Planning application
Hill House 1 Little New Street London EC4A 3JR
Works: Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing building above ground with retention of existing basement and piles/ foundations and erection of a mixed use office building comprising two basement levels, lower ground, upper ground and upper ground mezzanine plus 18 upper storeys for the provision of office space (Use Class E), gym/auditorium (Use Class E), flexible office, cafe/retail (Use Class E), reprovision of existing library (Use Class F1), flexible library/office (Use Class F1/E) and restaurant (Use Class E), discontinuance of the City Walkway (Little New Street To Wine Office Court), enhanced and enlarged public realm, hard and soft landscaping, highway works, and associated enabling works. (PLEASE NOTE: This application is accompanied by an Environmental Statement. Copies of the Environmental Statement are available from Avison Young, 65 Gresham Street, London EC2V 7NQ).
As published by the council, reference 23/01102/FULMAJ
Application record
- Reference
- 23/01102/FULMAJ
- Type
- Full Major Application
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 2 Oct 2023
- Validated
- 19 Oct 2023
- Decided
- 28 Mar 2025
- Ward
- Castle Baynard
- Decision by
- Planning and Transportation Committee
- Postcode
- EC4A 3JR
Site history
Applications at this address on the City of London register
This site has had 5 applications since 2023: 5 approved, 0 refused.
-
26/01161/PODC Granted
Hill House 1 Little New Street London EC4A 3JR
Submission of Decanting Strategy pursuant to Schedule 3, Paragraph 16.19.1 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
-
26/01164/PODC Granted
Hill House 1 Little New Street London EC4A 3JR
Submission of Temporary Library Management Plan pursuant to Schedule 3, Paragraph 16.19.3 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
-
26/01163/PODC Granted
Hill House 1 Little New Street London EC4A 3JR
Submission of Temporary Library Inventory and Specification pursuant to Schedule 3, Paragraph 16.19.3 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
-
25/01008/NMA Granted
Hill House 1 Little New Street London EC4A 3JR
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 23/01102/FULMAJ dated 28 March 2025 to allow for amendments to Condition 41 (roof terrace access hours), Condition 76 (GEA areas); and Condition 77 (Approved Plans).
Timeline
Dates from the published record
-
2 Oct 2023
Received by City of London
-
19 Oct 2023
Validated
Checked as complete and ready for consideration.
-
28 Mar 2025
Decision issued: Approved
-
2 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
5 later applications on the register refer to this one:
-
23/01102/FULMAJ/S106 Awaiting decision
Hill House 1 Little New Street London
Application to amend the Section 106 agreement dated 28th March 2025 (ref. 23/01102/FULMAJ) under Section 106A(3) of the Town and Country Planning Act 1990 (as amended) in respect of Hill House, 1 Little New Street, London, EC4A 3JR.
-
26/01161/PODC Granted
Hill House 1 Little New Street London EC4A 3JR
Submission of Decanting Strategy pursuant to Schedule 3, Paragraph 16.19.1 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
-
26/01164/PODC Granted
Hill House 1 Little New Street London EC4A 3JR
Submission of Temporary Library Management Plan pursuant to Schedule 3, Paragraph 16.19.3 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
-
26/01163/PODC Granted
Hill House 1 Little New Street London EC4A 3JR
Submission of Temporary Library Inventory and Specification pursuant to Schedule 3, Paragraph 16.19.3 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
-
25/01008/NMA Granted
Hill House 1 Little New Street London EC4A 3JR
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 23/01102/FULMAJ dated 28 March 2025 to allow for amendments to Condition 41 (roof terrace access hours), Condition 76 (GEA areas); and Condition 77 (Approved Plans).
Who's behind it
Company information only, from the register and Companies House
Avison Young Limited Agent
1,597 applications on PlanIndex · across 184 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordLS Hill House Ltd Applicant, registered in London
Active · incorporated 2001 · London
4 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
421 documents on file for this application
- DEED OF AGREEMENT
- PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
- RESPONSE TO COL ACCESS COMMENTS
- TRANSCRIPT FOR MEMBERS BRIEFING
- TFL TRANSPORT RESPONSE NOTE
- LIBRARY AREAS - EXISTING & PROPOSED
- PLANNING SCHEDULE SUMMARY
- PRE COMMITTEE BRIEFING
- PRE COMMITTEE BRIEFING
- PRE COMMITTEE BRIEFING
- COMMENTS - FLEET STREET QUARTER
- TRANSPORT RESPONSE NOTE
- LETTER - HILL HOUSE DEVELOPMENT UPDATE - NICK MAJOR
- LETTER - HILL HOUSE DEVELOPMENT UPDATE - LETTER - HILL HOUSE DEVELOPMENT UPDATE
- LETTER - HILL HOUSE DEVELOPMENT UPDATE - DEAN KHANNA
- REPRESENTATION - JESS BULL
- REPRESENTATION -DANIAL ZAMRI
- REPRESENTATION - JESS
- REPRESENTATION-CASPER MCKENSIE
- REPRESENTATION - SOPHIE
- REPRESENTATION - ISOBEL ROBERTS
- REPRESENTATION - ISSY RIGLESFORD
- REPRESENTATION-MOLLY RICHARDSON
- REPRESENTATION - KIT HOLDRIDGE
- REPRESENTATION - HOLLY HETHERINGTON
- REPRESENTATION-SOPHIE BLEANEY
- REPRESENTATION - NANCY WALTER
- REPRESENTATION - FELIX SMITH
- REPRESENTATION - EMILY
- REPRESENTATION - LOUIS COOKE
- REPRESENTATION - DOUGAL MURRAY
- REPRESENTATION - BRADLEY HUGHES
- REPRESENTATION - ARCHIE OSEI
- REPRESENTATION - LIAM MARTIN
- REPRESENTATION - SOPHIA
- REPRESENTATION - AKSHAY LOOMBA
- REPRESENTATION - SYONA
- REPRESENTATION - TOKI
- REPRESENTATION - RISHI P
- REPRESENTATION - ROBERT GUTHRIE
- REPRESENTATION - DOUGAL MURRAY
- REPRESENTATION - ARJEN XANI
- REPRESENTATION - SHRUTI
- REPRESENTATION - EC
- REPRESENTATION - JACK
- REPRESENTATION - FIONA SINCLAIR
- REPRESENTATION - JOCELYN PHIMISTER
- REPRESENTATION - JO RIGBY
- REPRESENTATION - CAMERON ARTHUR
- REPRESENTATION - AVI
- REPRESENTATION - EE LI
- REPRESENTATION - AMELIA SAUNDERS
- REPRESENTATION - ALEX DAVIES
- REPRESENTATION - WILL BATT
- REPRESENTATION - SHIVANI KUMAR
- REPRESENTATION - LIESEL DE SILVA
- REPRESENTATION - ANNA NIEDERLANDER
- REPRESENTATION - LIESEL DE SILVA
- GENERAL ARRANGEMENT SECTION - SECTION 01 - EAST TO WEST
- GENERAL ARRANGEMENT PLAN - UPPER GROUND MEZZANINE
- HH_PLANNING SCHEDULE_NIA & TERRACES_R02
- DRAWINGS REGISTER
- BAY STUDY - LIBRARY & GYM ENTRANCES
- GENERAL ARRANGEMENT ELEVATION - SOUTH WEST ELEVATION
- GENERAL ARRANGEMENT ELEVATION - WEST ELEVATION
- GENERAL ARRANGEMENT ELEVATION - SOUTH ELEVATION
- GENERAL ARRANGEMENT PLAN - LOWER GROUND
- HH_PLANNING SCHEDULE_GEA & GIA_R02
- SOUTH EAST CORNER
- PUBLIC REALM
- GENERAL ARRANGEMENT PLAN - LOWER & UPPER GROUND FLOORS - COMPOSITE PLAN
- GENERAL ARRANGEMENT PLAN - UPPER GROUND
- GENERAL ARRANGEMENT PLAN - LEVEL B2
- CARBON OPTIONEERING REPORT
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE SPREADSHEET
- DESCRIPTION OF EXISTING BUILDING & SCHEME OPTIONS
- LETTER REGARDING COMMENTS TO AMANDA SINGLETON
- LETTER REGARDING COMMENTS TO SAMER TASLAQ
- LETTER REGARDING COMMENTS TO DANIEL LANGAN
- TITLE & HIGHWAYS BOUNDARY PLAN
- CIRCULAR ECONOMY
- DPR RESPONSE TO GIA REVIEW REPORT
- COMMENTS - TFL
- RESPONSE TO DESIGN COMMENTS
- RESPONSE TO PEMBERTON HOUSE NEIGHBOUR OBJECTIONS ? DAYLIGHT AND SUNLIGHT
- CARBON EMISSION REPORTING SPREADSHEET
- GLA CIRCULAR ECONOMY STATEMENTS TEMPLATE
- LIBRARY DESIGN UPDATE_FINAL
- 3RD PARTY REVIEW
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT
- PLANNING SPREADSHEET
- RESPONSE TO C20 SOCIETY COMMENTS
- COMMENTS - ROYAL BOROUGH OF GREENWICH
- EMAIL - RESPONSE TO HISTORIC ENGLAND'S COMMENTS
- COMMENTS - CAMDEN
- COMMENTS - TRANSPORT FOR LONDON
- TREE SURVEY & ARBORICULTURAL IMPACT ASSESSMENT
- COMMENTS-LONDON BOROUGH OF SOUTHWARK
- COMMENTS-NATURAL ENGLAND
- TITLE & HIGHWAYS BOUNDARY PLAN
- COMMENTS - CAROE ARCHITECTURE
- COMMENTS - ROYAL BOROUGH OF GREENWICH
- COMMENTS - SURVEYOR TO THE FABRIC - ST PAUL?S CATHEDRAL
- WST 05 - ADAPTATION TO CLIMATE CHANGE RISK STRATEGY - RIBA STAGE 2
- COMMENTS-GREATER LONDON AUTHORITY
- FLUE SECTION
- COMMENTS-TRANSPORT FOR LONDON
- COMMENTS - LONDON BOROUGH OF TOWER HAMLETS
- GLA TEMPLATE SPREADSHEET FOR WLC
- COMMENTS - TWENTIETH CENTURY SOCIETY
- COMMENTS - HEATHROW SAFEGUARDING
- COMMENTS-NETWORK RAIL
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - HISTORIC ENGLAND
- COMMENTS - CROSSRAIL SAFEGUARDING
- COMMENTS - THAMES WATER
- COMMENTS - NATS SAFEGUARDING
- COMMENTS - HEATHROW SAFEGUARDING
- COMMENTS - LONDON CITY AIRPORT
- TVIA (PART 11)
- COMMENTS - NATURAL ENGLAND - ANNEX A ? ADDITIONAL ADVICE
- COMMENTS - THE GARDENS TRUST
- COMMENTS - NATURAL ENGLAND
- COMMENTS - ENVIRONMENT AGENCY
- COMMENTS - TFL
- COMMENTS - TFL
- COMMENTS - THAMES WATER
- COVER LETTER
- COMMENTS - NATS SAFEGUARDING
- COMMENTS - HEATHROW SAFEGUARDING
- COMMENTS - CITY AIRPORT
- COMMENTS-WESTMINSTER COUNCIL
- EXISTING SECTION 01-EAST TO WEST
- EXISTING ELEVATIONS - EAST ELEVATION
- EXISTING WEST ELEVATION
- GENERAL ARRANGEMENT PLAN - ROOF LEVEL
- GENERAL ARRANGEMENT ELEVATION - NORTH ELEVATION
- EXISTING SECTION 02 - NORTH TO SOUTH
- EXISTING ELEVATIONS - NORTH ELEVATION
- EXISTING ELEVATIONS - SOUTH ELEVATION
- GENERAL ARRANGEMENT ELEVATION - EAST ELEVATION
- GENERAL ARRANGEMENT ELEVATION - SOUTH ELEVATION
- GENERAL ARRANGEMENT ELEVATION - WEST ELEVATION
- GENERAL ARRANGEMENT ELEVATION - SOUTH WEST ELEVATION
- APPLICATION FORM - REDACTED
- AIR QUALITY IMPACT ASSESSMENT
- WHOLE LIFE CARBON OPTIONEERING STUDY
- COVER LETTER
- CULTURAL STRATEGY (PART 1)
- THERMAL COMFORT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT (PART 1)
- STATEMENT OF COMMUNITY INVOLVEMENT (PART 2)
- STATEMENT OF COMMUNITY INVOLVEMENT (PART 3)
- STATEMENT OF COMMUNITY INVOLVEMENT (PART 4)
- STATEMENT OF COMMUNITY INVOLVEMENT (PART 5)
- GENERAL ARRANGEMENT PLAN - UPPER GROUND MEZZANINE
- EXISTING PLAN - LEVEL 01
- DEMOLITION PLAN - LEVEL 01
- APPLICATION.XML
- APPLICATION.JSON
- SOLAR GLARE REPORT
- CIL FORM
- DELIVERY AND SERVICING PLAN
- WHOLE LIFE CYCLE CARBON ASSESSMENT
- WIND MICROCLIMATE ASSESSMENT
- DAYLIGHT AND SUNLIGHT ASSESSMENT (PART 1)
- DAYLIGHT AND SUNLIGHT ASSESSMENT (PART 2)
- UTILITIES STRATEGY (PART 1)
- UTILITIES STRATEGY (PART 2)
- SUSTAINABILITY STATEMENT
- TRANSPORT ASSESSMENT (PART 1)
- TRANSPORT ASSESSMENT (PART 2)
- TRANSPORT ASSESSMENT (PART 3)
- SECURITY NEEDS ASSESSMENT
- SOCIAL VALUE STATEMENT
- EXISTING PLAN - BASEMENT LEVEL 02
- DEMOLITION PLAN - BASEMENT LEVEL 02
- GENERAL ARRANGEMENT PLAN - LEVEL B2
- EXISTING PLAN - BASEMENT LEVEL 01
- DEMOLITION PLAN - BASEMENT LEVEL 01
- GENERAL ARRANGEMENT PLAN - LEVEL B1
- EXISTING PLAN - LOWER GROUND
- DEMOLITION PLAN - LOWER GROUND
- GENERAL ARRANGEMENT PLAN - LOWER GROUND
- EXISTING PLAN - UPPER GROUND
- DEMOLITION PLAN - UPPER GROUND
- GENERAL ARRANGEMENT PLAN - UPPER GROUND
- GENERAL ARRANGEMENT PLAN - LEVEL 01
- DEMOLITION PLAN - LEVEL 03
- GENERAL ARRANGEMENT PLAN - LEVEL 03
- EXISTING PLAN - LEVEL 04
- DEMOLITION PLAN - LEVEL 04
- GENERAL ARRANGEMENT PLAN - LEVEL 04
- EXISTING PLAN - LEVEL 05
- EXISTING PLAN - LEVEL 06
- DEMOLITION PLAN - LEVEL 06
- DEMOLITION PLAN - LEVEL 07
- GENERAL ARRANGEMENT PLAN - LEVEL 07
- EXISTING PLAN - ROOF LEVEL
- DEMOLITION PLAN - ROOF LEVEL
- GENERAL ARRANGEMENT PLAN - LEVEL 08
- GENERAL ARRANGEMENT PLAN - LEVEL 12
- GENERAL ARRANGEMENT PLAN - LEVEL 13
- GENERAL ARRANGEMENT PLAN - LEVEL 14
- GENERAL ARRANGEMENT PLAN - LEVEL 15
- GENERAL ARRANGEMENT PLAN - LEVEL 16
- GENERAL ARRANGEMENT PLAN - LEVEL 17
- GENERAL ARRANGEMENT PLAN - LEVEL 18
- GENERAL ARRANGEMENT PLAN - LEVEL 18 MEZZANINE
- GENERAL ARRANGEMENT PLAN - ROOF LEVEL
- EXISTING ELEVATIONS - NORTH ELEVATION
- GENERAL ARRANGEMENT ELEVATION - WEST ELEVATION
- GENERAL ARRANGEMENT ELEVATION - SOUTH WEST ELEVATION
- BAY STUDY - MAIN OFFICE ENTRANCE
- BAY STUDY - LIBRARY & GYM ENTRANCES
- CULTURAL STRATEGY (PART 2)
- CULTURAL STRATEGY (PART 3)
- CULTURAL STRATEGY (PART 4)
- CULTURAL STRATEGY (PART 5)
- CULTURAL STRATEGY (PART 6)
- VENTILATION AND EXTRACTION STATEMENT (PART 1)
- VENTILATION AND EXTRACTION STATEMENT (PART 9)
- VENTILATION AND EXTRACTION STATEMENT (PART 8)
- VENTILATION AND EXTRACTION STATEMENT (PART 7)
- VENTILATION AND EXTRACTION STATEMENT (PART 6)
- VENTILATION AND EXTRACTION STATEMENT (PART 5)
- VENTILATION AND EXTRACTION STATEMENT (PART 4)
- VENTILATION AND EXTRACTION STATEMENT (PART 3)
- VENTILATION AND EXTRACTION STATEMENT (PART 2)
- VENTILATION AND EXTRACTION STATEMENT (PART 13)
- VENTILATION AND EXTRACTION STATEMENT (PART 12)
- VENTILATION AND EXTRACTION STATEMENT (PART 11)
- VENTILATION AND EXTRACTION STATEMENT (PART 10)
- PLANNING STATEMENT
- EXISTING PLAN - LEVEL 02
- DEMOLITION PLAN - LEVEL 02
- GENERAL ARRANGEMENT PLAN - LEVEL 02
- EXISTING PLAN - LEVEL 03
- DEMOLITION PLAN - LEVEL 05
- GENERAL ARRANGEMENT PLAN - LEVEL 05
- GENERAL ARRANGEMENT PLAN - LEVEL 09
- BAY STUDY - LOADING BAY
- BAY STUDY - MAIN FACADE
- PUBLIC REALM PLAN GENERAL ARRANGEMENT
- LANDSCAPE GENERAL ARRANGEMENT TERRACES LEVEL 1-4
- LANDSCAPE GENERAL ARRANGEMENT TERRACES 5-18
- PUBLIC REALM GUNPOWDER SQUARE
- PUBLIC REALM OFFICE ARRIVAL
- PLANTER STUDY - REV 19
- CIRCULAR ECONOMY STATEMENT (PART 1)
- CIRCULAR ECONOMY STATEMENT (PART 2)
- CIRCULAR ECONOMY STATEMENT (PART 3)
- TRAVEL PLAN
- FIRE SAFETY STATEMENT
- PHASE 1 CONTAMINATION REPORT (PART 1)
- PHASE 1 CONTAMINATION REPORT (PART 2)
- PHASE 1 CONTAMINATION REPORT (PART 3)
- PHASE 1 CONTAMINATION REPORT (PART 4)
- PHASE 1 CONTAMINATION REPORT (PART 5)
- PHASE 1 CONTAMINATION REPORT (PART 6)
- FLOOD RISK ASSESSMENT (PART 3)
- ECONOMIC BENEFITS STATEMENT
- ENERGY STATEMENT
- LIGHTING STRATEGY (PART 1)
- LIGHTING STRATEGY (PART 2)
- LIGHTING STRATEGY (PART 3)
- LIGHTING STRATEGY (PART 4)
- ENVIRONMENTAL STATEMENT VOLUME 1: MAIN TEXT (PART 1)
- ENVIRONMENTAL STATEMENT VOLUME 1: MAIN TEXT (PART 2)
- ENVIRONMENTAL STATEMENT VOLUME 4: NON-TECHNICAL SUMMARY
- LIBRARY MANAGEMENT PLAN
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 6)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 7)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 10)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 11)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 12)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 13)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 14)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 15)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 16)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 17)
- GENERAL ARRANGEMENT PLAN - LEVEL 06
- EXISTING PLAN - LEVEL 07
- GENERAL ARRANGEMENT PLAN - LEVEL 10
- GENERAL ARRANGEMENT PLAN - LEVEL 11
- EXISTING ELEVATIONS - EAST ELEVATION
- EXISTING ELEVATIONS - SOUTH ELEVATION
- BAY STUDY - TERRACE TYPICAL
- BAY STUDY - PAVILION
- PUBLIC REALM SOUTH EAST CORNER
- LANDSCAPE SECTION OFFICE ARRIVAL
- GUNPOWDER SQUARE INDICATIVE SECTION - EXISTING SERVICES
- GUNPOWDER SQUARE SERVICES LOCATION PLAN
- NOISE IMPACT ASSESSMENT
- ARCHAEOLOGICAL DESK BASED ASSESSMENT (PART 1)
- ARCHAEOLOGICAL DESK BASED ASSESSMENT (PART 2)
- PLANNING SCHEDULES - DEMOLITION GEA & GIA
- PLANNING SCHEDULES - EXISTING GEA & GIA
- PLANNING SCHEDULES - GEA & GIA
- PLANNING SCHEDULES - NIA & TERRACES
- EQUALITY STATEMENT
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 3)
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 4)
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 5)
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 6)
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 7)
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 8)
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 9)
- OPERATIONAL WASTE MANAGEMENT PLAN
- OUTLINE CONSTRUCTION LOGISTICS PLAN
- PRELIMINARY ECOLOGICAL APPRAISAL (PEA), BREEAM ECOLOGY AND BIODIVERSITY NET GAI
- PRELIMINARY ECOLOGICAL APPRAISAL (PEA), BREEAM ECOLOGY AND BIODIVERSITY NET GAI
- WIND MICROCLIMATE ASSESSMENT (PART 1)
- WIND MICROCLIMATE ASSESSMENT (PART 2)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 1)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 2)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 3)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 5)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 8)
- LANDSCAPE AND PUBLIC REALM STRATEGY (PART 9)
- TVIA (PART 1)
- TVIA (PART 10)
- TVIA (PART 2)
- TVIA (PART 3)
- TVIA (PART 4)
- TVIA (PART 5)
- TVIA (PART 6)
- TVIA (PART 7)
- TVIA (PART 8)
- TVIA (PART 16)
- TVIA (PART 17)
- TVIA (PART 18)
- TVIA (PART 19)
- TVIA (PART 20)
- DESIGN AND ACCESS STATEMENT (PART 1)
- DESIGN AND ACCESS STATEMENT (PART 10)
- DESIGN AND ACCESS STATEMENT (PART 6)
- DESIGN AND ACCESS STATEMENT (PART 11)
- DESIGN AND ACCESS STATEMENT (PART 12)
- DESIGN AND ACCESS STATEMENT (PART 13)
- DESIGN AND ACCESS STATEMENT (PART 24)
- DESIGN AND ACCESS STATEMENT (PART 25)
- DESIGN AND ACCESS STATEMENT (PART 26)
- DESIGN AND ACCESS STATEMENT (PART 27)
- DESIGN AND ACCESS STATEMENT (PART 28)
- DESIGN AND ACCESS STATEMENT (PART 29)
- DESIGN AND ACCESS STATEMENT (PART 30)
- DESIGN AND ACCESS STATEMENT (PART 41)
- DESIGN AND ACCESS STATEMENT (PART 42)
- DESIGN AND ACCESS STATEMENT (PART 43)
- DESIGN AND ACCESS STATEMENT (PART 44)
- SITE PLAN
- EXISTING SITE PLAN
- EXISTING SITE PLAN - SITE LOCATION PLAN
- EXISTING ELEVATIONS - WEST ELEVATION
- GENERAL ARRANGEMENT PLAN - LOWER & UPPER GROUND FLOORS - COMPOSITE PLAN
- GENERAL ARRANGEMENT SECTION - SECTION 01 - EAST TO WEST
- GENERAL ARRANGEMENT SECTION - SECTION 02 - NORTH TO SOUTH
- GENERAL ARRANGEMENT ELEVATION - NORTH ELEVATION
- GENERAL ARRANGEMENT ELEVATION - EAST ELEVATION
- GENERAL ARRANGEMENT ELEVATION - SOUTH ELEVATION
- HEALTH IMPACT ASSESSMENT
- FLOOD RISK ASSESSMENT (PART 1)
- FLOOD RISK ASSESSMENT (PART 2)
- ENVIRONMENTAL STATEMENT VOLUME 3: APPENDICES (PART 2)
- DESIGN AND ACCESS STATEMENT (PART 4)
- DESIGN AND ACCESS STATEMENT (PART 5)
- DESIGN AND ACCESS STATEMENT (PART 7)
- DESIGN AND ACCESS STATEMENT (PART 8)
- DESIGN AND ACCESS STATEMENT (PART 9)
- DESIGN AND ACCESS STATEMENT (PART 31)
- DESIGN AND ACCESS STATEMENT (PART 45)
- DESIGN AND ACCESS STATEMENT (PART 46)
- DESIGN AND ACCESS STATEMENT (PART 47)
- DESIGN AND ACCESS STATEMENT (PART 48)
- DESIGN AND ACCESS STATEMENT (PART 49)
- DESIGN AND ACCESS STATEMENT (PART 50)
- DESIGN AND ACCESS STATEMENT (PART 51)
- DESIGN AND ACCESS STATEMENT (PART 52)
- TVIA (PART 9)
- TVIA (PART 12)
- TVIA (PART 13)
- TVIA (PART 14)
- TVIA (PART 15)
- TVIA (PART 21)
- TVIA (PART 22)
- TVIA (PART 23)
- TVIA (PART 24)
- TVIA (PART 25)
- TVIA (PART 26)
- TVIA (PART 27)
- TVIA (PART 28)
- TVIA (PART 29)
- TVIA (PART 30)
- TVIA (PART 31)
- TVIA (PART 32)
- TVIA (PART 33)
- TVIA (PART 34)
- TVIA (PART 35)
- TVIA (PART 36)
- DESIGN AND ACCESS STATEMENT (PART 2)
- DESIGN AND ACCESS STATEMENT (PART 3)
- DESIGN AND ACCESS STATEMENT (PART 14)
- DESIGN AND ACCESS STATEMENT (PART 15)
- DESIGN AND ACCESS STATEMENT (PART 16)
- DESIGN AND ACCESS STATEMENT (PART 17)
- DESIGN AND ACCESS STATEMENT (PART 18)
- DESIGN AND ACCESS STATEMENT (PART 19)
- DESIGN AND ACCESS STATEMENT (PART 20)
- DESIGN AND ACCESS STATEMENT (PART 21)
- DESIGN AND ACCESS STATEMENT (PART 22)
- DESIGN AND ACCESS STATEMENT (PART 23)
- DESIGN AND ACCESS STATEMENT (PART 32)
- DESIGN AND ACCESS STATEMENT (PART 33)
- DESIGN AND ACCESS STATEMENT (PART 34)
- DESIGN AND ACCESS STATEMENT (PART 35)
- DESIGN AND ACCESS STATEMENT (PART 36)
- DESIGN AND ACCESS STATEMENT (PART 37)
- DESIGN AND ACCESS STATEMENT (PART 38)
- DESIGN AND ACCESS STATEMENT (PART 39)
- DESIGN AND ACCESS STATEMENT (PART 40)
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 28 March 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hill House 1 Little New Street London EC4A 3JR
Observations requested by City of London for Demolition of existing building above ground with retention of existing basement and piles/foundations and erection of a mixed use office building comprising two basement levels, lower ground, upper ground and upper ground mezzanine plus 18 upper storeys for the provision of office space (Use Class E), gym/auditorium (Use Class E), flexible office, café/retail (Use Class E), reprovision of existing library (Use Class F1), flexible library/office (Use Class F1/E) and restaurant (Use Class E), discontinuance of the City Walkway, enhanced and enlarged public realm, hard and soft landscaping, highway works, and associated enabling works.
Granted Demolition 2 docs -
Hill House, 1 Little New Street, London, EC4A 3JR
Demolition of existing building above ground with retention of existing basement and piles/foundations and erection of a mixed use office building comprising two basement levels, lower ground, upper ground and upper ground mezzanine plus 18 upper storeys for the provision of office space (Use Class E), gym/auditorium (Use Class E), flexible office, café/retail (Use Class E), reprovision of existing library (Use Class F1), flexible library/office (Use Class F1/E) and restaurant (Use Class E), discontinuance of the City Walkway (Little New Street To Wine Office Court), enhanced and enlarged public realm, hard and soft landscaping, highway works, and associated enabling works. (PLEASE NOTE: This application is accompanied by an Environmental Statement. Copies of the Environmental Statement are available from Avison Young, 65 Gresham Street, London EC2V 7NQ).
Granted Outline Demolition 4 docs -
Hill House, 1 Little New Street, London, EC4A 3JR
Demolition of existing building above ground with retention of existing basement and piles/foundations and erection of a mixed use office building comprising two basement levels, lower ground, upper ground and upper ground mezzanine plus 18 upper storeys for the provision of office space (Use Class E), gym/auditorium (Use Class E), flexible office, café/retail (Use Class E), reprovision of existing library (Use Class F1), flexible library/office (Use Class F1/E) and restaurant (Use Class E), discontinuance of the City Walkway, enhanced and enlarged public realm, hard and soft landscaping, highway works, and associated enabling works.
Granted Outline Demolition 4 docs -
Hill House 1 Little New Street London EC4A 3JR
Submission of Decanting Strategy pursuant to Schedule 3, Paragraph 16.19.1 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
Granted 3 docs -
Hill House 1 Little New Street London EC4A 3JR
Submission of Temporary Library Management Plan pursuant to Schedule 3, Paragraph 16.19.3 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
Granted 4 docs -
Hill House 1 Little New Street London EC4A 3JR
Submission of Temporary Library Inventory and Specification pursuant to Schedule 3, Paragraph 16.19.3 of the Section 106 agreement dated 28th March 2025 (planning reference no. 23/01102/FULMAJ)
Granted 3 docs
Other full applications
In City of London
-
26/01083/FULL Granted
Offices Chapter House St Paul's Churchyard London EC4M 8AD
Alterations to undercroft of St Paul's Cathedral and minor alterations to Chapter House including (i) Installation of a new passenger lift and associated raised platform within the external contemporary undercroft of St Paul's Cathedral to provide step-free access between the Chapter House and the undercroft (ii) extension of the existing step at the eastern exit of the Chapter House following partial demolition of existing external staircase, landing, and railings to provide level access and replacement of existing security gate (iii) raising the floor level and removal of associated stairs at below-ground level and installation of external, open platform lift in undercroft (No other works to the Cathedral or wider undercroft).
-
26/01051/FULL Granted
55 Mark Lane London EC3R 7NE
Application under S73 of the Town and Country Planning Act 1990 (as amended) to allow the removal of condition 2 (refuse collection) of planning permission 15/00931/FULL dated 29/10/2015.
-
24/00544/FULL Granted
6 -7 New Street London EC2M 4TP
Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.
-
26/00858/FULL Granted
Condor House 10 St Paul's Churchyard London EC4M 8AL
Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.
-
26/01104/FULL Granted
30 - 34 Moorgate London EC2R 6DA
Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.