Planning application
41 Charterhouse Square London EC1M 6EA
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to existing roof and roof glazing together with replacement of rear second floor windows.
As published by the council, reference 24/00731/FULL
Application record
- Reference
- 24/00731/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 9 Jul 2024
- Validated
- 9 Jul 2024
- Decided
- 9 Oct 2024
- Ward
- Farringdon Within
- Decision by
- Delegated Decision
- Postcode
- EC1M 6EA
Timeline
Dates from the published record
-
9 Jul 2024
Received by City of London
-
9 Oct 2024
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Bournemouth
7 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
First And Second Floor Flat 41 Charterhouse Square London EC1M 6EA
Install replacement windows to south elevation at 3rd floor level.
Granted Full applications Windows or glazing 19 docs -
Second Floor Flat 41 Charterhouse Square London EC1M 6EA
Observations to the City of London on the development 'Application for installation of an Air Source Heat Pump (ASHP) to flat roof area' (City of London ref: 26/01012/FULL).
Decided 2 docs -
Second Floor Flat 41 Charterhouse Square London EC1M 6EA
99% historically approved · decision due ~10 Sep
Installation of an Air Source Heat Pump (ASHP) to flat roof area.
Awaiting decision Full applications 13 docs -
33 - 37 Charterhouse Square London EC1M 6EA
Submission of details of a Travel Plan pursuant to Condition 11 of planning permission dated 22/08/2019 (ref: 19/00119/FULL)
Granted Conditions 4 docs -
42 - 43 Charterhouse Square London EC1M 6EW
100% historically approved · decision due ~2 Mar
Submission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due to the proposed works; (b) provide detailed design and Risk Assessment Method Statement for all demolition, temporary and permanent works; (c) provide detailed design and Risk Assessment Method Statement on the use of tall plant/scaffolding/lifting equipment; (d) demonstrate that there will at no time be any potential security risk to our railway, property or structures; (e) mitigate the effects of noise arising from the proposed works on LU assets; and (f) no works to commence on any part of TfL/LU Property or in it's airspace until any agreements required with TfL Engineering, TfL Property or TfL Legal have been agreed and signed by all parties pursuant to condition 5 of planning permission 24/00155/FULL dated 02/07/2024.
Awaiting decision Conditions Demolition 14 docs -
Second Floor Flat 42 Charterhouse Square London EC1M 6EA
Replacement of 3no. casement windows at second floor flats, at the rear elevation.
Granted Full applications New dwelling Windows or glazing 16 docs
Other full applications applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.