Granted City of London 25/00743/FULMAJ Full Major Application

Works: Extension Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Works of repair, refurbishment, internal and external alterations of the existing building, vertical extension to create additional levels plus roof level plant enclosure and all enabling works associated with the development and a change of use from Office (Class E(g) to Hotel (Class C1).

As published by the council, reference 25/00743/FULMAJ

Application record

Reference
25/00743/FULMAJ
Type
Full Major Application
Status
Decided
Decision
Granted As published: Approved
Received
5 Jun 2025
Validated
17 Jun 2025
Decided
23 Dec 2025
Ward
Candlewick
Decision by
Delegated
Postcode
EC4N 7AE

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 26/00493/MDC Granted

    St Clements House 27 & 28 Clement's Lane London EC4N 7AE

    Submission of details of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects, Sign up to the NRMM register, Site Condition Survey, details of facilities and methods to accommodate and manage all freight vehicle movements to and from the site during the demolition and construction of the building(s) and a Written Scheme of Investigation pursuant to conditions 8, 14, 18, 19 & 36 part A and B of Planning permission 25/00743/FULMAJ dated 23.12.2025.

    Decided 7 Aug 2026

Timeline

Dates from the published record

  1. 5 Jun 2025

    Received by City of London

  2. 17 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Dec 2025

    Decision issued: Approved

  4. 7 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • 26/00744/MDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission of details of Pre-deconstruction Report pursuant to condition 22(a) of Planning Permission 25/00743/FULMAJ dated 23.12.2025.

    Decided 24 Jun 2026
  • 26/00708/MDC Granted

    St Clements House 27 Clement's Lane London EC4N 7AE

    Submission Construction Environmental Management Plan and Construction Management Plan pursuant to discharge of condition 9 of planning permission 25/00743/FULMAJ dated 23.12.2025.

    Decided 10 Aug 2026
  • 26/00493/MDC Granted

    St Clements House 27 & 28 Clement's Lane London EC4N 7AE

    Submission of details of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects, Sign up to the NRMM register, Site Condition Survey, details of facilities and methods to accommodate and manage all freight vehicle movements to and from the site during the demolition and construction of the building(s) and a Written Scheme of Investigation pursuant to conditions 8, 14, 18, 19 & 36 part A and B of Planning permission 25/00743/FULMAJ dated 23.12.2025.

    Decided 7 Aug 2026
  • Application: 25/00744/LBC (Decided)

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,604 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Chart Forte (Monument) Ltd Applicant, registered in Harrow

Active · incorporated 2022 · Harrow

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

139 documents on file for this application

  • COMPLETED S106 AGREEMENT S106 Agreement · 23 Dec 2025
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 23 Dec 2025
  • INDICATION S278 WORK PLAN Drawing · 22 Dec 2025
  • ENGROSSMENT 106 AGREEMENT S106 Agreement · 22 Dec 2025
  • DRAFT DECISION Other · 22 Dec 2025
  • DRAFT S106 AGREEMENT S106 Agreement · 19 Dec 2025
  • OFFICER'S REPORT Officers Report · 11 Dec 2025
  • AIR QUALITY EXPOSURE ASSESSMENT Accompanying report · 03 Dec 2025
  • PROPOSED NORTH ELEVATION P1 Drawing · 25 Nov 2025
  • PROPOSED WEST ELEVATION P1 Drawing · 25 Nov 2025
  • DRAWING ISSUE SHEET Drawing · 25 Nov 2025
  • PROPOSED SOUTH ELEVATION P1 Drawing · 25 Nov 2025
  • PROPOSED EAST ELEVATION P1 Drawing · 25 Nov 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 20 Nov 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 20 Nov 2025
  • PROPOSED LOWER GROUND FLOOR PLAN Drawing · 10 Nov 2025
  • PROPOSED FIRST FLOOR PLAN Drawing · 10 Nov 2025
  • PROPOSED SECOND FLOOR PLAN Drawing · 10 Nov 2025
  • PROPOSED THIRD FLOOR PLAN Drawing · 10 Nov 2025
  • PROPOSED FOURTH FLOOR PLAN Drawing · 10 Nov 2025
  • PROPOSED EIGHTH-NINTH FLOOR PLAN Drawing · 10 Nov 2025
  • PROPOSED SEVENTH FLOOR PLAN Drawing · 10 Nov 2025
  • PROPOSED FIFTH FLOOR PLAN Drawing · 10 Nov 2025
  • DRAWING REGISTER & ISSUE SHEET Drawings Schedule · 10 Nov 2025
  • REPRESENTATION - KIERAN GAIR Public Comment · 22 Oct 2025
  • INDICATIVE S278 WORKS PLAN Drawing · 21 Oct 2025
  • QUERIES TRACKER Other · 24 Sep 2025
  • ENERGY STRATEGY REPORT Accompanying report · 24 Sep 2025
  • COMMENTS - THAMES WATER Consultee Comment · 15 Sep 2025
  • CLIMATE CHANGE RESILIENCE SUSTAINABILITY STATEMENT Accompanying report · 24 Jul 2025
  • STUDIO MOREN RESPONSES TO COL COMMENTS ON CCRSS Correspondence In · 24 Jul 2025
  • COMMENTS - TFL Consultee Comment · 18 Jul 2025
  • COMMENTS - HISTORIC BUILDING & PLACES Consultee Comment · 09 Jul 2025
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT Accompanying report · 07 Jul 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 03 Jul 2025
  • COMMENTS - NATIONAL AMENITY SOCIETY?S Consultee Comment · 18 Jun 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 17 Jun 2025
  • WHOLE LIFECYCLE CARBON ASSESSMENT Accompanying report · 16 Jun 2025
  • CIRCULAR ECONOMY STATEMENT Accompanying report · 16 Jun 2025
  • CLIMATE CHANGE RESILIENCE SUSTAINABILITY STATEMENT Accompanying report · 16 Jun 2025
  • SUSTAINABILITY STATEMENT Accompanying report · 16 Jun 2025
  • NOISE IMPACT ASSESSMENT Report - Acoustic/Noise Report · 12 Jun 2025
  • APPLICATIONFORMREDACTED Application Form · 05 Jun 2025
  • OUTLINE CONSTRUCTION MANAGEMENT PLAN Accompanying report · 05 Jun 2025
  • PRELIMINARY ECOLOGICAL ASSESSMENT Accompanying report · 05 Jun 2025
  • BREEAM PRE ASSESSMENT REPORT Accompanying report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - OFFICE USE FINANCIAL VIABILITY ASSESSMENT 13.02.25 Accompanying report · 05 Jun 2025
  • CL705-TML-ZZ-ZZ-RP-L-0001-P04-LANDSCAPE STATEMENT LR Accompanying report · 05 Jun 2025
  • D01 TRANSPORT STATEMENT Report - Transport Statement/Report · 05 Jun 2025
  • D3 DRAFT TRAVEL PLAN Report - Travel Plan · 05 Jun 2025
  • D04 DELIVERY AND SERVICING MANAGEMENT PLAN Other · 05 Jun 2025
  • DLSL LETTER - 27-28 CLEMENTS LANE - 280225 Other · 05 Jun 2025
  • AIR QUALITY REPORT Accompanying report · 05 Jun 2025
  • ARCHAEOLOGY DBA Accompanying report · 05 Jun 2025
  • R1 ISSUE 2 - CLEMENT LANE - PLANNING FIRE STATEMENT FORM Accompanying report · 05 Jun 2025
  • VOLT_27-28CLEMENTSLANE_ECON STATEMENT_ISSUE140525 Accompanying report · 05 Jun 2025
  • A-000-001 SITE LOCATION PLAN P0 (1) Site Plan · 05 Jun 2025
  • PROPOSED DEMOLITION - WEST ELEVATION Drawing · 05 Jun 2025
  • GF DEMO PLAN (1) Drawing · 05 Jun 2025
  • ROOF DEMO PLAN Drawing · 05 Jun 2025
  • SECOND FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • THIRD FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED NORTH ELEVATION P0 Superseded drawing · 05 Jun 2025
  • PROPOSED EAST ELEVATION P0 Superseded drawing · 05 Jun 2025
  • PROPOSED SOUTH ELEVATION P0 Superseded drawing · 05 Jun 2025
  • PROPOSED SECTION A-A P0 Superseded drawing · 05 Jun 2025
  • PROPOSED BASEMENT PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED LOWER GROUND FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • FLOOD RISK ASSESSMENT Accompanying report · 05 Jun 2025
  • SUSTAINABLE DRAINAGE STRATEGY Accompanying report · 05 Jun 2025
  • FINAL -CLEMENTS LANE SCI_COMPRESSED Other · 05 Jun 2025
  • EXISTING SITE PLAN Drawing · 05 Jun 2025
  • EXISTING BASEMENT FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING ROOF PLAN Drawing · 05 Jun 2025
  • EXISTING NORTH-WEST ELEVATION Drawing · 05 Jun 2025
  • EXISTING NORTH-EAST ELEVATION Drawing · 05 Jun 2025
  • EXISTING SOUTH-EAST ELEVATION Drawing · 05 Jun 2025
  • EXISTING SOUTH-WEST ELEVATION Drawing · 05 Jun 2025
  • EXISTING SECTION A-A Drawing · 05 Jun 2025
  • EXISTING SECTION B-B Drawing · 05 Jun 2025
  • EXISTING SECTION C-C Drawing · 05 Jun 2025
  • EXISTING LOWER GROUND FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING GROUND FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING FIRST FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING SECOND FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING THIRD FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING FOURTH FLOOR PLAN Drawing · 05 Jun 2025
  • EXISTING FIFTH FLOOR PLAN Drawing · 05 Jun 2025
  • CLEMENTS LANE PLANNING STATEMENT Report - Planning Statement/Report · 05 Jun 2025
  • CLEMENTS LANE COVER LETTER Cover Letter · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 05 - ACCESSIBILITY Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 06 - TRANSPORT AND SERVICING Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 07 - FIRE STRATEGY Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 2-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 3-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 4-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 03 - CONSULTATION Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.1 - ACTIVE FRONTAGE Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.2 - HERITAGE APPROACH Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.3 - WINDOW STRATEGY Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.4 - LOWER GROUND FLOOR GUESTROOM ACCOMMODATION Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 01 - INTRODUCTION Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 02 - CONTEXT ANALYSIS 1-4 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.5 - SCHEDULE OF WORKS 1-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.5 - SCHEDULE OF WORKS 2-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.6 - PROPOSED ROOFSCAPE 1-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.6 - PROPOSED ROOFSCAPE 2-2 Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.7 - SUSTAINABILITY APPROACH Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.8 - PROPOSAL IN CONTEXT Report - Design & Access Statement/Report · 05 Jun 2025
  • 27-28 CLEMENTS LANE - CHAPTER 04.9 - CARBON OPTIONEERING Report - Design & Access Statement/Report · 05 Jun 2025
  • DEMOLITION - SECTION B-B Drawing · 05 Jun 2025
  • FIFTH FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • FOURTH FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • LG DEMO PLAN Drawing · 05 Jun 2025
  • PROPOSED BASEMENT DEMOLITION PLAN P0 Drawing · 05 Jun 2025
  • FIRST FLOOR DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED DEMOLITION - EAST ELEVATION Drawing · 05 Jun 2025
  • NORTH ELEVATION DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED DEMOLITION - SECTION A-A Drawing · 05 Jun 2025
  • PROPOSED DEMOLITION - SECTION C-C Drawing · 05 Jun 2025
  • SOUTH ELEVATION DEMOLITION PLAN Drawing · 05 Jun 2025
  • PROPOSED SECTION B-B P0 Drawing · 05 Jun 2025
  • PROPOSED SECTION C-C P0 Drawing · 05 Jun 2025
  • PROPOSED GROUND FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED FIRST FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • PROPOSED SECOND FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • PROPOSED THIRD FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • PROPOSED FOURTH FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • PROPOSED FIFTH FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • PROPOSED SIXTH FLOOR PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED SEVENTH FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • PROPOSED EIGHTH-NINTH FLOOR PLAN P0 Superseded drawing · 05 Jun 2025
  • PROPOSED ROOF PLAN P0 Drawing · 05 Jun 2025
  • PROPOSED WEST ELEVATION P0 Superseded drawing · 05 Jun 2025
  • A-700-002 PROPOSED AREA SCHEDULE P0 Other · 05 Jun 2025
  • A-700-003 PROPOSED GUESTROOM NIA SCHEDULE P0 Other · 05 Jun 2025
  • A-700-001 PROPOSED ACCOMMODATION SCHEDULE P0 Other · 05 Jun 2025
  • CIL FORM 1 Other · 05 Jun 2025
  • ENERGY STRATEGY REPORT REV_ Accompanying report · 05 Jun 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 23 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • St Clements House 27 Clement's Lane London EC4N 7AE

    25/00744/LBC Submitted 5 Jun 2025 50 yards away

    Works of repair, refurbishment, internal and external alterations of the existing building, vertical extension to create additional levels plus roof level plant enclosure and all enabling works associated with the development and a change of use from Office (Class E(g) to Hotel (Class C1).

    Granted Heritage and listed buildings Extension 121 docs
  • St Clements House 27 Clement's Lane London EC4N 7AE

    26/00708/MDC Submitted 15 May 2026 50 yards away

    Submission Construction Environmental Management Plan and Construction Management Plan pursuant to discharge of condition 9 of planning permission 25/00743/FULMAJ dated 23.12.2025.

    Granted 5 docs
  • 29 Clement's Lane London EC4N 7AE

    26/01046/MDC Submitted 24 Jul 2026 50 yards away

    Submission of details of Demolition Materials Audit pursuant to condition 23 of Planning Permission 25/01381/FULL dated 27.03.2026.

    Granted Demolition 3 docs
  • 29 Clement's Lane London EC4N 7AE

    26/01045/MDC Submitted 24 Jul 2026 50 yards away

    Submission of details of Construction Logistics Plan pursuant to condition 5 of Planning Permission 25/01381/FULL dated 27.03.2026.

    Granted 3 docs
  • St Clements House 27 Clement's Lane London EC4N 7AE

    26/00895/LDC Submitted 23 Jun 2026 50 yards away

    Submission of details of comprehensive scheme of development including details of an appropriately qualified professional specialising in window renovation pursuant to condition 3 of Listed Building Consent 25/00744/LBC dated 23.12.2025.

    Granted Lawful development Windows or glazing 9 docs
  • 29 Clement's Lane London EC4N 7AE

    26/01044/MDC Submitted 24 Jul 2026 50 yards away

    Submission of Site Condition Survey pursuant to discharge of condition 3 of planning permission 25/01381/FULL dated 27.03.2026.

    Granted 4 docs

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications