Planning application

59 Carter Lane London EC4V 5AQ

Granted City of London 23/00141/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of four VRF condenser units on the roof and associated free standing guardrails

As published by the council, reference 23/00141/FULL

Application record

Reference
23/00141/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
7 Feb 2023
Validated
7 Feb 2023
Decided
13 Apr 2023
Ward
Castle Baynard
Decision by
Delegated Decision
Postcode
EC4V 5AQ

Timeline

Dates from the published record

  1. 7 Feb 2023

    Received by City of London

  2. 13 Apr 2023

    Decision issued: Approved

  3. 18 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Sevenoaks

7 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 59 Carter Lane London EC4V 5AQ

    26/00436/MDC Submitted 26 Mar 2026 0m away

    Submission of details of acoustic technical note pursuant to Condition 8 of planning permission 24/01004/FULL dated 18.03.2025.

    Granted Conditions 5 docs
  • 59 Carter Lane London EC4V 5AQ

    25/00855/MDC Submitted 2 Jul 2025 0m away

    Submission of Construction Logistics Plan pursuant to Condition 13 of Planning Permission 24/01004/FULL dated 18.03.2025.

    Granted Conditions 11 docs
  • 59 Carter Lane London EC4V 5AQ

    25/01024/MDC Submitted 31 Jul 2025 0m away

    Submission of details and samples pursuant to discharge of Condition 16 of planning permission 24/01004/FULL dated 18.03.2025.

    Granted Conditions 7 docs
  • 59 Carter Lane London EC4V 5AQ

    26/00662/MDC Submitted 6 May 2026 0m away

    Submission of details of Vibration Isolation Scheme pursuant to Condition 6 of Planning Permission 24/01004/FULL dated 18.03.2025.

    Granted Conditions 7 docs
  • 59 Carter Lane London EC4V 5AQ

    25/00884/MDC Submitted 8 Jul 2025 0m away

    Submission of Environmental Management Plan pursuant to discharge of Condition 7 of Planning Permission 24/01004/FULL dated 18.03.2025.

    Granted Conditions 6 docs
  • 59 Carter Lane London EC4V 5AQ

    26/00503/MDC Submitted 9 Apr 2026 0m away

    Submission of details of Acoustics Plant Commissioning Report pursuant to Condition 4 of planning permission 24/01004/FULL dated 18.03.2025.

    Granted Conditions 5 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications