Skip to content
PlanIndex Get alerts
Menu

Planning application

Bow Bells House 1 Bread Street London EC4M 9BE

Granted City of London 25/00728/FULL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to shopfront to sub-divide the retail unit, including an additional entrance to unit.

As published by the council, reference 25/00728/FULL

Application record

Reference
25/00728/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
3 Jun 2025
Validated
3 Jun 2025
Decided
17 Oct 2025
Ward
Cordwainer
Decision by
Delegated Decision
Postcode
EC4M 9BE

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 25/01410/ADVT Awaiting decision

    Bow Bells House 1 Bread Street London EC4M 9BE

    Installation and display of: (i) one internally illuminated projecting sign measuring 0.59m high by 0.59m wide and displayed 2.61m above ground level located on Bread Street. (ii) one internally illuminated projecting sign measuring 0.59m high by 0.59m wide and displayed 2.61m above ground level located on Watling Street. (iii) one retractable awning measuring 0.80m high by 7.81m wide and displayed 2.75m above ground level located on Watling Street.

    Submitted 14 Oct 2025 Advertising

Timeline

Dates from the published record

  1. 3 Jun 2025

    Received by City of London

  2. 17 Oct 2025

    Decision issued: Approved

  3. 7 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

1,780 applications on PlanIndex · across 174 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

City of London granted permission on 17 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 49 Cheapside London EC2V 6AT

    26/00242/MDC Submitted 13 Feb 2026 0m away

    Submission of details of materials, colour, texture and profile of the Awnings pursuant to condition 2 of Planning permission 25/00774/FULL dated 12.12.2025.

    Granted Conditions 9 docs
  • Bow Bells House 1 Bread Street London EC4M 9BE

    25/01410/ADVT Submitted 14 Oct 2025 0m away

    95% historically approved · decision due ~9 Dec

    Installation and display of: (i) one internally illuminated projecting sign measuring 0.59m high by 0.59m wide and displayed 2.61m above ground level located on Bread Street. (ii) one internally illuminated projecting sign measuring 0.59m high by 0.59m wide and displayed 2.61m above ground level located on Watling Street. (iii) one retractable awning measuring 0.80m high by 7.81m wide and displayed 2.75m above ground level located on Watling Street.

    Awaiting decision Advertising 4 docs
  • 49 Cheapside London EC2V 6AT

    25/00774/FULL Submitted 13 Jun 2025 0m away

    Refurbishment works comprising: (i) the erection of two awnings at ground floor, (ii) landscaping works to the fifth and seventh floor terraces.

    Granted Full applications 29 docs
  • 5 Groveland Court London EC4M 9EH

    26/00119/FULL Submitted 27 Jan 2026 21m away

    Change of use of part ground floor sui generis (bar use) to flexible sui generis bar or Class E(g)(i) office use.

    Granted Full applications 7 docs
  • Units 2 And 3 Bow Bells House 51 Cheapside London EC2V 6AU

    23/00499/ADVT Submitted 15 May 2023 47m away

    Retention of one internally illuminated projecting sign measuring 0.7m high, 0.7m wide, at a height above ground of 2.34m.

    Granted Advertising 13 docs
  • Retail Unit 17 Watling Street London EC4M 9BB

    05/00999/ADVT Submitted 18 Nov 2005 51m away

    Installation and display of (i) one halo illuminated fascia sign measuring 1.2m high by 3m long situated at a height above ground of 2.3m (ii) one internally illuminated projecting sign measuring 0.9m high by 0.35m long situated at a height of 2.3m above ground level.

    Granted Advertising

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications