Skip to content
PlanIndex Get alerts
Menu

Planning application

Liverpool Street Railway Station Liverpool Street London EC2M 7PY

Awaiting decision City of London 25/00474/LBC Listed Building Consent

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Phased development comprising partial demolition of Liverpool Street Station, including (in part) including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; works associated with the construction of a new Over-station development (OSD) reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business), including new station roof, truss and columns (in part), creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; new station and office entrances to Liverpool Street and Bishopsgate; and all other associated listed building works.

As published by the council, reference 25/00474/LBC

Application record

Reference
25/00474/LBC
Type
Listed Building Consent
Status
Under Consideration
Received
8 Apr 2025
Validated
8 Apr 2025
Ward
Bishopsgate
Decision by
Delegated
Postcode
EC2M 7PY

Site history

Applications at this address on the City of London register

This site has had 7 applications since 2022: 6 approved, 0 refused.

  • 25/00901/LBC Granted

    Liverpool Street Railway Station Liverpool Street London EC2M 7PY

    Reconfiguration and rationalisation of advertising displays at London Liverpool Street Station, including the removal of existing sheet paper advertising units and the installation of new digital totems.

    Decided 13 May 2026 Heritage and listed buildings
  • 24/00724/LBC Granted

    Liverpool Street Railway Station Liverpool Street London EC2M 7PY

    Refurbishment of station roof, comprising; the erection of a temporary scaffolding system, replacement of existing late twentieth century roof panels, drainage improvement works, and the refurbishment of the existing replica timber valance.

    Decided 12 Sep 2024 Heritage and listed buildings
  • 23/01271/LBC Granted

    Liverpool Street Railway Station Liverpool Street London EC2M 7PY

    Improvements to the gate line between Platforms 1-10 and reconfiguration of existing Ticket Office and Former First Class Lounge to provide a new Ticket Office and replacement retail space.

    Decided 8 May 2024 Heritage and listed buildings
  • 23/00993/LBC Granted

    Liverpool Street Railway Station Liverpool Street London EC2M 7PY

    Construction of a passenger lift which will provide step-free access between the ground floor and mezzanine levels of Liverpool Street Station.

    Decided 23 Nov 2023 Heritage and listed buildings
  • 22/00827/LBC Granted

    Liverpool Street Railway Station Liverpool Street London EC2M 7PY

    Installation of footfall systems/counters within the south/west concourse at London Liverpool Street Station.

    Decided 24 Nov 2022 Heritage and listed buildings
  • 22/00655/LBC Granted

    Liverpool Street Railway Station Liverpool Street London EC2M 7PY

    Erection of a temporary scaffolding system to facilitate the forthcoming roof replacement at London Liverpool Street Station.

    Decided 27 Sep 2022 Heritage and listed buildings

Timeline

Dates from the published record

  1. 8 Apr 2025

    Received by City of London

  2. 28 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Newmark Gerald Eve LLP Agent, registered in London

Active · incorporated 2008 · London

161 applications on PlanIndex · across 17 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Network Rail Infrastructure Ltd Applicant, registered in London

Active · incorporated 1994 · London

142 applications on PlanIndex · across 43 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

265 documents on file for this application

  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 10 Oct 2026
  • COMMENTS - THE SOCIETY FOR THE PROTECTION OF ANCIENT BUILDINGS Consultee Comment · 15 Sep 2026
  • ANDAZ PROPOSED LOCATION PLAN - LEVEL B1 Drawing · 03 Dec 2025
  • ANDAZ EXISTING LOCATION PLAN - LEVEL B1 Drawing · 03 Dec 2025
  • PROPOSED LOCATION PLAN - LEVEL B1 (LOWER CONCOURSE) Drawing · 03 Dec 2025
  • EXISTING LOCATION PLAN - LEVEL B1 (LOWER CONCOURSE) Drawing · 03 Dec 2025
  • POLICE CALL BOX - PROPOSED LOCATION PLAN Drawing · 03 Dec 2025
  • POLICE CALL BOX - EXISTING LOCATION PLAN Drawing · 03 Dec 2025
  • LONDON SOCIETY OF EAST ANGLICANS WAR MEMORIAL - PROPOSED LOCATION PLAN Drawing · 03 Dec 2025
  • LONDON SOCIETY OF EAST ANGLICANS WAR MEMORIAL - EXISTING LOCATION PLAN Drawing · 03 Dec 2025
  • GREAT EASTERN RAILWAY WAR MEMORIAL - PROPOSED LOCATION PLAN Drawing · 03 Dec 2025
  • GREAT EASTERN RAILWAY WAR MEMORIAL - EXISTING LOCATION PLAN Drawing · 03 Dec 2025
  • ANDAZ PROPOSED LOCATION PLAN - LEVEL 00 Drawing · 03 Dec 2025
  • ANDAZ EXISTING LOCATION PLAN - LEVEL 00 Drawing · 03 Dec 2025
  • PROPOSED OVERSAILING PLAN Drawing · 03 Dec 2025
  • PROPOSED LOCATION PLAN - LEVEL 00 (UPPER CONCOURSE) Drawing · 03 Dec 2025
  • EXISTING LOCATION PLAN - LEVEL 00 (UPPER CONCOURSE) Drawing · 03 Dec 2025
  • PROPOSED SITE ELEVATIONS - SOUTH & WEST Drawing · 03 Dec 2025
  • PROPOSED SITE ELEVATIONS - NORTH & EAST Drawing · 03 Dec 2025
  • PROPOSED SITE PLAN - LEVEL ROOF Drawing · 03 Dec 2025
  • PROPOSED SITE PLAN - LEVEL B1 (LOWER CONCOURSE) Drawing · 03 Dec 2025
  • DEMOLITION SITE PLAN - LEVEL B1 Drawing · 03 Dec 2025
  • EXISTING SITE PLAN - LEVEL B1 Drawing · 03 Dec 2025
  • PROPOSED SITE PLAN - LEVEL TYPICAL UPPER Drawing · 03 Dec 2025
  • PROPOSED SITE PLAN - LEVEL 00 (UPPER CONCOURSE) Drawing · 03 Dec 2025
  • DEMOLITION SITE PLAN - LEVEL 00 Drawing · 03 Dec 2025
  • EXISTING SITE PLAN - LEVEL 00 Drawing · 03 Dec 2025
  • EXISTING FLOOR PLAN - LEVEL B1-B Drawing · 03 Dec 2025
  • EXISTING FLOOR PLAN - LEVEL 00-B Drawing · 03 Dec 2025
  • DEMOLITION ELEVATION - WEST Drawing · 03 Dec 2025
  • DEMOLITION SECTION C-C Drawing · 03 Dec 2025
  • DEMOLITION FLOOR PLAN - LEVEL B1-A Drawing · 03 Dec 2025
  • DEMOLITION FLOOR PLAN - LEVEL B1-B Drawing · 03 Dec 2025
  • DEMOLITION FLOOR PLAN - LEVEL 00-A Drawing · 03 Dec 2025
  • DEMOLITION FLOOR PLAN - LEVEL 00-B Drawing · 03 Dec 2025
  • REVISION 1 - AMENDMENTS AND SUPPLEMENTARY INFORMATION Cover Letter · 03 Dec 2025
  • PROPOSED ELEVATION - WEST Drawing · 03 Dec 2025
  • PROPOSED ELEVATION - NORTH Drawing · 03 Dec 2025
  • PROPOSED SECTION B-B Drawing · 03 Dec 2025
  • PROPOSED SECTION A-A Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL RF Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL B1-A (LOWER CONCOURSE) Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL B1-B (LOWER CONCOURSE) Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 19 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 18 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 17 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 16 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 15 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 14 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 13 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 12 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 11 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 10 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 09 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 08 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 07 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 06 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 05 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 04 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 03 Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 00-A (UPPER CONCOURSE) Drawing · 03 Dec 2025
  • PROPOSED FLOOR PLAN - LEVEL 00-B (UPPER CONCOURSE) Drawing · 03 Dec 2025
  • PROPOSED SECTION C-C Drawing · 03 Dec 2025
  • ENTRANCE C EXCHANGE SQUARE Drawing · 03 Dec 2025
  • STATION INTERFACE DETAILS 4 Drawing · 03 Dec 2025
  • DRAWING ISSUE REGISTER - LBC 1 STATION Drawings Schedule · 03 Dec 2025
  • COMMENTS - SAVE Consultee Comment · 22 Sep 2025
  • REPRESENTATION - LONDON AND MIDDLESEX ARCHAEOLOGICAL SOCIETY Public Comment · 20 Sep 2025
  • COMMENTS - THE COUNCIL FOR BRITISH ARCHAEOLOGY (CBA) Consultee Comment · 18 Sep 2025
  • COMMENTS - THE GEORGIAN GROUP Consultee Comment · 17 Sep 2025
  • COMMENTS - TWENTIETH CENTURY SOCIETY Consultee Comment · 16 Sep 2025
  • EXISTING SITE ELEVATIONS - NORTH AND EAST Drawing · 08 Apr 2025
  • EXISTING SITE ELEVATIONS - SOUTH AND WEST Drawing · 08 Apr 2025
  • DEMOLITION SITE ELEVATIONS - NORTH AND EAST Drawing · 08 Apr 2025
  • DEMOLITION SITE ELEVATIONS - SOUTH AND WEST Drawing · 08 Apr 2025
  • PROPOSED SITE ELEVATIONS - NORTH AND EAST Drawing · 08 Apr 2025
  • PROPOSED SITE ELEVATIONS - SOUTH AND WEST Drawing · 08 Apr 2025
  • EXISTING SITE PLAN - LEVEL 00 Drawing · 08 Apr 2025
  • DEMOLITION SITE PLAN - LEVEL 00 Drawing · 08 Apr 2025
  • PROPOSED SITE PLAN - LEVEL TYPICAL UPPER Drawing · 08 Apr 2025
  • EXISTING SITE PLAN - LEVEL B1 Drawing · 08 Apr 2025
  • DEMOLITION SITE PLAN - LEVEL B1 Drawing · 08 Apr 2025
  • EXISTING SITE PLAN - LEVEL B2 Drawing · 08 Apr 2025
  • DEMOLITION FLOOR PLAN - LEVEL B1-A Drawing · 08 Apr 2025
  • DEMOLITION FLOOR PLAN - LEVEL B2 Drawing · 08 Apr 2025
  • DEMOLITION FLOOR PLAN - LEVEL B3 Drawing · 08 Apr 2025
  • DEMOLITION FLOOR PLAN - LEVEL RF Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 17 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 18 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 19 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL B1-B (LOWER CONCOURSE) Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL B1-A (LOWER CONCOURSE) Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL B2 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL B3 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL RF Drawing · 08 Apr 2025
  • PROPOSED SECTION A-A Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 15 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 16 Drawing · 08 Apr 2025
  • ANDAZ PROPOSED - LEVEL B2 Drawing · 08 Apr 2025
  • ANDAZ EXISTING- LEVEL RF Drawing · 08 Apr 2025
  • ANDAZ DEMOLITION - LEVEL RF Drawing · 08 Apr 2025
  • ANDAZ PROPOSED - LEVEL RF Drawing · 08 Apr 2025
  • ANDAZ EXISTING - NORTH ELEVATION Drawing · 08 Apr 2025
  • ANDAZ EXISTING - EAST ELEVATION Drawing · 08 Apr 2025
  • ANDAZ EXISTING - SOUTH ELEVATION Drawing · 08 Apr 2025
  • ANDAZ EXISTING - WEST ELEVATION Drawing · 08 Apr 2025
  • ANDAZ DEMOLITION - NORTH ELEVATION Drawing · 08 Apr 2025
  • ANDAZ DEMOLITION - EAST ELEVATION Drawing · 08 Apr 2025
  • ANDAZ DEMOLITION - SOUTH ELEVATION Drawing · 08 Apr 2025
  • ANDAZ PROPOSED - EAST ELEVATION Drawing · 08 Apr 2025
  • ANDAZ PROPOSED - SOUTH ELEVATION Drawing · 08 Apr 2025
  • ANDAZ PROPOSED - WEST ELEVATION Drawing · 08 Apr 2025
  • ANDAZ MEMORIALS AND POLICE BOX EXISTING-LEVEL 00 Drawing · 08 Apr 2025
  • ANDAZ MEMORIALS AND POLICE BOX DEMOLITION- LEVEL 0 Drawing · 08 Apr 2025
  • ANDAZ MEMORIALS AND POLICE BOX PROPOSED - LEVEL 00 Drawing · 08 Apr 2025
  • ANDAZ DEMOLITION- LEVEL B2 Drawing · 08 Apr 2025
  • STATION INTERFACE DETAILS 3 Drawing · 08 Apr 2025
  • STATION INTERFACE DETAILS 4 Drawing · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH01-CONTENT AND INTRODUCTION Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-1-THE STATION Report - Design & Access Statement/Report · 08 Apr 2025
  • APPLICATIONFORMREDACTED Application Form · 08 Apr 2025
  • EXISTING LOCATION PLAN - LEVEL B2 - COPY Site Plan · 08 Apr 2025
  • PROPOSED LOCATION PLAN - LEVEL B2 Drawing · 08 Apr 2025
  • EXISTING LOCATION PLAN - LEVEL B3 - COPY Drawing · 08 Apr 2025
  • PROPOSED LOCATION PLAN - LEVEL B3 Drawing · 08 Apr 2025
  • EXISTING LOCATION PLAN - LEVEL 00 (UPPER CONCOURSE Drawing · 08 Apr 2025
  • PROPOSED LOCATION PLAN - LEVEL 00 (UPPER CONCOURSE Drawing · 08 Apr 2025
  • PROPOSED OVERSAILING PLAN Drawing · 08 Apr 2025
  • EXISTING LOCATION PLAN - LEVEL B1 (LOWER CONCOURSE Drawing · 08 Apr 2025
  • PROPOSED LOCATION PLAN - LEVEL B1 (LOWER CONCOURSE Drawing · 08 Apr 2025
  • EXISTING SITE PLAN - LEVEL B3 Drawing · 08 Apr 2025
  • EXISTING SITE PLAN - LEVEL B4 Drawing · 08 Apr 2025
  • EXISTING SITE PLAN - LEVEL ROOF Drawing · 08 Apr 2025
  • DEMOLITION SITE PLAN - LEVEL ROOF Drawing · 08 Apr 2025
  • PROPOSED SITE PLAN - LEVEL ROOF Drawing · 08 Apr 2025
  • EXISTING FLOOR PLAN - LEVEL B3 Drawing · 08 Apr 2025
  • EXISTING FLOOR PLAN - LEVEL ROOF A Drawing · 08 Apr 2025
  • EXISTING SECTION A-A Drawing · 08 Apr 2025
  • EXISTING SECTION B-B Drawing · 08 Apr 2025
  • EXISTING SECTION C-C Drawing · 08 Apr 2025
  • EXISTING SECTION D-D Drawing · 08 Apr 2025
  • EXISTING SECTION E-E Drawing · 08 Apr 2025
  • EXISTING ELEVATION - NORTH Drawing · 08 Apr 2025
  • EXISTING ELEVATION - EAST Drawing · 08 Apr 2025
  • EXISTING ELEVATION - SOUTH Drawing · 08 Apr 2025
  • EXISTING ELEVATION - WEST Drawing · 08 Apr 2025
  • EXISTING FLOOR PLAN - LEVEL 00-B Drawing · 08 Apr 2025
  • EXISTING FLOOR PLAN - LEVEL 00-A Drawing · 08 Apr 2025
  • EXISTING FLOOR PLAN - LEVEL B1-B Drawing · 08 Apr 2025
  • EXISTING FLOOR PLAN - LEVEL B1-A Drawing · 08 Apr 2025
  • EXISTING FLOOR PLAN - LEVEL B2 Drawing · 08 Apr 2025
  • DEMOLITION SECTION A-A Drawing · 08 Apr 2025
  • DEMOLITION SECTION B-B Drawing · 08 Apr 2025
  • DEMOLITION SECTION C-C Drawing · 08 Apr 2025
  • DEMOLITION SECTION D-D Drawing · 08 Apr 2025
  • DEMOLITION SECTION E-E Drawing · 08 Apr 2025
  • DEMOLITION ELEVATION - NORTH Drawing · 08 Apr 2025
  • DEMOLITION ELEVATION - EAST Drawing · 08 Apr 2025
  • DEMOLITION ELEVATION - SOUTH Drawing · 08 Apr 2025
  • DEMOLITION ELEVATION - WEST Drawing · 08 Apr 2025
  • DEMOLITION FLOOR PLAN - LEVEL 00-B Drawing · 08 Apr 2025
  • DEMOLITION FLOOR PLAN - LEVEL 00-A Drawing · 08 Apr 2025
  • DEMOLITION FLOOR PLAN - LEVEL B1-B Drawing · 08 Apr 2025
  • PROPOSED SECTION B-B Drawing · 08 Apr 2025
  • PROPOSED SECTION C-C Drawing · 08 Apr 2025
  • PROPOSED SECTION D-D Drawing · 08 Apr 2025
  • PROPOSED SECTION E-E Drawing · 08 Apr 2025
  • PROPOSED ELEVATION - NORTH Drawing · 08 Apr 2025
  • PROPOSED ELEVATION - EAST Drawing · 08 Apr 2025
  • PROPOSED ELEVATION - SOUTH Drawing · 08 Apr 2025
  • PROPOSED ELEVATION - WEST Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 00-B (UPPER CONCOURSE) Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 00-A (UPPER CONCOURSE) Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 03 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 04 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 05 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 06 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 07 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 08 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 09 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 10 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 11 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 12 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 13 Drawing · 08 Apr 2025
  • PROPOSED FLOOR PLAN - LEVEL 14 Drawing · 08 Apr 2025
  • ANDAZ DEMOLITION - WEST ELEVATION Drawing · 08 Apr 2025
  • ANDAZ PROPOSED - NORTH ELEVATION Drawing · 08 Apr 2025
  • ANDAZ EXISTING-LEVEL B1 Drawing · 08 Apr 2025
  • STATION INTERFACE DETAILS 5 Drawing · 08 Apr 2025
  • MEMORIAL INTERFACES Drawing · 08 Apr 2025
  • STATION INTERFACE DETAILS 1 Drawing · 08 Apr 2025
  • STATION INTERFACE DETAILS 2 Drawing · 08 Apr 2025
  • STATION TYPICAL DETAILS - NEW FACADE TO ANDAZ FACA Drawing · 08 Apr 2025
  • STATION ROOF DETAILS - NEW CONCOURSE ROOF TO EXIST Drawing · 08 Apr 2025
  • STATION TYPICAL DETAILS - WESTERN WALL AND COLUMNS Drawing · 08 Apr 2025
  • STATION TYPICAL DETAILS - WESTERN WALL AND COLUMNS Drawing · 08 Apr 2025
  • STATION TYPICAL DETAILS - EASTERN WALL AND COLUMNS Drawing · 08 Apr 2025
  • POLICE CALL BOX SUMMARY Drawing · 08 Apr 2025
  • SUMMARY OF HISTORICAL RELICS FOR PROPOSED REUSE Drawing · 08 Apr 2025
  • DRAWING ISSUE REGISTER - LBC 1 STATION (3) Drawing · 08 Apr 2025
  • LIVSS.01 LIVERPOOL STREET STATION HERITAGE IMPACT ASSESSMENT MARCH 2025 PT 2 (2) Accompanying report · 08 Apr 2025
  • LIVSS.01 LIVERPOOL STREET STATION HERITAGE IMPACT ASSESSMENT MARCH 2025 PT 3 (2) Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 1 VISUAL RECEPTORS AVRS_6OF7 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 1 VISUAL RECEPTORS AVRS_7OF7 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 2 DISCOUNTED VIEWS_1OF5 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 3 AND 4 AND 5 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 1 VISUAL RECEPTORS AVRS_1OF7 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 1 VISUAL RECEPTORS AVRS_2OF7 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 1 VISUAL RECEPTORS AVRS_3OF7 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 1 VISUAL RECEPTORS AVRS_4OF7 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 1 VISUAL RECEPTORS AVRS_5OF7 Accompanying report · 08 Apr 2025
  • 250402 - TOWN PLANNING STATEMENT (2) Report - Planning Statement/Report · 08 Apr 2025
  • APPENDIX A - TALL BUILDINGS ASSESSMENT FOR TOWN PLANNING STATEMENT (2) Report - Planning Statement/Report · 08 Apr 2025
  • APPENDIX B - DLSL ADDENDUM LETTER FOR TOWN PLANNING STATEMENT (2) Report - Planning Statement/Report · 08 Apr 2025
  • LSS COVER LETTER (10) Cover Letter · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-8-STATION ROOF Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-9-CELEBRATING HERITAGE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-4-SUSTAINABILITY Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-5-ACCESSIBILITY Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-6-1-LANDSCAPE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-6-2-LANDSCAPE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-6-3-LANDSCAPE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-6-4-LANDSCAPE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-6-5-LANDSCAPE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH03-1-DEVELOPMENT CONTEXT Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH05-1-DESIGN DEVELOPMENT Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH05-2-DESIGN DEVELOPMENT Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-1-DESIGN PROPOSALS Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-2-THE STATION Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-3-THE STATION Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-4-THE STATION Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-6-ENTRANCES Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-7-ENTRANCES Report - Design & Access Statement/Report · 08 Apr 2025
  • PROPOSED SITE PLAN - LEVEL 00 (UPPER CONCOURSE) Drawing · 08 Apr 2025
  • PROPOSED SITE PLAN - LEVEL B1 (LOWER CONCOURSE) Drawing · 08 Apr 2025
  • ANDAZ DEMOLITION- LEVEL B1 Drawing · 08 Apr 2025
  • ANDAZ PROPOSED - LEVEL B1 Drawing · 08 Apr 2025
  • ANDAZ EXISTING-LEVEL B2 Drawing · 08 Apr 2025
  • ENTRANCE A HOPE SQUARE Drawing · 08 Apr 2025
  • ENTRANCE B BISHOPSGATE SQUARE Drawing · 08 Apr 2025
  • ENTRANCE C EXCHANGE SQUARE Drawing · 08 Apr 2025
  • STATION TYPICAL DETAILS - NEW CONCOURSE TO ANDAZ Drawing · 08 Apr 2025
  • LIVSS.01 LIVERPOOL STREET STATION HERITAGE IMPACT ASSESSMENT MARCH 2025 PT1 (2) Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 2 DISCOUNTED VIEWS_2OF5 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 2 DISCOUNTED VIEWS_3OF 5 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 2 DISCOUNTED VIEWS_4OF5 Accompanying report · 08 Apr 2025
  • LSS_ES VOL II_TVIA_APPENDIX 2 DISCOUNTED VIEWS_5OF5 Accompanying report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-10-TFL TICKET HALLS Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-11-RETAIL DESTINATION Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-12-SUN STREET PASSAGE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-2-13-SERVICING Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-3-1-THE OFFICE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-3-2-THE OFFICE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-3-3-OSD FACADE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-3-4-ROOF GARDEN AND TERRACES Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-6-6-LANDSCAPE Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-7-1-LIGHTING Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-7-2-LIGHTING Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-9-SUMMARY Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-10-1-VIEWS Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH06-10-2-VIEWS Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH02-VISION AND DEVELOPMENT OBJECTIONS Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH03-2-DEVELOPMENT CONTEXT Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH03-3-DEVELOPMENT CONTEXT Report - Design & Access Statement/Report · 08 Apr 2025
  • 296-ACM-XX-XX-RP-A-10-001 - DAS-CH04-ENGAGEMENT AND CONSULTATION Report - Design & Access Statement/Report · 08 Apr 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided heritage and listed building applications in a median of 94 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In City of London

  • 24/01057/LBC Withdrawn

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Installation of 2x lanterns with hub branding and one internally illuminated sign.

    Received 2 Oct, published by the council 21 Oct 2026 Heritage and listed buildings
  • 26/01222/LBC Granted

    Rising Sun Public House 61 Carter Lane London EC4V 5DY

    Installation of 2no. eyebolt fixings to northern elevation to hold catenary wires to facilitate festive lighting and decoration displays

    Received 27 Aug, published by the council 8 Sep 2026 Heritage and listed buildings
  • 26/01179/LBC Granted

    Shaws Booksellers Public House 31 - 34 St Andrew's Hill London EC4V 5DE

    Alterations to a Listed building including: (i) installation of externally illuminated fascia signage, projecting signage and menu signs (ii) installation of nine awnings.

    Received 17 Aug, published by the council 26 Aug 2026 Heritage and listed buildings
  • 26/01167/LBC Granted

    4 Frederick's Place London EC2R 8AB

    1 x wall mounted non illuminated polished brass plaque.

    Received 13 Aug, published by the council 19 Aug 2026 Heritage and listed buildings
  • 26/00489/LBC Granted

    391 Cromwell Tower Barbican London EC2Y 8NB

    Replacement of timber service door with an aluminium framed glazed door at penthouse levels 39 - 40.

    Received 2 Apr, published by the council 24 Jul 2026 Heritage and listed buildings