Skip to content
PlanIndex Get alerts
Menu

Planning application

23/00179/PODC

61 - 65 Holborn Viaduct London EC1A 2FD

Granted City of London Planning Obligations

Proposal

Submission of a Highways Schedule of Condition Survey pursuant to Schedule 3, Paragraph 6.2 of the Section 106 Agreement dated 02.09.2022 (Planning Ref. 21/00781/FULMAJ).

As published by the council, reference 23/00179/PODC

Timeline

Dates from the published record

  1. 14 Feb 2023

    Received by City of London

  2. 14 Mar 2023

    Decision issued: Approved

  3. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that City of London is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 22/01174/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of a Construction Environmental Management Plan, Baseline Environmental Survey, Site Waste Management Plan, and Noise, Vibration and Dust Monitoring Plan pursuant to condition 2 of planning permission 21/00781/FULMAJ, dated 02.09.2022.

    5 Dec 2022 0m away Conditions
  • 25/01278/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of elevations, luminaire schedule, lighting calculations and layout pursuant to discharge of condition 42 of planning permission 22/01243/FULMAJ dated 21.09.2023.

    17 Sep 2025 3m away Conditions
  • 25/01073/NMA Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01243/FULMAJ dated 11 October 2023 to: amend the wording of Condition 47 to reduce minimum loading bay headroom from 4.6m to 3.8m.

    6 Aug 2025 3m away Amendments
  • 25/00580/MDC Awaiting decision

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of water mains plan, piling layout, Circular Economy Statement, Whole Life Cycle Carbon Assessment, Climate Change Resilience, Water contamination, Land contamination and Hostile Vehicle Mitigation Summary Strategy pursuant to Condition 7, 13, 14,15, 16, 17, 18 and 19 of planning permission 21/00781/FULMAJ dated 02.09.2022, as amended by 22/01243/FULMAJ dated 21.09.2023.

    29 Apr 2025 3m away Conditions
  • 25/01788/FULL Granted

    61-65 Holborn Viaduct London EC1A 2FD

    Use of the site as Purpose-Built Student Accommodation to include unrestricted lets outside of the Academic Year (Sui Generis); and temporary change of use of from Purpose Built Student Accommodation (Sui Generis) to flexible Purpose-Built Student Accommodation (Sui Generis) / Hotel Use (Class C1) for the 2027/28 Academic Year only.

    19 Dec 2025 3m away Full applications
  • 26/00244/FULL Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 45 (Cycle Parking) to update the cycle parking mix and quantum and vary condition 63 (Approved Drawings) to replace the amenity spaces on levels 02 to 05 with four additional PBSA studio rooms, reflect the change in cycle parking arrangement and introduce the new larger amenity space at Basement level 02 of planning permission 22/01243/FULMAJ dated 21/09/2023.

    16 Feb 2026 3m away Full applications