Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Byward Street London EC3R 5AS

Withdrawn City of London 10/00358/FULL Full Planning Permission

Works: Windows or glazing

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Change of use of ground floor from financial and professional services (Class A2) to restaurant (Class A3) and installation of new shopfront.

As published by the council, reference 10/00358/FULL

Application record

Reference
10/00358/FULL
Type
Full Planning Permission
Status
Withdrawn
Decision
Withdrawn
Received
2 Jun 2010
Validated
8 Jun 2010
Decided
21 Jun 2010
Ward
Tower
Parish
Byward Street, 1/12
Decision by
Delegated
Postcode
EC3R 5AS

Timeline

Dates from the published record

  1. 2 Jun 2010

    Received by City of London

  2. 8 Jun 2010

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jun 2010

    Decision issued: Withdrawn

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 47-50 Mark Lane London EC3R 5AS

    24/01044/FULL Submitted 1 Oct 2024 0m away

    Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the variation of Conditions 53 (Fire Statement), 61 (Cycle Parking), 63 (Cycle Facilities), 73 (Use class floorspace) and 74 (Approved Drawings) of planning permission reference 22/01245/FULMAJ dated 20 September 2023, as amended by 24/00941/NMA on 20 September 2024 to allow the following amendments: i) Re-configuration of proposed massing; ii) Height of Block E located at rear of the Site increased by one storey; iii) Minor internal re-configuration of ground floor uses; iv) Refinement of facade to rear block (Block E); v) Improvements to cultural offer and public access provisions

    Granted Full applications 81 docs
  • 47-50 Mark Lane London EC3R 5AS

    24/00941/NMA Submitted 29 Aug 2024 0m away

    24/00941/NMA - Non-material amendment under Section 96a of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01245/FULMAJ dated 20.09.2023 to allow for an amended description of development by removing reference to 'ground plus 11 storey' so that it reads as: 'Demolition of existing buildings and structures, retention of existing basement and construction of a new office led mixed use building with associated external roof terraces; hard and soft landscaping works; servicing and plant; provision of cycle storage; and ancillary works.'

    Granted Amendments Demolition 4 docs
  • 47-50 Mark Lane London EC3R 5AS

    26/01153/PODC Submitted 11 Aug 2026 0m away

    99% historically approved · decision due ~7 Oct

    Submission of the Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 3.5 and Local Procurement Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).

    Decided 4 docs
  • 47-50 Mark Lane London EC3R 5AS

    26/01137/MDC Submitted 7 Aug 2026 0m away

    99% historically approved · decision due ~2 Oct

    Submission of details of Piling Methods Statement pursuant to condition 12 of Planning Permission 24/01044/FULL dated 25.03.2025.

    Awaiting decision 4 docs
  • 47-50 Mark Lane London EC3R 5AS

    26/01158/MDC Submitted 12 Aug 2026 0m away

    99% historically approved · decision due ~7 Oct

    Submission of details of Climate Resilience pursuant to condition 9 of Planning Permission 24/01044/FULL dated 25.03.2025.

    Awaiting decision 3 docs
  • 47-50 Mark Lane London EC3R 5AS

    26/01152/MDC Submitted 11 Aug 2026 0m away

    99% historically approved · decision due ~6 Oct

    Submission of details of Scheme of Protective Works pursuant to condition 4 of Planning Permission 24/01044/FULL dated 25.03.2025.

    Awaiting decision 3 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications