Planning application
38 - 39 Charterhouse Square London EC1M 6EA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details of a plant noise report pursuant to Condition 3 of planning permission dated 10.03.2020 (ref: 19/01239/FULL).
As published by the council, reference 23/00248/MDC
Application record
- Reference
- 23/00248/MDC
- Type
- Submission of details (Planning)
- Status
- Decided
- Decision
- Approved
- Received
- 8 Mar 2023
- Validated
- 8 Mar 2023
- Decided
- 19 Apr 2023
- Ward
- Farringdon Within
- Decision by
- Delegated Decision
- Postcode
- EC1M 6EA
Timeline
Dates from the published record
-
8 Mar 2023
Received by City of London
-
19 Apr 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy
12 applications on PlanIndex · across 5 councils · 80% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Second Floor Flat 41 Charterhouse Square London EC1M 6EA
Observations to the City of London on the development 'Application for installation of an Air Source Heat Pump (ASHP) to flat roof area' (City of London ref: 26/01012/FULL).
Decided 2 docs -
41 Charterhouse Square London EC1M 6EA
Alterations to existing roof and roof glazing together with replacement of rear second floor windows.
Granted Full applications Windows or glazing 17 docs -
First And Second Floor Flat 41 Charterhouse Square London EC1M 6EA
Install replacement windows to south elevation at 3rd floor level.
Granted Full applications Windows or glazing 19 docs -
Second Floor Flat 41 Charterhouse Square London EC1M 6EA
99% historically approved · decision due ~10 Sep
Installation of an Air Source Heat Pump (ASHP) to flat roof area.
Awaiting decision Full applications 13 docs -
33 - 37 Charterhouse Square London EC1M 6EA
Submission of details of a Travel Plan pursuant to Condition 11 of planning permission dated 22/08/2019 (ref: 19/00119/FULL)
Granted Conditions 4 docs -
33 - 37 Charterhouse Square London EC1M 6EA
Submission of details of the provision for disabled people to obtain access to the building;; a Construction and Environmental Plan, a Traffic Management and Construction Logistics Plan pursuant to conditions 2, 3 and 4 of planning permission dated 22nd August 2019 (19/00119/FULL).
Granted Conditions 12 docs
Other conditions applications
In City of London
-
26/00710/MDC Granted
1 Exchange Square London EC2A 2JN
Submission of ventilation details and fume extract arrangements pursuant to discharge of condition 17 of planning permission 21/00930/FULMAJ dated 14.06.2023.
-
25/01327/MDC Granted
1 New Change London EC4M 9AF
Submission of an Inclusive Access Management Plan prior to the first occupation of the development for (a) the library use (F1 use); pursuant to condition 9a of planning permission 24/00481/FULL dated 06/12/2024.
-
26/00933/MDC Granted
122 Minories And 14 Crosswall London EC3N 1NT
Submission of Circlular Economy Post Completion Report and Circular Economy Statements pursuant to discharge of Condition 23 of planning permission 22/00035/FULMAJ dated 09.08.2022.
-
26/00667/MDC Granted
9A - 9B Crutched Friars London EC3N 2AU
Submission of details of Construction Management Plan pursuant to condition 4 of Planning Permission 23/00895/FULL dated 10.05.2024.
-
25/01673/MDC Granted
54 King William Street London EC4R 9AD
Submission of details of plant noise and installation pursuant to condition 2 (part B) of planning permission 24/00504/FULL dated 03/04/2025.