Skip to content
PlanIndex Get alerts
Menu

Planning application

King George V Block St Bartholomew's Hospital West Smithfield London EC1A 7BE

Withdrawn City of London 19/01198/FULL Full Planning Permission

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Upgrade to the existing telecommunications equipment comprising: (i) replacement of three antennas with six antennas; (ii) replacement of one 300mm dish; (iii) replacement of one cabinet with two cabinets; (iv) replacement of three Remote Amplifiers (RHA) with nine Remote Radio Units (RRU); and (vi) ancillary development thereto.

As published by the council, reference 19/01198/FULL

Application record

Reference
19/01198/FULL
Type
Full Planning Permission
Status
Withdrawn
Decision
Withdrawn
Received
18 Nov 2019
Validated
18 Nov 2019
Decided
22 May 2022
Ward
Farringdon Without
Decision by
Delegated Decision
Postcode
EC1A 7BE

Timeline

Dates from the published record

  1. 18 Nov 2019

    Received by City of London

  2. 22 May 2022

    Decision issued: Withdrawn

  3. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Hove

2 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications