to frame; enclosure of walkways; new workshop, new planter beds; vents to art gallery roof and shaft face, works to louvres, new lighting; replacement glazing to corridor; replacement of sculpture court rooflight, reglazing to art gallery and WC block; new art gallery doors. Conservatory Interior; new path layout, planting beds and pond; removal of rooflights and works to offices; new structure to terrace and replacement of stair; new stair and lift core adjacent to fly tower; insertion of spiral stair and widening opening; new garden room plant, lighting and flooring; opening to shaft; new doors to conservatory; works to art gallery lighting; upgrades to cloakroom and toilets. External works to Lakeside Terrace and catering block; replacement glazing; lowering of cafe cil; new awnings; new and replacement lighting; facade repairs; works to staircase 8; replacement foyer doors; works to balconies, including levelling and planting; and restoration of fountains. Internal works to the foyers; creation of openings in shafts; lift installation; changes to lighting; installation of LED screens; creation of access hatches to shafts; replacement flooring; replacement and relocation of shop; creation of new WCs and refurbishment of existing; new quiet room; removal of cafe and relocation of bar; additional storage and works to doors at internal roadway, creation of level access in the Curve Gallery and other works to finishes; infill of martini bar hole; new power and data points to shafts; strip out of catering block interiors to shell and core. Other; works to back of house areas including plant rooms, Car Park 3 and 5, and service road to facilitate MEP; enlarged grille in Silk Street pavement; removal and replacement of paving to include waterproofing throughout; other landscaping and regrading works; and other associated works and infrastructure.

As published by the council, reference 25/00910/LBC

Application record

Reference
25/00910/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Approved
Received
14 Jul 2025
Validated
14 Jul 2025
Decided
24 Feb 2026
Ward
Cripplegate
Decision by
Delegated
Postcode
EC2Y 8DS

Site history

Applications at this address on the City of London register

This site has had 3 applications since 2025: 3 approved, 0 refused.

  • 25/00917/FULL Granted

    Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS

    Works to the exterior of the conservatory including removal and replacement of all glazing, new louvres, works to the aluminium frame; enclosure of external portions of upper level walkways; works to the Triangle space to include new gardeners workshop, removal and replacement of all paving with new waterproofing installed below, new planting beds. External works to the Lakeside Terrace and catering block to include: removal and replacement of all paving with new waterproofing below, replacement glazing to the catering block and lakeside facade; lowering of the catering block cafe window cil at ground floor; new awnings to catering block; replacement lighting stands to lakeside edge; replaced lighting to under croft; facade repairs to the lakeside facade and works to staircase 8; works to external doors including fixed glazing to Eastern end and replacement of main foyer doors with single doorset; restoration of fountains. Other external works to include creation of air vents to the art gallery roof and a single shaft face, works to external louvres, new external lighting to the conservatory entrance on Frobisher Crescent. Replacement of sculpture court rooflight, re-glazing to art gallery north and east facade around WC block, new Art gallery foyer entrance doors. Enlarged grille for UKPN substation access in Silk Street pavement; Works to lakeside balconies, including replacement paving and waterproofing below, re-levelling, planting and planters to stair 8. New landscaping and regrading works to sculpture court art gallery foyer and other associated works and infrastructure.

    Decided 24 Feb 2026 Full applications
  • 25/00911/FULL Granted

    Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS

    Application to allow the use of 17 car parking bays of Car Park 3 Level B1 at the Barbican Centre for ancillary storage space.

    Decided 30 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 14 Jul 2025

    Received by City of London

  2. 24 Feb 2026

    Decision issued: Approved

  3. 7 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

The Planning Lab Agent, a planning consultancy

182 applications on PlanIndex · across 15 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

362 documents on file for this application

  • LISTED BUILDING CONSENT (CONDITIONAL) Decision · 24 Feb 2026
  • CONSERVATORY - FABRIC REMOVAL SOUTH EAST ELEVATION Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED GARDEN ROOM & TERRACE ELEVATION Drawing · 15 Jan 2026
  • FOYER - FABRIC REMOVAL ELEVATIONS - NEW LIFT Drawing · 15 Jan 2026
  • FABRIC REMOVAL SOUTH ELEVATION Drawing · 15 Jan 2026
  • CATERING BLOCK - FABRIC REMOVAL ELEVATIONS Drawing · 15 Jan 2026
  • FOYER - PROPOSED - FACADE BAY STUDY - MAIN ENTRANCE BAYS Drawing · 15 Jan 2026
  • FOYER - PROPOSED - FACADE BAY STUDY - WESTERN BAY Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS- FABRIC REMOVAL LEVEL 4 RCP Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 04 PLAN - FLYTOWER WALKWAY Drawing · 15 Jan 2026
  • FOYER - EXISTING ELEVATIONS - NEW LIFT Drawing · 15 Jan 2026
  • FOYER - FABRIC REMOVAL LEVEL 00 FLOOR PLAN Drawing · 15 Jan 2026
  • FOYER - FABRIC REMOVAL LEVEL B2M FLOOR PLAN Drawing · 15 Jan 2026
  • CATERING BLOCK - PROPOSED - FACADE BAY STUDY - SOUTH Drawing · 15 Jan 2026
  • FOYER - PROPOSED SECTION - EAST-WEST - 2 Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 02 Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 03 Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 04 Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 05 Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 06 Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL ROOF PLAN Drawing · 15 Jan 2026
  • CONSERVATORY - FABRIC REMOVAL SOUTH ELEVATION Drawing · 15 Jan 2026
  • LEVEL 3 & 4 FOYER - FABRIC REMOVAL ELEVATIONS Drawing · 15 Jan 2026
  • CONSERVATORY-FABRIC REMOVAL-GARDEN ROOM AND TERRACE Drawing · 15 Jan 2026
  • CONSERVATORY-FABRIC REMOVAL-GARDEN ROOM AND TERRACE ELEVATION Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCP Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCP Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL 3 RCP Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 03 PLAN Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 04 PLAN Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL 05 PLAN Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED SECTION AA Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED SECTION BB Drawing · 15 Jan 2026
  • CONSERVATORY-GARDEN ROOM AND TERRACE-CROSS SECTION Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 03 PLAN - ARRIVAL AREA Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 03 PLAN - CENTRAL POND Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 03 PLAN - GARDEN ROOM Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 03 PLAN - EAST LANDSCAPE Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 03 PLAN- THE TRIANGLE Drawing · 15 Jan 2026
  • LEVEL 03 FOYER-PROPOSED LEVEL 03 PLAN Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 04 PLAN - ARID PROPAGATION Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 05 FLYTOWER WALKWAY Drawing · 15 Jan 2026
  • CONSERVATORY - TERRACE - BAY STUDY 3 OF 6 Drawing · 15 Jan 2026
  • CONSERVATORY - TERRACE - BAY STUDY 4 OF 6 Drawing · 15 Jan 2026
  • FOYER - PROPOSED LAYOUT - LEVEL 0 BRIDGE Drawing · 15 Jan 2026
  • FOYER - PROPOSED LAYOUT - NEW LIFT Drawing · 15 Jan 2026
  • FOYER - PROPOSED LAYOUT - SCREENS Drawing · 15 Jan 2026
  • CATERING BLOCK - PROPOSED - FACADE DETAILS - UPPER LEVELS Drawing · 15 Jan 2026
  • CATERING BLOCK & LIBRARY - PROPOSED - WINDOWS Drawing · 15 Jan 2026
  • PROPOSED SOUTH ELEVATION Drawing · 15 Jan 2026
  • FOYER - PROPOSED LEVEL B1 FLOOR PLAN Drawing · 15 Jan 2026
  • FOYER - PROPOSED SECTION - NORTH-SOUTH - 2 Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED LEVEL 04 PLAN - CONSERVATORY TERRACE Drawing · 15 Jan 2026
  • LEVEL 3 & 4 FOYER - FABRIC REMOVAL ELEVATIONS Drawing · 15 Jan 2026
  • CONSERVATORY - FABRIC REMOVAL NORTH ELEVATION Drawing · 15 Jan 2026
  • CONSERVATORY - FABRIC REMOVAL NORTH EAST ELEVATION Drawing · 15 Jan 2026
  • CONSERVATORY - FABRIC REMOVAL WEST ELEVATION Drawing · 15 Jan 2026
  • CONSERVATORY - FABRIC REMOVAL WEST ELEVATION INTERNAL Drawing · 15 Jan 2026
  • CONSEVATORY - FABRIC REMOVAL SECTION AA Drawing · 15 Jan 2026
  • CONSERVATORY - FABRIC REMOVAL SECTION BB Drawing · 15 Jan 2026
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL LEVEL2 RCP Drawing · 15 Jan 2026
  • CONSERVATORY - PROPOSED SECTION AA Drawing · 15 Jan 2026
  • FOYER - PROPOSED - FACADE DETAILS - WESTERN BAY Drawing · 15 Jan 2026
  • DAS ADDENDUM 19.12.25 Other · 12 Jan 2026
  • BRP, TOILET EQUALITY ANALYSIS Other · 12 Jan 2026
  • EA PAGES IN DAS Other · 12 Jan 2026
  • BRP PHASE 1 TRACKER - DESIGN COMMENTS 18.12.25 Other · 12 Jan 2026
  • BRP PHASE 1 TRACKER - ACCESS COMMENTS 18.12.25 Other · 12 Jan 2026
  • DRAWING LIST_COMMENTS Other · 12 Jan 2026
  • DRAWING LIST Other · 12 Jan 2026
  • LEVEL 0 RAMP OCCUPANCY DRAWING Other · 12 Jan 2026
  • FOYER BRIDGE FOOTFALL - ADDITONAL INFORMATION Other · 12 Jan 2026
  • COMMENTS - LONDON UNDERGROUND Consultee Comment · 23 Sep 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 17 Sep 2025
  • COMMENTS - TWENTIETH CENTURY SOCIETY Consultee Comment · 11 Sep 2025
  • COMMENTS - NATIONAL AMENITY SOCIETY?S Accompanying letters · 14 Aug 2025
  • PROPOSED CAR PARK STORAGE - LEVEL B1 - ELEVATIONS PROPOSED - LAYOUT Drawing · 12 Aug 2025
  • APPLICATIONFORMREDACTED Application Form · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 0 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 1_PART 1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 1_PART 2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 2_PART 3 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART3 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART4 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART5 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART6 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART7 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.2_PART8 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.3 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART3 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART4 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART5 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART6 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.4_PART7 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.5_PART1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.5_PART2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.6_PART3 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.7 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.8 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.9_PART1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 3.9_PART2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 4_5_6 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART3 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART5 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART6 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.3 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.4 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.5_PART 1 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.5_PART 2 Report - Design & Access Statement/Report · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.6_PART 2 Report - Design & Access Statement/Report · 14 Jul 2025
  • COVER LETTER Cover Letter · 14 Jul 2025
  • CONSERVATORY - EXISTING SOUTH EAST ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - EXISTING NORTH ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - EXISTING NORTH EAST ELEVATION Drawing · 14 Jul 2025
  • BCRPP1-ARC-ZZ-ZZZZ-RP-AR-07001_DESIGN AND ACCESS STATEMENT_SECTION 6.2_PART4 Report - Design & Access Statement/Report · 14 Jul 2025
  • LEVEL 3 AND 4 FOYER - EXISTING ELEVATIONS Drawing · 14 Jul 2025
  • CONSERVATORY - EXISTING SOUTH ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL FACADE BASE DETAIL Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL VERTICAL GLAZING DETAILS Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL SLOPED GLAZING DETAIL Drawing · 14 Jul 2025
  • CONSERVATORY - GARDEN ROOM - TYPICAL DETAILS Drawing · 14 Jul 2025
  • CONSERVATORY - FROBISHER CORRIDOR EXISTING TYPI Drawing · 14 Jul 2025
  • CONSERVATORY - FROBISHER CORRIDOR PROPOSED TYPI Drawing · 14 Jul 2025
  • CONSERVATORY - WEST STAIR - TYPICAL DETAILS Drawing · 14 Jul 2025
  • CONSERVATORY - SPIRAL STAIR - TYPICAL DETAILS Drawing · 14 Jul 2025
  • CONSERVATORY - SOUTH STAIR - TYPICAL DETAILS Drawing · 14 Jul 2025
  • CONSERVATORY - EAST STAIR - TYPICAL DETAILS Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL BALUSTRADE TYPE 01 Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL BALUSTRADE TYPE 02 Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL BALUSTRADE TYPE 03 Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL BALUSTRADE TYPE 04 Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED WEST STAIR - TYPICAL PL Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED SPIRAL STAIR - TYPICAL Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED WEST STAIR - TYPICAL EL Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED EAST STAIR - TYPICAL EL Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED SOUTH STAIR - TYPICAL E Drawing · 14 Jul 2025
  • CONSERVATORY-TERRACE-BAY STUDY 1 OF 6 Drawing · 14 Jul 2025
  • CONSERVATORY-TERRACE-BAY STUDY 2 OF 6 Drawing · 14 Jul 2025
  • CONSERVATORY-TERRACE-BAY STUDY 5 OF 6 Drawing · 14 Jul 2025
  • CONSERVATORY-TERRACE-BAY STUDY 6 OF 6 Drawing · 14 Jul 2025
  • CONSERVATORY-GARDEN ROOM-NORTH ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY-GARDEN ROOM-SOUTH ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY-NURSERY Drawing · 14 Jul 2025
  • CONSERVATORY - ENTRANCE BAY STUDY Drawing · 14 Jul 2025
  • CONSERVATORY-GARDEN ROOM-INTERNAL ELEVATIONS Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED LEVEL 03 PLAN- BALCONIE Drawing · 14 Jul 2025
  • LEVEL 04 FOYER - PROPOSED LEVEL 04 PLAN Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED LEVEL 06 FLYTOWER WALK Drawing · 14 Jul 2025
  • BCRPP1-AAM-ZZ-ZZZZ-DR-AR-07001 - LOCATION PLAN - LISTED BUILDING CONSENT Site Plan · 14 Jul 2025
  • SITE PLAN - LISTED BUILDING CONSENT Drawing · 14 Jul 2025
  • BCRPP1-ARC-XX-XXXX-SH-AR-07001 - BRP PHASE 1 SUBMISSION DRAWING LIST Drawings Schedule · 14 Jul 2025
  • FOYER - EXISTING LEVEL 00 FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL 00 RCP Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL 01 FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL 01 RCP Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL B1 FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL B2M RCP Drawing · 14 Jul 2025
  • FOYER - EXISTING - FACADE BAY STUDY - MAIN ENTRAN Drawing · 14 Jul 2025
  • FOYER - EXISTING - FACADE BAY STUDY - TRIPLE HEIG Drawing · 14 Jul 2025
  • FOYER - EXISTING - FACADE BAY STUDY - WESTERN BAY Drawing · 14 Jul 2025
  • CONSERVATORY - EXISTING WEST ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - EXISTING WEST ELEVATION INTERNAL Drawing · 14 Jul 2025
  • SITE WIDE - EXISTING SILK STREET ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING ROOF Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - EXISTING LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY - EXISTING SECTION AA Drawing · 14 Jul 2025
  • CONSERVATORY - EXISTING SECTION BB Drawing · 14 Jul 2025
  • CONSERVATORY-GARDEN ROOM AND TERRACE-CROSS SECT Drawing · 14 Jul 2025
  • CONSERVATORY-GARDEN ROOM AND TERRACE-NORTH ELEV Drawing · 14 Jul 2025
  • HANDLING NOTE Other · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - FABRIC REMOVAL Drawing · 14 Jul 2025
  • INFRASTRUCTURE - PROJECT LOCATIONS Drawing · 14 Jul 2025
  • INFRASTRUCTURE - CENTRAL SERVICES PLANT ROOM PR Drawing · 14 Jul 2025
  • INFRASTRUCTURE - LEVEL B2M PROPOSALS Drawing · 14 Jul 2025
  • INFRASTRUCTURE - LEVEL B1 PROPOSALS Drawing · 14 Jul 2025
  • INFRASTRUCTURE - PROPOSED SHAFT ACCESS IMPROVEM Drawing · 14 Jul 2025
  • INFRASTRUCTURE - SERVICE ROAD PROPOSED SHAFT OP Drawing · 14 Jul 2025
  • INFRASTRUCTURE - WEST SIDE AIR INTAKE PROPOSALS Drawing · 14 Jul 2025
  • INFRASTRUCTURE - EAST SIDE AIR INTAKE PROPOSALS Drawing · 14 Jul 2025
  • INFRASTRUCTURE - EAST SIDE AIR INTAKE PROPOSALS Drawing · 14 Jul 2025
  • INFRASTRUCTURE - ANCILLARY PLANT SPACE PROPOSAL Drawing · 14 Jul 2025
  • LEVEL 03 FOYER - TYPICAL EXISTING FACADE DETAIL Drawing · 14 Jul 2025
  • LEVEL 03 FOYER - TYPICAL PROPOSED FACADE DETAIL Drawing · 14 Jul 2025
  • LEVEL 03 AND 04 FOYER - TYPICAL NORTH GLAZING D Drawing · 14 Jul 2025
  • LEVEL 04 FOYER - TYPICAL ROOFLIGHT DETAIL Drawing · 14 Jul 2025
  • SCULPTURE COURT - TYPICAL EXISTING ROOFLIGHT DE Drawing · 14 Jul 2025
  • SCULPTURE COURT - TYPICAL PROPOSED ROOFLIGHT DE Drawing · 14 Jul 2025
  • CONSERVATORY - TERRACE - TYPICAL FACADE Drawing · 14 Jul 2025
  • CONSERVATORY - TERRACE - TYPICAL SECTION Drawing · 14 Jul 2025
  • CONSERVATORY-TERRACE-TYPICAL SECTION Drawing · 14 Jul 2025
  • CONSERVATORY - INFILL GLAZING TYPICAL PLAN DETA Drawing · 14 Jul 2025
  • CONSERVATORY - INFILL GLAZING TYPICAL SECTION D Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL LANDSCAPE SECTION Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL SEATING AREA DETAIL Drawing · 14 Jul 2025
  • CONSERVATORY - TYPICAL PLANTER DETAIL Drawing · 14 Jul 2025
  • CONSERVATORY - SHAFT OPENINGS Drawing · 14 Jul 2025
  • STAIRCASE 8 - TYPICAL DETAILS Drawing · 14 Jul 2025
  • LEVEL 3 AND 4 FOYER - PROPOSED ELEVATIONS Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED SOUTH ELEVATION Superseded drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED SOUTH EAST ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED NORTH ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED NORTH EAST ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED WEST ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED WEST ELEVATION INTERNAL Drawing · 14 Jul 2025
  • SITE WIDE - PROPOSED SILK STREET ELEVATION Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - PROPOSED ROOF Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL Drawing · 14 Jul 2025
  • CONSERVATORY AND UPPER FOYERS - PROPOSED LEVEL Drawing · 14 Jul 2025
  • LEVEL 3 AND 4 FOYER - EXISTING INTERNAL ELEVATI Drawing · 14 Jul 2025
  • LEVEL 3 AND 4 FOYER - PROPOSED INTERNAL ELEVATI Drawing · 14 Jul 2025
  • STAIRCASE 8 - BASEMENT PLANS Drawing · 14 Jul 2025
  • STAIRCASE 8 - LEVEL 01 TO LEVEL 05 PLANS Drawing · 14 Jul 2025
  • STAIRCASE 8 - LONG SECTIONS Drawing · 14 Jul 2025
  • STAIRCASE 8 - SHORT SECTIONS Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED SPIRAL STAIR - TYPICAL Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED WEST STAIR - TYPICAL PL Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED EAST STAIR - TYPICAL PL Drawing · 14 Jul 2025
  • CONSERVATORY - PROPOSED SOUTH STAIR - TYPICAL P Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL B1 RCP Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL B1M FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL B1M RCP Drawing · 14 Jul 2025
  • FOYER - EXISTING LEVEL B2M FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - EXISTING DETAILS - TYPICAL SHAFT OPENINGS Drawing · 14 Jul 2025
  • FOYER - EXISTING DETAILS - TYPICAL SHAFT OPENINGS Drawing · 14 Jul 2025
  • FOYER - EXISTING ELEVATIONS - SHAFT 15 Drawing · 14 Jul 2025
  • FOYER - EXISTING ELEVATIONS - SHAFT 16 Drawing · 14 Jul 2025
  • FOYER - EXISTING ELEVATIONS - SHAFT 18 Drawing · 14 Jul 2025
  • FOYER - EXISTING ELEVATIONS - SHAFT 26 Drawing · 14 Jul 2025
  • FOYER - EXISTING DETAILS - TYPICAL CAST IN SHAFT Drawing · 14 Jul 2025
  • FOYER - EXISTING FACADE DETAILS - LIFT LOBBY BAY Drawing · 14 Jul 2025
  • FOYER - EXISTING FACADE DETAILS - MAIN ENTRANCE B Drawing · 14 Jul 2025
  • FOYER - EXISTING FACADE DETAILS - TRIPLE HEIGHT B Drawing · 14 Jul 2025
  • FOYER - EXISTING FACADE DETAILS - WESTERN BAY Drawing · 14 Jul 2025
  • FOYER - EXISTING - SECTION - EAST-WEST - 1 Drawing · 14 Jul 2025
  • FOYER - EXISTING - SECTION - EAST-WEST - 2 Drawing · 14 Jul 2025
  • FOYER - EXISTING - SECTION - NORTH-SOUTH - 1 Drawing · 14 Jul 2025
  • FOYER - EXISTING - SECTION - NORTH-SOUTH - 2 Drawing · 14 Jul 2025
  • FOYER - EXISTING - SECTION - NORTH-SOUTH - 3 Drawing · 14 Jul 2025
  • FOYER - EXISTING - FACADE BAY STUDY - LIFT LOBBY Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING LEVELS 00 _ 01 _ 02 RCP Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING ELEVATIONS Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING FACADE DETAILS Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING FACADE DETAILS - UPPER Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING SECTION Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING - FACADE BAY STUDY - SO Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL 00 RCP Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL 01 FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL 01 RCP Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 1 Drawing · 14 Jul 2025
  • CATERING BLOCK - FABRIC REMOVAL SECTION Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - FABRIC REMOVAL LEVEL 00 FLOOR Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - FABRIC REMOVAL SECTION Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL 00 FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL 00 RCP Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING LEVELS 00 _ 01 _ 02 FLO Drawing · 14 Jul 2025
  • CATERING BLOCK AND LIBRARY - EXISTING FACADE DETA Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - EXISTING SECTION Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL B1 FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL B1 RCP Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL B1M FLOOR PLAN Superseded drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL B1M RCP Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL LEVEL B2M RCP Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL SECTION - EAST-WEST - 1 Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL 01 FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL 01 RCP Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL B1 RCP Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL B1M FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL B1M RCP Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL B2M FLOOR PLAN Drawing · 14 Jul 2025
  • FOYER - PROPOSED LEVEL B2M RCP Drawing · 14 Jul 2025
  • FOYER - PROPOSED SECTION - NORTH-SOUTH - 3 Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED LEVELS 00 _ 01 _ 02 FLO Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED LEVELS 00 _ 01 _ 02 RCP Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED ELEVATIONS Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED SECTION Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - PROPOSED LEVEL 00 FLOOR PLAN Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - PROPOSED SECTION Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL 0 WC AND SHOP Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL 0 WC ELEVATIONS Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - NEW GLAZED PARTITIONS Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL 0 BAR Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL 01 WC Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL B1 WC Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL B1 FUNCTION ROOM Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL B1 BAR Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL B1 CLOAKROOM Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - MARTINI BAR AND WELCOME Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL B1M FUNCTION ROOM Drawing · 14 Jul 2025
  • FOYER - PROPOSED LAYOUT - LEVEL B2M WCS Drawing · 14 Jul 2025
  • FOYER - PROPOSED - FACADE BAY STUDY - LIFT LOBBY Drawing · 14 Jul 2025
  • FOYER - PROPOSED - FACADE BAY STUDY - TRIPLE HEIG Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED - FACADE BAY STUDY - EA Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED LAYOUT - GOODS LIFT Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED LAYOUT - TYPICAL WC Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - PROPOSED LAYOUT - RAMP Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - PROPOSED DETAIL SECTION - FOYE Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - PROPOSED DETAIL SECTION - CATE Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - PROPOSED DETAIL SECTION - PODI Drawing · 14 Jul 2025
  • FOYER - PROPOSED DETAILS - CURVE GALLERY FLOOR Drawing · 14 Jul 2025
  • PROPOSED - FOYER DETAILS - CURVE GALLERY WALL Drawing · 14 Jul 2025
  • FOYER - PROPOSED DETAIS - TYPICAL DETAILS Drawing · 14 Jul 2025
  • FOYER - PROPOSED DETAILS - L0 SHOP SCREEN Drawing · 14 Jul 2025
  • FOYER - PROPOSED DETAILS - B1M FUNCTION ROOM SCR Drawing · 14 Jul 2025
  • FOYER - PROPOSED DETAILS - TYPICAL CAST IN SHAFT Drawing · 14 Jul 2025
  • FOYER - PROPOSED ELEVATIONS - SHAFT 15 Drawing · 14 Jul 2025
  • FOYER - PROPOSED ELEVATIONS - SHAFT 16 Drawing · 14 Jul 2025
  • FOYER - PROPOSED ELEVATIONS - SHAFT 18 Drawing · 14 Jul 2025
  • FOYER - PROPOSED ELEVATIONS - SHAFT 26 Drawing · 14 Jul 2025
  • FOYER - PROPOSED - FACADE DETAILS - LIFT LOBBY BA Drawing · 14 Jul 2025
  • CATERING BLOCK - EXISTING - FACADE BAY STUDY - EA Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - EXISTING LEVEL 00 PLAN Drawing · 14 Jul 2025
  • EXISTING SOUTH ELEVATION Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL SECTION - EAST-WEST - 2 Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL S - COPY Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 2 Drawing · 14 Jul 2025
  • FOYER - FABRIC REMOVAL SECTION - NORTH-SOUTH - 3 Drawing · 14 Jul 2025
  • CATERING BLOCK - FABRIC REMOVAL LEVELS 00 _ 01 _ Drawing · 14 Jul 2025
  • CATERING BLOCK - FABRIC REMOVAL LEVELS 00 _ 01 _ Drawing · 14 Jul 2025
  • FOYER - PROPOSED SECTION - EAST-WEST - 1 Drawing · 14 Jul 2025
  • FOYER - PROPOSED SECTION - EAST-WEST - 2 Drawing · 14 Jul 2025
  • FOYER - PROPOSED SECTION - NORTH-SOUTH - 1 Drawing · 14 Jul 2025
  • FOYER - PROPOSED - FACADE DETAILS - MAIN ENTRANCE Drawing · 14 Jul 2025
  • FOYER - PROPOSED - FACADE DETAILS - TRIPLE HEIGHT Drawing · 14 Jul 2025
  • FOYER - PROPOSED DETAILS - TYPICAL BALUSTRADING Drawing · 14 Jul 2025
  • CATERING BLOCK - PROPOSED - FACADE DETAILS - LEVE Superseded drawing · 14 Jul 2025
  • CATERING BLOCK AND LIBRARY - PROPOSED - FACADE DE Drawing · 14 Jul 2025
  • LAKESIDE TERRACE - PROPOSED - TYPICAL PAVING DETA Drawing · 14 Jul 2025
  • 2025-07-10 - BARBICAN RENEWAL PROGRAMME - PHASE 1 HERITAGE STATEMENT - PART 1 Accompanying report · 14 Jul 2025
  • 2025-07-10 - BARBICAN RENEWAL PROGRAMME - PHASE 1 HERITAGE STATEMENT - PART 2 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 1 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 2 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 3 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 4 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 5 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 6 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 7 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 8 Accompanying report · 14 Jul 2025
  • BCRPP1-LEC-ZZ-ZZZZ-RP-LG-07001 1 - LIGHTING STRATEGY PART 9 Accompanying report · 14 Jul 2025
  • BCRPP1-BHE-XX-XXXX-RP-EE-07001 - LIGHTING (BACK OF HOUSE) REPORT Other · 14 Jul 2025
  • CITYAM NEWSPAPER COPY 10.7.25 Other · 14 Jul 2025
  • BRP PLANNING STATEMENT Report - Planning Statement/Report · 14 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 24 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    23/00672/FULL Submitted 27 Jun 2023 50 yards away

    99% historically approved · decision due ~2 Jul

    An application under Section 73 of the Town and Country Planning Act 1990 (as amended) to amend Condition 6 (Approved Documents) of planning permission 22/00942/FULL dated 27 January 2023 to allow for the removal of the approved bulkheads and the insertion of timber louvres.

    Awaiting decision Full applications 33 docs
  • Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    23/00675/LBC Submitted 27 Jun 2023 50 yards away

    100% historically approved · decision due ~2 Jul

    An application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary condition 4 of Listed Building Consent 22/00943/LBC dated 27 January 2023 to allow for the removal of the approved bulkheads and the insertion of timber louvres.

    Awaiting decision Heritage and listed buildings 32 docs
  • Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    25/01071/LBC Submitted 5 Aug 2025 50 yards away

    Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary Condition 3 of Listed Building Consent 22/00895/LBC dated 2nd December 2022 to refer to a revised list of drawings amended to reflect design alterations and to discharge Condition 4 relating to detailed design elements of the proposal.

    Granted Heritage and listed buildings 46 docs
  • Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    23/01363/LBC Submitted 12 Dec 2023 50 yards away

    Replacement of existing house lighting fixtures within the Theatre with new LED fixtures. Introduction of new fittings to supplement existing lighting in the front rows of the circle, upper circle and gallery.

    Granted Heritage and listed buildings 11 docs
  • Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    24/01119/LBC Submitted 18 Oct 2024 50 yards away

    The enlargement of the existing service access panel within the male cubical at level 00, 01 and 02 of the catering block WCs. Temporary installation of an access panel for a maximum of five years following which a permeant terrazzo panel will be installed.

    Granted Heritage and listed buildings 11 docs
  • Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS

    25/01790/MDC Submitted 22 Dec 2025 50 yards away

    Submission of an Inclusive Access Strategy; and a Visitor Management Strategy pursuant to conditions 4 and 5 of planning permission 25/00876/FULL dated 12/12/2025.

    Granted Conditions 5 docs

In City of London

  • 24/01057/LBC Withdrawn

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Installation of 2x lanterns with hub branding and one internally illuminated sign.

    Received 2 Oct, published by the council 21 Oct 2026 Heritage and listed buildings
  • 26/01222/LBC Granted

    Rising Sun Public House 61 Carter Lane London EC4V 5DY

    Installation of 2no. eyebolt fixings to northern elevation to hold catenary wires to facilitate festive lighting and decoration displays

    Received 27 Aug, published by the council 8 Sep 2026 Heritage and listed buildings
  • 26/01179/LBC Granted

    Shaws Booksellers Public House 31 - 34 St Andrew's Hill London EC4V 5DE

    Alterations to a Listed building including: (i) installation of externally illuminated fascia signage, projecting signage and menu signs (ii) installation of nine awnings.

    Received 17 Aug, published by the council 26 Aug 2026 Heritage and listed buildings
  • 26/01167/LBC Granted

    4 Frederick's Place London EC2R 8AB

    1 x wall mounted non illuminated polished brass plaque.

    Received 13 Aug, published by the council 19 Aug 2026 Heritage and listed buildings
  • 26/00489/LBC Granted

    391 Cromwell Tower Barbican London EC2Y 8NB

    Replacement of timber service door with an aluminium framed glazed door at penthouse levels 39 - 40.

    Received 2 Apr, published by the council 24 Jul 2026 Heritage and listed buildings