Skip to content
PlanIndex Get alerts
Menu

Planning application

St Bartholomews Hospital West Smithfield London EC1A 7BE

Granted City of London 24/00761/FULL Full Planning Permission

Works: Extension Demolition Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Refurbishment and extension of the Catering Block (Class C2) to provide a Breast Cancer Treatment Centre (Class C2) to include (i) two storey glazed link bridge to East Wing; (ii) first floor projecting glazed extension; (iii) partial demolition of Catering Block roof for installation of new plant with louvred screening; (iv) new doors at second floor for access to roof terrace; (v) new glazing and entrance doors at ground floor; and associated works.

As published by the council, reference 24/00761/FULL

Application record

Reference
24/00761/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
17 Jul 2024
Validated
17 Jul 2024
Decided
31 Jan 2025
Ward
Farringdon Without
Decision by
Delegated
Postcode
EC1A 7BE

Site history

Applications at this address on the City of London register

This site has had 4 applications since 2023: 4 approved, 0 refused.

  • 24/00709/FULL Granted

    St Bartholomews Hospital West Smithfield London EC1A 7BE

    Installation of 4no. chillers, on big foot system supports, on the roof.

    Decided 9 Oct 2024 Full applications
  • 23/01008/MDC Granted

    St Bartholomews Hospital West Smithfield London EC1A 7BE

    Submission of details of a scheme of protective works pursuant to condition (2) and a construction logistics plan pursuant to condition (3) of planning permission dated 03.08.2021 (ref: 20/00693/FULL).

    Decided 14 Dec 2023 Conditions
  • 23/00163/LBC Granted

    St Bartholomews Hospital West Smithfield London EC1A 7BE

    The installation of new power outlets and wireless access points and associated wiring. Removal of redundant surface wiring and conduit and replacement of existing fittings with new fittings to match.

    Decided 29 Mar 2023 Heritage and listed buildings

Timeline

Dates from the published record

  1. 17 Jul 2024

    Received by City of London

  2. 31 Jan 2025

    Decision issued: Approved

  3. 10 Oct 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Barts Health NHS Trust Applicant

3 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

72 documents on file for this application

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 31 Jan 2025
  • COMMENTS - CCAAC Consultee Comment · 11 Oct 2024
  • COMMENTS-HISTORIC ENGLAND Consultee Comment · 11 Sep 2024
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT Accompanying report · 09 Sep 2024
  • INDOOR AIR QUALITY PLAN Accompanying report · 17 Jul 2024
  • GA EW CB GRD PLAN PRO Drawing · 17 Jul 2024
  • GA EW CB 1ST PLAN PRO Drawing · 17 Jul 2024
  • GA EW CB 2ND PLAN PRO Drawing · 17 Jul 2024
  • GA EW CB 3RD PLAN PRO Drawing · 17 Jul 2024
  • GA EW CB BASE PLAN PRO Drawing · 17 Jul 2024
  • GA EW CB ROOF PLAN PRO Drawing · 17 Jul 2024
  • EW CB GRD RCP PRO Drawing · 17 Jul 2024
  • EW CB 1ST RCP PRO Drawing · 17 Jul 2024
  • EW CB 2ND RCP PRO Drawing · 17 Jul 2024
  • EW CB BASE RCP PRO Drawing · 17 Jul 2024
  • SECTION C-C PROPOSED Drawing · 17 Jul 2024
  • BREEAM ENE04 LZC FEASIBILITY Accompanying report · 17 Jul 2024
  • TRANSPORT STATEMENT Report - Transport Statement/Report · 17 Jul 2024
  • TRAVEL PLAN Report - Travel Plan · 17 Jul 2024
  • DESIGN AND ACCESS STATEMENT Report - Design & Access Statement/Report · 17 Jul 2024
  • EW CB GRD PLAN DEMO Drawing · 17 Jul 2024
  • EW CB 1ST PLAN DEMO Drawing · 17 Jul 2024
  • EW CB 2ND PLAN DEMO Drawing · 17 Jul 2024
  • EW CB 3RD PLAN DEMO Drawing · 17 Jul 2024
  • EW CB BASE PLAN DEMO Drawing · 17 Jul 2024
  • EW CB ROOF PLAN DEMO Drawing · 17 Jul 2024
  • EW CB GRD PLAN EXG Drawing · 17 Jul 2024
  • EW CB 1ST PLAN EXG Drawing · 17 Jul 2024
  • EW CB 2ND PLAN EXG Drawing · 17 Jul 2024
  • EW CB 3RD PLAN EXG Drawing · 17 Jul 2024
  • EW CB BASE PLAN EXG Drawing · 17 Jul 2024
  • EW CB ROOF PLAN EXG Drawing · 17 Jul 2024
  • EXG ELEVATIONS 1 2 Drawing · 17 Jul 2024
  • EXG ELEVATIONS 3 4 Drawing · 17 Jul 2024
  • EXG ELEVATIONS 5 6 Drawing · 17 Jul 2024
  • DEMO ELEVATIONS 1 2 Drawing · 17 Jul 2024
  • DEMO ELEVATIONS 3 4 Drawing · 17 Jul 2024
  • DEMO ELEVATIONS 5 6 Drawing · 17 Jul 2024
  • EW CB GRD PLAN FLOORING Drawing · 17 Jul 2024
  • EW CB 1ST PLAN FLOORING Drawing · 17 Jul 2024
  • EW CB 2ND PLAN FLOORING Drawing · 17 Jul 2024
  • EW CB BASE PLAN FLOORING Drawing · 17 Jul 2024
  • EW CB GRD PLAN FLOOR COLOURS Drawing · 17 Jul 2024
  • EW CB 1ST PLAN FLOOR COLOURS Drawing · 17 Jul 2024
  • EW CB 2ND PLAN FLOOR COLOURS Drawing · 17 Jul 2024
  • CB TUNNEL THEATRES MOODBOARD Drawing · 17 Jul 2024
  • EW CB GRD PLAN PARTITIONS Drawing · 17 Jul 2024
  • EW CB 1ST PLAN PARTITIONS Drawing · 17 Jul 2024
  • EW CB 2ND PLAN PARTITIONS Drawing · 17 Jul 2024
  • EW CB BASE PLAN PARTITIONS Drawing · 17 Jul 2024
  • A TREE CONSTRAINTS PLAN Report - Tree Report · 17 Jul 2024
  • ABORICULTURAL IMPACT ASSESSMENT, METHOD STATEMENT AND TREE PROTECTION PLAN Report - Tree Report · 17 Jul 2024
  • TREE SURVEY SCHEDULE Report - Tree Report · 17 Jul 2024
  • PRO ELEVATIONS 1 2 Drawing · 17 Jul 2024
  • PRO ELEVATIONS 3 4 Drawing · 17 Jul 2024
  • PRO ELEVATIONS 5 6 Drawing · 17 Jul 2024
  • CURTAIN WALLING CB LINK BRIDGE Drawing · 17 Jul 2024
  • GA EW CB A-A SECTION Drawing · 17 Jul 2024
  • GA EW CB B-B SECTION Drawing · 17 Jul 2024
  • SITE PLAN FOR MAIN WORKS CATERING BLOCK PLAN Site Plan · 17 Jul 2024
  • LOCATION PLAN Site Plan · 17 Jul 2024
  • CONSTRUCTION MANAGEMENT PLAN Accompanying report · 17 Jul 2024
  • APPLICATIONFORMREDACTED Application Form · 17 Jul 2024
  • EXG 3D Drawing · 17 Jul 2024
  • PRO 3D Drawing · 17 Jul 2024
  • RENDER IMAGES 1 Drawing · 17 Jul 2024
  • RENDER IMAGES 2 Drawing · 17 Jul 2024
  • DAYLIGHT AND SUNLIGHT ASSESSMENT 11 3 2024 Report - Daylight/Sunlight Report · 17 Jul 2024
  • SUMMARY OF ACOUSTIC SURVEY RESULTS TECHNICAL NOTE Report - Acoustic/Noise Report · 17 Jul 2024
  • NOISE IMPACT ASSESSMENT Report - Acoustic/Noise Report · 17 Jul 2024
  • BREEAM PRE-ASSESSMENT REPORT Accompanying report · 17 Jul 2024
  • ARCHAEOLOGICAL DESK BASED ASSESSMENT Accompanying report · 11 Jul 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 31 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications