Skip to content
PlanIndex Get alerts
Menu

Planning application

Liverpool Street Station Liverpool Street London

Awaiting decision City of London 23/00089/SCOP Scoping/Screening Opinion

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Redevelopment above and within Liverpool Street Station

As published by the council, reference 23/00089/SCOP

Application record

Reference
23/00089/SCOP
Type
Scoping/Screening Opinion
Status
Under Consideration
Received
26 Jan 2023
Validated
14 Feb 2023
Ward
Bishopsgate
Decision by
Delegated

Timeline

Dates from the published record

  1. 26 Jan 2023

    Received by City of London

  2. 14 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 10 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 11 April 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 85 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 85 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In City of London

  • 25/01422/DPAR Granted

    4 Lindsey Street London EC1A 9HP

    An application for Prior Approval under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the installation of solar PV panels on the roof of the building.

    15 Oct 2025 Outline
  • 25/00905/PIP Refused

    Baltic Street West London EC1Y 0ST

    Application for Permission in Principle for the erection a self-build single storey dwelling with detached single storey garage and gardens on the existing paved pedestrian open space with 2no mature trees to be retained.

    10 Jul 2025 Outline
  • 25/01217/DPAR Granted

    15 Fetter Lane London EC4A 1BW

    Determination under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 as to whether prior approval is required for the installation of Photovoltaic Panels on the roof of the building.

    3 Sep 2025 Outline
  • 25/00001/DPAR Granted

    Tower Place West Tower Place London EC3R 5BU

    Determination under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 as to whether prior approval is required for the installation of Photovoltaic Panels on the roof of the building.

    2 Jan 2025 Outline
  • 24/01245/SCOP Granted

    1 Silk Street London EC2Y 8AL

    The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of the site at 1 Silk Street. The proposed development comprises demolition of the existing buildings retaining the basement and erection of a single building comprising ground floor and up to 20 storeys with a maximum height of 95.9m AOD for office (Use Class E(g)) and complementary uses including retail, food and beverage, professional services, indoor sport, health, learning and local community (Use Classes E(a/b/c/d/e) and F1/F2); formation of new public routes and spaces through the site; provision of landscaping within the site and along adjoining streets, including Silk Street; and ancillary uses and plant.

    22 Nov 2024 Outline