Planning application
21 Moorfields London EC2Y 9DB
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details of (a) The level of noise emitted from any new plant shall be lower than the existing background level by at least 10 dBA. Noise levels shall be determined at one metre from the window of the nearest noise sensitive premises. The background noise level shall be expressed as the lowest LA90 (10 minutes) during which plant is or may be in operation; (b) Following installation but before the new plant comes into operation measurements of noise from the new plant must be taken and a report demonstrating that the plant as installed meets the design requirements shall be submitted to and approved in writing by the Local Planning Authority; and (c) All constituent parts of the new plant shall be maintained and replaced in whole or in part as often is required to ensure compliance with the noise levels approved by the Local Planning Authority pursuant to condition 28 of planning permission 17/01095/FULEIA dated 04/05/2018.
As published by the council, reference 23/01075/MDC
Application record
- Reference
- 23/01075/MDC
- Type
- Submission of details (Planning)
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 28 Sep 2023
- Validated
- 28 Sep 2023
- Decided
- 19 Jul 2024
- Ward
- Coleman Street
- Decision by
- Delegated Decision
- Postcode
- EC2Y 9DB
Site history
Applications at this address on the City of London register
This site has had 3 applications since 2023: 3 approved, 0 refused.
-
23/00649/MDC Granted
21 Moorfields London EC2Y 9DB
Submission of acoustic, noise and vibration report pursuant to Condition 31 of planning permission 17/01095/FULEIA dated 04.05.2018
-
23/00061/ADVT Granted
21 Moorfields London EC2Y 9DB
Installation and display of one non-illuminated fascia sign measuring 5.869m in width and 0.922m in height, at a height above ground of 3.915m.
Timeline
Dates from the published record
-
28 Sep 2023
Received by City of London
-
19 Jul 2024
Decision issued: Approved
-
29 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 19 July 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
101 Moorgate London EC2M 6SL
Submission of details of detailed design and construction method statements for all of the ground floor structures, foundations and basements and for any other structures below ground level, including piling, any other temporary or permanent installations and for site investigations; and a method statement to include arrangements to secure that, during any period when concurrent construction is taking place of both the permitted development and of the Crossrail structures and tunnels in or adjacent to the site of the approved development, the construction of the Crossrail structures and tunnels is not impeded; pursuant to conditions 2 and 3 of planning permission 20/00325/FULEIA dated 06.08.2020.
Granted Conditions 29 docs -
101 Moorgate London EC2M 6SL
Submission of details of materials and construction methods to be used to minimise noise/odour penetration pursuant to condition 23 of Planning permission 20/00325/FULEIA dated 28.07.2021.
Granted Conditions 4 docs -
101 Moorgate London EC2M 6SA
Submission of a post-construction BREEAM assessment pursuant to discharge condition 27 of planning permission 20/00325/FULEIA dated 28.07.2021.
Granted Conditions 7 docs -
101 Moorgate London EC2M 6SL
Submission of details of the green roofs and walls pursuant to condition 26 of planning permission 20/00325/FULEIA dated 28/07/2021.
Granted Conditions 16 docs -
101 Moorgate London EC2M 6SL
Erection of a new building for office (Class B1) and retail/cafe (Class A1/A3) uses comprising part basement, ground, mezzanine and eight upper floors plus rooftop plant enclosure and roof terrace. Creation of new public thoroughfare.
Granted Full applications 103 docs -
101 Moorgate London EC2M 6SL
Submission of details of fume extract arrangements, materials and construction methods pursuant to condition 23 of planning permission 20/00325/FULEIA dated 06.08.2020.
Granted Conditions 5 docs
Other condition discharge and variation applications
In City of London
-
26/01219/MDC Granted
Tower 42 International Financial Centre 25 Old Broad Street London EC2N 1HQ
Submission of details of the materials to be used on external faces pursuant to discharge of Condition 2(a) of planning permission 24/01203/FULL dated 02.06.2025.
-
26/01308/MDC Awaiting decision
1 Poultry London EC2R 8EJ
Submission of Protection of Historic Fabric report and Heritage Fabric Protection Register pursuant to condition 5 of planning permission 25/01714/LBC dated 07.08.2026.
-
26/01244/MDC Awaiting decision
60 Queen Victoria Street London EC4N 4TZ
Submission of landscaping details and a Landscape and Ecology Management Plan pursuant to discharge of Condition 5, 17(d), 18(d) and 33 planning permission 23/01422/FULMAJ dated 11.04.2025.
-
26/01248/MDC Awaiting decision
20 Giltspur Street London EC1A 9DD
Submission of Security Management Plan pursuant to Condition 34 of planning permission 22/00867/FULMAJ dated 14.09.2023.
-
26/01249/MDC Awaiting decision
6 - 11 Crescent London EC3N 2LY
Submission of details Access Management Plan pursuant to condition 16 of Planning Permission 24/00776/FULL dated 11.07.2025.