Skip to content
PlanIndex Get alerts
Menu

Planning application

St Clements House 27 Clement's Lane London EC4N 7AE

Granted City of London 25/00744/LBC Listed Building Consent

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Works of repair, refurbishment, internal and external alterations of the existing building, vertical extension to create additional levels plus roof level plant enclosure and all enabling works associated with the development and a change of use from Office (Class E(g) to Hotel (Class C1).

As published by the council, reference 25/00744/LBC

Application record

Reference
25/00744/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Approved
Received
5 Jun 2025
Validated
17 Jun 2025
Decided
23 Dec 2025
Ward
Candlewick
Decision by
Delegated
Postcode
EC4N 7AE

Site history

Applications at this address on the City of London register

This site has had 5 applications since 2025: 5 approved, 0 refused.

  • 26/00895/LDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission of details of comprehensive scheme of development including details of an appropriately qualified professional specialising in window renovation pursuant to condition 3 of Listed Building Consent 25/00744/LBC dated 23.12.2025.

    Decided 10 Aug 2026 Lawful development
  • 26/00744/MDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission of details of Pre-deconstruction Report pursuant to condition 22(a) of Planning Permission 25/00743/FULMAJ dated 23.12.2025.

    Decided 24 Jun 2026
  • 26/00708/MDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission Construction Environmental Management Plan and Construction Management Plan pursuant to discharge of condition 9 of planning permission 25/00743/FULMAJ dated 23.12.2025.

    Decided 10 Aug 2026
  • 26/00684/LDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission of Historic Fabric Protection Scheme pursuant to condition 5 and Construction Methodology Statement pursuant to Condition 6 of planning permission 25/00744/LBC dated 23.12.2025.

    Decided 23 Jun 2026 Lawful development

Timeline

Dates from the published record

  1. 5 Jun 2025

    Received by City of London

  2. 17 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Dec 2025

    Decision issued: Approved

  4. 7 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

2 later applications on the register refer to this one:

  • 26/00895/LDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission of details of comprehensive scheme of development including details of an appropriately qualified professional specialising in window renovation pursuant to condition 3 of Listed Building Consent 25/00744/LBC dated 23.12.2025.

    Decided 10 Aug 2026 Lawful development
  • 26/00684/LDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission of Historic Fabric Protection Scheme pursuant to condition 5 and Construction Methodology Statement pursuant to Condition 6 of planning permission 25/00744/LBC dated 23.12.2025.

    Decided 23 Jun 2026 Lawful development
  • Application: 25/00743/FULMAJ (Decided)

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,604 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Chart Forte (Monument) Ltd Applicant, registered in Harrow

Active · incorporated 2022 · Harrow

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

121 documents on file for this application

  • LISTED BUILDING CONSENT (CONDITIONAL) Decision · 23 Dec 2025
  • OFFICER'S REPORT Officers Report · 11 Dec 2025
  • DRAWING ISSUE SHEET Drawings Schedule · 25 Nov 2025
  • PROPOSED WEST ELEVATION P1 Drawing · 25 Nov 2025
  • PROPOSED SOUTH ELEVATION P1 Drawing · 25 Nov 2025
  • PROPOSED EAST ELEVATION P1 Drawing · 25 Nov 2025
  • PROPOSED PROPOSED ELEVATION P1 Drawing · 25 Nov 2025
  • PROPOSED DRAWINGS P1 Drawings Schedule · 10 Nov 2025
  • PROPOSED EIGHTH-NINTH FLOOR PLAN P1 Drawing · 10 Nov 2025
  • PROPOSED SEVENTH FLOOR PLAN P1 Drawing · 10 Nov 2025
  • PROPOSED FIFTH FLOOR PLAN P1 Drawing · 10 Nov 2025
  • PROPOSED FOURTH FLOOR PLAN P1 Drawing · 10 Nov 2025
  • PROPOSED THIRD FLOOR PLAN P1 Drawing · 10 Nov 2025
  • PROPOSED SECOND FLOOR PLAN P1 Drawing · 10 Nov 2025
  • PROPOSED FIRST FLOOR PLAN P1 Drawing · 10 Nov 2025
  • PROPOSED LOWER GROUND FLOOR PLAN P1 Drawing · 10 Nov 2025
  • COMMENTS - THE SOCIETY FOR THE PROTECTION OF ANCIENT BUILDINGS Consultee Comment · 11 Aug 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 29 Jul 2025
  • COMMENTS - HISTORIC BUILDINGS AND PALACES Consultee Comment · 09 Jul 2025
  • COMMENTS-HISTORIC ENGLAND Consultee Comment · 08 Jul 2025
  • COMMENTS-HISTORIC ENGLAND Consultee Comment · 08 Jul 2025
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT Accompanying report · 07 Jul 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 03 Jul 2025
  • COMMENTS - NATIONAL AMENITY SOCIETY?S Consultee Comment · 18 Jun 2025
  • NOISE IMPACT ASSESSMENT Report - Acoustic/Noise Report · 12 Jun 2025
  • APPLICATIONFORMREDACTED Application Form · 05 Jun 2025
  • OUTLINE CONSTRUCTION MANAGEMENT PLAN Accompanying report · 05 Jun 2025
  • PRELIMINARY ECOLOGICAL ASSESSMENT Accompanying report · 05 Jun 2025
  • BREEAM PRE ASSESSMENT REPORT Accompanying report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - OFFICE USE FINANCIAL VIABILITY ASSESSMENT 13.02.25 Accompanying report · 05 Jun 2025
  • CL705-TML-ZZ-ZZ-RP-L-0001-P04-LANDSCAPE STATEMENT LR Other · 05 Jun 2025
  • D01 TRANSPORT STATEMENT Report - Transport Statement/Report · 05 Jun 2025
  • D3 DRAFT TRAVEL PLAN Report - Travel Plan · 05 Jun 2025
  • D04 DELIVERY AND SERVICING MANAGEMENT PLAN Other · 05 Jun 2025
  • DLSL LETTER - 27-28 CLEMENTS LANE - 280225 Other · 05 Jun 2025
  • AIR QUALITY REPORT Other · 05 Jun 2025
  • ARCHAEOLOGY DBA Other · 05 Jun 2025
  • VOLT_27-28CLEMENTSLANE_ECON STATEMENT_ISSUE140525 Other · 05 Jun 2025
  • FLOOD RISK ASSESSMENT Accompanying report · 05 Jun 2025
  • SUSTAINABLE DRAINAGE STRATEGY Accompanying report · 05 Jun 2025
  • FINAL -CLEMENTS LANE SCI_COMPRESSED Other · 05 Jun 2025
  • A-000-001 SITE LOCATION PLAN P0 (1) Site Plan · 05 Jun 2025
  • EXISTING SITE PLAN Site Plan · 05 Jun 2025
  • EXISTING BASEMENT FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING ROOF PLAN Drawing · 05 Jun 2025
  • EXISTING NORTH-WEST ELEVATION Drawing · 05 Jun 2025
  • EXISTING NORTH-EAST ELEVATION Drawing · 05 Jun 2025
  • EXISTING SOUTH-EAST ELEVATION Drawing · 05 Jun 2025
  • EXISTING SOUTH-WEST ELEVATION Drawing · 05 Jun 2025
  • EXISTING SECTION A-A Drawing · 05 Jun 2025
  • EXISTING SECTION B-B Drawing · 05 Jun 2025
  • EXISTING SECTION C-C Drawing · 05 Jun 2025
  • EXISTING LOWER GROUND FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING GROUND FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING FIRST FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING SECOND FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING THIRD FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING FOURTH FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING FIFTH FLOOR PLAN Drawing · 05 Jun 2025
  • CLEMENTS LANE PLANNING STATEMENT Report - Planning Statement/Report · 05 Jun 2025
  • CLEMENTS LANE COVER LETTER Cover Letter · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 05 - ACCESSIBILITY Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 06 - TRANSPORT AND SERVICING Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 07 - FIRE STRATEGY Accompanying report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 2-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 3-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 4-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 03 - CONSULTATION Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.1 - ACTIVE FRONTAGE Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.2 - HERITAGE APPROACH Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.3 - WINDOW STRATEGY Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.4 - LOWER GROUND FLOOR GUESTROOM ACCOMMODATION Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 01 - INTRODUCTION Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 1-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.5 - SCHEDULE OF WORKS 1-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.5 - SCHEDULE OF WORKS 2-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.6 - PROPOSED ROOFSCAPE 1-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.6 - PROPOSED ROOFSCAPE 2-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.7 - SUSTAINABILITY APPROACH Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.8 - PROPOSAL IN CONTEXT Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.9 - CARBON OPTIONEERING Report - Design & Access Statement/Report · 05 Jun 2025
  • DEMOLITION - SECTION B-B Drawing · 05 Jun 2025
  • FIFTH FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • FOURTH FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • LG DEMO PLAN Drawing · 05 Jun 2025
  • PROPOSED BASEMENT DEMOLITION PLAN P0 Drawing · 05 Jun 2025
  • FIRST FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED DEMOLITION - EAST ELEVATION Drawing · 05 Jun 2025
  • NORTH ELEVATION DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED DEMOLITION - SECTION A-A Drawing · 05 Jun 2025
  • PROPOSED DEMOLITION - SECTION C-C Drawing · 05 Jun 2025
  • SOUTH ELEVATION DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED DEMOLITION - WEST ELEVATION Drawing · 05 Jun 2025
  • GF DEMO PLAN (1) Drawing · 05 Jun 2025
  • ROOF DEMO PLAN Drawing · 05 Jun 2025
  • SECOND FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • THIRD FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED NORTH ELEVATION P0 Superseded drawing · 05 Jun 2025
  • PROPOSED EAST ELEVATION P0 Superseded drawing · 05 Jun 2025
  • PROPOSED SOUTH ELEVATION P0 Superseded drawing · 05 Jun 2025
  • PROPOSED SECTION A-A P0 Drawing · 05 Jun 2025
  • PROPOSED SECTION B-B P0 Drawing · 05 Jun 2025
  • PROPOSED SECTION C-C P0 Drawing · 05 Jun 2025
  • PROPOSED BASEMENT PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED LOWER GROUND FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED GROUND FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED FIRST FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED SECOND FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED THIRD FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED FOURTH FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED FIFTH FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED SIXTH FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED SEVENTH FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED EIGHTH-NINTH FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED ROOF PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED WEST ELEVATION P0 Superseded drawing · 05 Jun 2025
  • PROPOSED AREA SCHEDULE P0 Drawing · 05 Jun 2025
  • A-700-003 PROPOSED GUESTROOM NIA SCHEDULE P0 Other · 05 Jun 2025
  • PROPOSED ACCOMMODATION SCHEDULE P0 Drawing · 05 Jun 2025
  • CIL FORM 1 Other · 05 Jun 2025
  • ENERGY STRATEGY REPORT REV_ Accompanying report · 05 Jun 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 23 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • St Clements House 27 & 28 Clement's Lane London EC4N 7AE

    25/00743/FULMAJ Submitted 5 Jun 2025 50 yards away

    Works of repair, refurbishment, internal and external alterations of the existing building, vertical extension to create additional levels plus roof level plant enclosure and all enabling works associated with the development and a change of use from Office (Class E(g) to Hotel (Class C1).

    Granted Full applications Extension 139 docs
    Major scheme
  • St Clements House 27 Clement's Lane London EC4N 7AE

    26/00708/MDC Submitted 15 May 2026 50 yards away

    Submission Construction Environmental Management Plan and Construction Management Plan pursuant to discharge of condition 9 of planning permission 25/00743/FULMAJ dated 23.12.2025.

    Granted 5 docs
  • 29 Clement's Lane London EC4N 7AE

    26/01046/MDC Submitted 24 Jul 2026 50 yards away

    Submission of details of Demolition Materials Audit pursuant to condition 23 of Planning Permission 25/01381/FULL dated 27.03.2026.

    Granted Demolition 3 docs
  • 29 Clement's Lane London EC4N 7AE

    26/01045/MDC Submitted 24 Jul 2026 50 yards away

    Submission of details of Construction Logistics Plan pursuant to condition 5 of Planning Permission 25/01381/FULL dated 27.03.2026.

    Granted 3 docs
  • St Clements House 27 Clement's Lane London EC4N 7AE

    26/00895/LDC Submitted 23 Jun 2026 50 yards away

    Submission of details of comprehensive scheme of development including details of an appropriately qualified professional specialising in window renovation pursuant to condition 3 of Listed Building Consent 25/00744/LBC dated 23.12.2025.

    Granted Lawful development Windows or glazing 9 docs
  • 29 Clement's Lane London EC4N 7AE

    26/01044/MDC Submitted 24 Jul 2026 50 yards away

    Submission of Site Condition Survey pursuant to discharge of condition 3 of planning permission 25/01381/FULL dated 27.03.2026.

    Granted 4 docs

In City of London

  • 24/01057/LBC Withdrawn

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Installation of 2x lanterns with hub branding and one internally illuminated sign.

    Received 2 Oct, published by the council 21 Oct 2026 Heritage and listed buildings
  • 26/01222/LBC Granted

    Rising Sun Public House 61 Carter Lane London EC4V 5DY

    Installation of 2no. eyebolt fixings to northern elevation to hold catenary wires to facilitate festive lighting and decoration displays

    Received 27 Aug, published by the council 8 Sep 2026 Heritage and listed buildings
  • 26/01179/LBC Granted

    Shaws Booksellers Public House 31 - 34 St Andrew's Hill London EC4V 5DE

    Alterations to a Listed building including: (i) installation of externally illuminated fascia signage, projecting signage and menu signs (ii) installation of nine awnings.

    Received 17 Aug, published by the council 26 Aug 2026 Heritage and listed buildings
  • 26/01167/LBC Granted

    4 Frederick's Place London EC2R 8AB

    1 x wall mounted non illuminated polished brass plaque.

    Received 13 Aug, published by the council 19 Aug 2026 Heritage and listed buildings
  • 26/00489/LBC Granted

    391 Cromwell Tower Barbican London EC2Y 8NB

    Replacement of timber service door with an aluminium framed glazed door at penthouse levels 39 - 40.

    Received 2 Apr, published by the council 24 Jul 2026 Heritage and listed buildings